KDR

report(s) found: 10100

Process stream characterization and chemical control at SEK gathering center (14 GC's)

2003

KISR Report

Amendment "B "

Contributor(s):  Jumaa, M. A.

Subject(s):  Corrosion. ,  Chemical control. ,  SEK.

Project(s):  Assessment and Control Parameters in Seawater Injection System (North Kuwait )

Project code:  PP 016C

View document

Assessment of the sand and gravel resources of Kuwait, Volume V C, Inventory of construction sand resources, appendices C, D and E

1988

KISR Report

Final Report

Contributor(s):  Al-Bakri, D.

Subject(s):  Laboratory results. Field data. Lithological logs. Sulphate content. Chloride content. Grain size analysis. Sand.

Project(s):  Assesment of the Sand and Gravel Resources of Kuwait

Project code:  EES 67

View document

Evaluation of enhanced oil recovery (EOR) techniques for kuwait oil reservoirs. phase 1. reservoir screening

2002

KISR Report

Final Report

Contributor(s):  Jumaa, M.

Subject(s):  Enhanced oil recovery (EOR). ,  Waterflood. ,  Steam flood. ,  Immiscible. ,  Miscible.

Project(s):  Evaluation of Enhanced Oil Recovery (EOR) Techniques for Kuwait Oil

Project code:  PP 015K

View document

Exploration of clay deposits in Jal-Az-Zor area, Kuwait For industrial applications

1982

KISR Report

Pre-Proposal

Contributor(s):  Salman, A. S.

Subject(s):  Jal Az-Zor Area. Clay deposits. Industrial applications. Boreholes. Petrography. Mineralogy. Geochemical studies and Geological mapping.

Project(s):  Exploration of Clay Deposits in Jal-Az-Zor Area, Kuwait for Industrial Applications

Project code:  EES 50

View document

PVT, Phase behavior and viscosity measurements and modeling of Tuba formation bottom hole sample well SA-266

2008

KISR Report

Technical Report

Contributor(s):  Al Marri, Salem.

Subject(s):  Petroleum Engineering ,  Petroleum Engineering ,  Oil Reservoir engineering ,  Oil reservoir engineering

Project(s):  PVT, Phase Behavior and Viscosity Measurements and Modeling of Tuba Formation Bottom Hole Sample Well SA-266

Project code:  PP 059S

View document

Synergism of corrosion, scale, and biocide inhibitors on the corrosion behaviour of carbon steel under downhole conditions

2000

KISR Report

Proposal

Contributor(s):  Al-Sayeigh, A.

Subject(s):  Corrosion inhibitors. ,  Downhole. ,  Carbon steel. ,  Biocides. ,  Scale inhibitors.

Project(s):  Synergism of Corrosion, Scale and Biocide Inhibitors on the Corrosion Behavior of Carbon Steel Under Downhole Conditions

Project code:  PR 009C

View document

Subsurface water rise in residential areas of Kuwait

1985

KISR Report

Progress Report

Contributor(s):  Hamdan, L.

Subject(s):  Progress. Accomplishments. Work plan. Staffing. Equipment. Computer data management system. Drilling Manuals.

Project(s):  Study of Subsurface Water Rise in the Residential Area of Kuwait

Project code:  EES 56

View document

Ardas catalyst selection : validation of performance assessment methodologyl

2006

KISR Report

Proposal

Contributor(s):  Bahzad, D.

Subject(s):  Heavy residue desulfurization. ,  Hydrotreating. ,  Pilot plants. ,  Catalyst Evaluation.

Project(s):  ARDS Catalyst Selection: Validation of Performance Assessment Methodology

Project code:  PF 033C

View document

The Microbiological aspect of oil field injection system field trials for sewater in north Kuwait.

2006

KISR Report

Technical Report No. 2

Contributor(s):  Mataqi, K.

Subject(s):  Chemicals. ,  Treatment. ,  Water injection. ,  Seawater. ,  Field trials.

Project(s):  Assessment and Control Parameters in Seawater Injection System (North Kuwait )

Project code:  PP 017C

View document

Subsurface water rise in residential areas of Kuwait

1986

KISR Report

Progress Report No. 2

Contributor(s):  Hamdan, L.

Subject(s):  Well drilling. Water level. Geotechnical testing. Geological analysis. Hydrology. Aquifer models.

Project(s):  Study of Subsurface Water Rise in the Residential Area of Kuwait

Project code:  EES 56

View document

An approach to cool storage assessment study

1984

KISR Report

Interim Report No. 1

Contributor(s):  Suri, R. K.

Subject(s):  Cool storage. Peak power shaving. Cool storage volume.

Project(s):  An Approach to Cool Storage Assessment Study

Project code:  SE 54

View document

Flat-plate collectors :

1983

KISR Report

Final Report

Contributor(s):  Maheshwari, G. P.

Subject(s):  Domestic solar water heaters. Thermal energy collection efficiency. Electrical energy saving capability.

Project(s):  Flat-Plate Collectors: Test Results and Analysis

Project code:  SE 50

View document