KDR

report(s) found: 10000

Protection of hydrogen from hydrogen sulfide by solar energy. Phase ll

1985

KISR Report

Proposal

Contributor(s):  Salman, O.

Subject(s):  Thermochemical decomposition. Hydrogen sulfide. Concentrated solar radiation.

Project(s):  Protection of Hydrogen from Hydrogen Sulfide by Solar Energy. Phase II

Project code:  PRO 20 KISR

View document

Solar house

1979

KISR Report

Proposal

Contributor(s):  Ayyash, S.

Subject(s):  Solar house. Cooling system. Solar system.

Project(s):  Solar House

Project code:  SE 1 KISR/

View document

Polymer and material testing facility

1989

KISR Report

Extension "A".

Contributor(s):  Rasoul, F. A.

Subject(s):  Polymers. Mechanical. Physical and thermal properties.

Project(s):  Polymer and Material Testing Facility

Project code:  PRO 32

View document

Ards catalysts selection :

2010

KISR Report

Final Report

Contributor(s):  Al-Fadhli, Jamal.

Subject(s):  Catalyst ,  Catalyst ,  Metals ,  Metals ,  Metal removal. ,  Sulfur removal. ,  Asphaltene removal. ,  CCR reduction. ,  ازالة الشوائب. ,  ازالة الكبريت. ,  تخفيض الأسفلتين. ,  تخفيض الكربون الرسوبى من المخلفات النفطية الثقيلة.

Project(s):  ARDS Catalyst Selection: Validation of Performance Assessment Methodology

Project code:  PF 033C

View document

Performance evaluation of novel isomerization catalyst for commercial applications

2018

KISR Report

Final Report

Contributor(s):  Jassem, Fatma.

Subject(s):  Catalyst ,  Pressure ,  Chemistry ,  Temperatures ,  Mo2o3/ Tio3 Hs- 10. ,  Normal hexane. ,  Light straight run naphtha. ,  2MP. ,  3MP. ,  22DMB. ,  23D MB

Project(s):  Performance Evaluation of Novel Isomerization Catalyst for Commercial Applications

Project code:  PF 064K

View document

Evaluation of polyethylene-coated urea as a slow release nitrogen fertilizer

1989

KISR Report

Final Report

Contributor(s):  Salman, O.

Subject(s):  Sulfur-coated urea. Agronomic evaluation. Urea release in the soil. Pilot plant.

Project(s):  Evaluation of Polyethylene-Coated Urea as A Slow Release Nitrogen Fertilizer

Project code:  PRO 25

View document

Development of a modeling tool for ARD catalyst assessment

2016

KISR Report

Final Report

Contributor(s):  Chehadeh, Dhuha.

Subject(s):  Sulfur ,  Sulfur ,  petroleum ,  Petroleum ,  Oil filters ,  Oil filters ,  Oil analysis ,  Oil analysis ,  Predictive modeling ,  Predictive modeling ,  Desulphurization ,  Desulphurization

Project(s):  Development of a Modeling Tool for ARD Catalyst Assessment

Project code:  PF 065K

View document

Development of soil stabilizer. Phase 1

1986

KISR Report

Draft Preproposal.

Contributor(s):  Lahalih, S. M.

Subject(s):  Soil stablizers. Soil erosion. Sand movement. Sulfonated amino aldehyde resins. Water soluble polymers.

Project(s):  Development of Soil Stabilizer. Phase 1

Project code:  PRO 22

View document

Optimization of the atmospheric residue desulfurization process using a new catalyst loading profile wth heavier feedstock

2014

KISR Report

Final Report

Contributor(s):  Bahzad, Dawood.

Subject(s):  Heavy oil ,  Hydrotreating catalysts ,  Petroleum waste ,  Catalysts ,  Heavy Crude Oil. ,  Catalyst deacitivation. ,  catalyst life cycle. ,  Modeling. ,  النفط الثقيل. ,  تعطيل فعالية المواد الحفازة. ,  العمر الزمنى للمواد لاحفازة. ,  أداة المحاكاة.

Project(s):  Optimization of the Atmospheric Residue Desulfurization Process Using a New Catalyst Loading Profile wth Heavier Feedstock

Project code:  PF 054K

View document

Asphaltene deposition and formation damage in Kuwaiti oil reservoir, south east Kuwait (SEK)

2012

KISR Report

Final Report

Contributor(s):  Juma, Mohammad.

Subject(s):  Oil ,  Oil ,  Production ,  Production ,  Asphaltene onset point. ,  Bubble piont. ,  ضغط نقطة تكون الأسفلتين

Project(s):  Asphaltene deposition and formation damage in Kuwaiti oil Reservoir- SEK

Project code:  PP 040K

View document

System operation and performance evaluation procedure (solar cooling and heating)

1983

KISR Report

Interim Report No. 4

Contributor(s):  Ayyash, S.

Subject(s):  Solar cooling and heating. Solar absorption cooling.

Project(s):  System Operation and Performance Evaluation Procedure (Solar Cooling and Heating)

Project code:  SE 44

View document

Ministry of defence regional office at Mushrif

1983

KISR Report

Interim Report No. 5

Contributor(s):  Ayyash, S.

Subject(s):  Solar environmental control system. Solar system monitoring and performance evaluation.

Project(s):  Ministry of Defence Regional Office at Mushrif

Project code:  SE 44

View document