KDR

report(s) found: 10091

development of procedures for evaluating the integrity of C-o.5 Mo steel in the Refineries of Kuwait.

2005

KISR Report

Final Report

Contributor(s):  Tanaka, H.

Subject(s):  Hydrogen attack ,  Ultrasonic detection ,  Remaining life ,  Safety ,  Reliability ,  Refinery equipment ,  In-situmetallography

Project(s):  Development of Procedures for Evaluating the Integrity of C-o.5 Mo Steel in the Refineries of Kuwait

Project code:  PF 023C

View document

Potential For Recycling Steel Mill Scale In Concrete

2008

KISR Report

Technical Report

Contributor(s):  Al-Otaibi, S.

Subject(s):  Compressive Strength ,  Flexural ,  Tensile ,  Chloride Permeability

Project(s):  Potential For Recycling Steel Mill Scale In Concrete

Project code:  EU 022S

View document

Cost and safety impact of current design practices of residential buildings in Kuwait

2001

KISR Report

Final Report

Contributor(s):  Sadek, A.

Subject(s):  Reinforced concrete. ,  Structural analysis and design.

Project(s):  Cost and safety impact of current design practices of residential buildings in Kuwait

Project code:  EB 013K

View document

Availability of potential jobs, nature of mismatch and the extent of substitution possibilities of non-nationals by nationals in the private sector of Kuwait

2001

KISR Report

Final Report

Subject(s):  Labor demand. ,  Kuwait labor supply. ,  Substitutability potential.

Project(s):  Availability of potential jobs, nature of mismatch and the extent of substitution possibilities of non-nationals by nationals in the private sector of Kuwait

Project code:  TE 025C

View document

Predictive numerical modelling of sediment transport patterns along the Kuwaiti coastline

1994

KISR Report

Final Report

Contributor(s):  Lo, J. M.

Subject(s):  Numerical model. Nearshore sediments. Kuwaiti coast.

Project(s):  Predictive Numerical Modelling of Sediment Transport Patterns along the Kuwaiti Coastline

Project code:  EES 114

View document

Physical model study and hydrographic monitoring system for the Shuaiba Offshore Area, Phase III, Vol. V

1986

KISR Report

Final Report

Contributor(s):  Lo, J. M.

Subject(s):  Model construction. Data acquisition system. Temperature sensors.

Project(s):  Supplementary Oceanographic Survey of the Shuiba Offsahore Area

Project code:  EES 19

View document

Studies on the effect of mixing treated spent catalyst with boehmite in the prparation and performance of new hydrotreating catalyst.

2004

KISR Report

Technical Report No. 3

Contributor(s):  Marafi, M.

Subject(s):  Spent catalyst utilization. ,  Catalyst preparation. ,  Spent catalyst recycling. ,  Reduce hydrotreating.

Project(s):  Studies of the Effect of Mixing Treated Spent Catalyst with Boehmite in the Preparation and Performance of New Hydrotreating Catalyst

Project code:  PF 019C

View document

Development of a process for the preparation of an active hydrodemetallization catalyst from spent catalysts

2005

KISR Report

Final Report

Contributor(s):  Marafi, M.

Subject(s):  Spent catalyst recycling. ,  Spent catalyst utilization. ,  Residue hydrotreating. ,  Catalyst preparation and hydrodesulfurization catalyst.

Project(s):  Studies of the Effect of Mixing Treated Spent Catalyst with Boehmite in the Preparation and Performance of New Hydrotreating Catalyst

Project code:  PF 019C

View document

Physical model study and hydrographic monitoring system for the Shuaiba Offshore Area, Phase III, Vol. II

1986

KISR Report

Final Report

Contributor(s):  Lo, J. M.

Subject(s):  Shuaiba Industrial Area. 1:100 and 1:150 scale models. Ambient temperature.

Project(s):  Supplementary Oceanographic Survey of the Shuiba Offsahore Area

Project code:  EES 19

View document

developing quantitative planning tools

2005

KISR Report

Progress Report no. 5

Contributor(s):  Hajeeh,M

Subject(s):  computable general equilibrium ,  marco-econometric model ,  planning indicators ,  social accounting matrix ,  dialogue-based management system

Project(s):  Developing Quantitative Planning Tools

Project code:  TQ 003C

View document

Physical model study and hydrographic monitoring system for the Shuaiba Offshore Area, Phase III, Vol. III

1986

KISR Report

Final Report

Contributor(s):  Lo, J. M.

Subject(s):  Power plant outfall. Thermal dispersion. Physical model design. Terms of reference.

Project(s):  Supplementary Oceanographic Survey of the Shuiba Offsahore Area

Project code:  EES 19

View document

Usage of groundwater Isotopes to reconstruct the paleoclimate of Kuwait for water resaources management strategies

2021

KISR Report

Technical Report

Contributor(s):  Rashid, T.

Subject(s):  Groundwater flow ,  Groundwater flow ,  Groundwater recharge ,  Groundwater recharge ,  مكمن مجموعة الكويت ,  مكمن تكوين الدمام ,  المياة الجوفية ,  الغازات النبيلة ,  درجات الحرارة أثناء الشحن ,  Kuwait group aquifer ,  Dammam formation aquifer ,  groundwater ,  Nobel gases ,  Recharge temperatures

Project(s):  Usage of Groundwater Isotopes to Reconstruct the Paleolimate of Kuwait for Water Resources Management Strategies

Project code:  WM 112S

View document