KDR

report(s) found: 10000

Egeria nifaia: investigating the effect of different mixtures of plastic solid waste feedstock on pyro-products

2022

KISR Report

Proposal

Contributor(s):  Al Salem, S.

Subject(s):  Waste ,  Rubber tires ,  Fuel ,  Thermochemistry ,  Plastic waste ,  Fuel ,  Polyolefin ,  Pyro- Oil ,  النفايات البلاستيكية ,  الوقود ,  بولي أوليفين ,  زيوت من عمليات الكيمياء الحراري

Project(s):  Egeria Nifaia: Investigating the Effect of Different Mixture of Plastic Solid Waste Feedstock on Pyro-Products

Project code:  EM 114C

View document

Early detection, investigation, and characterization of SARS coronavirus 2 (Covid-19) in sewage water in Kuwait using real time RT-PCR

2022

KISR Report

Final Report

Contributor(s):  Al Alotaibi, M.

Subject(s):  Virus ,  DNA ,  SARS ,  Sewage ,  فيروس كورونا ,  الحمض النووي الريبي ,  النسخ بواسطة حلقة التضخيم متساوي الحراره ,  SARS-CoV 2 coronavirus ,  RNA ,  Real time RT-PCR

Project(s):  Early Detection, Investigation, and Characterization of SARS Coronavirus 2 (Covid-19) in Sewage Water in Kuwait using Real Time RT-PCR

Project code:  FB 156C

View document

Effects of microplastic pellets and effluent exposed pellets on fish

2022

KISR Report

Annual Progress Report No. 1

Contributor(s):  Al Jandal, Noura

Subject(s):  Waste ,  Waste water ,  Pollution ,  Fish ,  Endocrine-disruption chemical ,  intestine ,  ingestion ,  vector ,  المواد الكيميائية المسببة لاضطرابات الغدد الصماء ,  الأمعاء ,  الأبتلاع ,  الناقل

Project(s):  Effects of microplastic pellets and effluent exposed pellets on fish

Project code:  FB 146C

View document

Evaluation of a wetland system in treating wastewater at sulaibiya research plant

2022

KISR Report

Annual Progress Report

Contributor(s):  Khajah, M.

Subject(s):  Wastewater ,  Water treatment ,  Sewage ,  Research ,  نظام الأراضي الرطبة ,  الري ,  المساحات الخضراء ,  مياه الصرف الصحي ,  المعالجة ,  المكاتب ,  Constructed wetlands ,  Irrigation ,  Landscaping ,  Wastewater ,  Treatment ,  Offices

Project(s):  Evaluation of a Wetland System in Treating Wastewater at Sulaibiya Research Plant

Project code:  WT 083K

View document

Pilot study of wetland systems for treatment of reverse osmosis reject Wastewater

2022

KISR Report

Annual Progress Report

Contributor(s):  Khajah, M.

Subject(s):  Water treatment ,  Wastewater ,  Sewage ,  Brine ,  مياه الصرف الصحي المعالجة ,  محطة معالجة مياه الصرف الصحي ,  المحلول الملحي الراجع ,  معالجة الاغشية ,  توصيف مياه الصرف الصحي ,  Treated wastewater ,  Wastewater treatment plant ,  Brine ,  Membrane treatment ,  Wastewater

Project(s):  Pilot Study of Wetland Systems for Treatment of Reverse Osmosis Reject Wastewater

Project code:  WT 069C

View document

Extraction of magnesium oxide from concentrated brine :Pilot plant

2022

KISR Report

Final Report

Contributor(s):  Ahmed, Mansour

Subject(s):  Salt water ,  Magnesium oxide ,  Potassium ,  sea water ,  تحلية المياه بدون مياه عادمة ,  تحلية مياه البحر ,  البيئة ,  التخلص من محلول ملحي ,  أستخلاص الأملاح ,  Zero Liquid Discharge ,  Seawater desalination ,  Environment ,  Brine disposal ,  Salt recovery

Project(s):  Extraction of Magnesium Oxide from Concentrated Brine: Pilot plant

Project code:  WT 045C

View document

Hydro-environmental impacts of al-fao port (Iraq) on Mubarak port (Kuwait) and Khor Abdullah channels

2022

KISR Report

Progress Report no. 2

Contributor(s):  Alosairi, Y.

Subject(s):  Water ,  Island ,  Quality ,  Port ,  Boubyan island. ,  Numerical modelling. ,  Hydrodynamics. ,  Sediment transpoprt. ,  Water quality. ,  جزيرة بوبيان. ,  نمذجة رقمية. ,  هيدروديناميكية. ,  نقل الرواسب. ,  جودة المياه.

Project(s):  Hydro-environmental impacts of Al-Fao port (Iraq) on Mubarak port (Kuwait) and Khor Abdullah channels

Project code:  EC 125C

View document

Advanced Structural reliability analysis concepts for wind energy assets in Kuwait

2022

KISR Report

Final Report

Contributor(s):  Al Sanad, S.

Subject(s):  Energy ,  Wind ,  Turbine ,  Analysis ,  Wind turbine. ,  Reliability update. ,  Safety factor calibration. ,  Optimization. ,  تحديث الموثوقية. ,  معايرة عامل الأمان. ,  التحسين.

Project(s):  Advanced Structural reliability analysis concepts for wind energy assets in Kuwait

Project code:  EU 123C

View document

Development of industrial gas turbine performance simulation and gas path diagnostics platform

2022

KISR Report

Annual Progress Report no. 1

Contributor(s):  Suleiman, S. M.

Subject(s):  Gas ,  Platform ,  Performance ,  Industrial ,  Gas path analysis. ,  Gas turbine. ,  Machine learning. ,  Digital twin. ,  Diagnostics. ,  تحليل مسار الغاز. ,  التوربينات الغازية. ,  التعلم الآلي. ,  التوأم الرقمي. ,  التشخيص. ,  الزحف. ,  حياة الاجهاد. ,  تغيير الشكل.

Project(s):  Development of industrial gas turbine performance simulation and gas path diagnostics platform

Project code:  EU 127C

View document

Investigating the effect of organic plant-derived products as dietary supplement in poultry

2022

KISR Report

Progress Report no.4

Contributor(s):  Al Khalaifah, H.

Subject(s):  Environment ,  Poultry ,  Production ,  Organic ,  Layers. ,  Proximate composition. ,  Organic solution. ,  Pureganic. ,  الدجاج البياض. ,  التحليل الكيميائي. ,  محلول عضوي. ,  بيوروجيتك.

Project(s):  Investigating the effect of organic plant-derived products as dietary supplement in poultry

Project code:  FA 188C

View document

Surveillance and risk modeling of avian influenza in Kuwait

2022

KISR Report

Annual Progress Report no. 1

Contributor(s):  Al Mouqatea, S. A.

Subject(s):  Pandemic ,  Animal ,  Disease ,  Health ,  epidemiology. ,  Molecular diagnosis. ,  Spatio-temporal analysis. ,  Risk assessment. ,  Prevention. ,  علم الأوبئة. ,  التشخيص الجزيني. ,  النمذجة الرياضية. ,  ادارة المخاطر. ,  وقاية.

Project(s):  Surveillance and risk modeling of avian influenza in Kuwait

Project code:  FB 116C

View document

Establishment of the Sheem fish eleutheronema tetradactylum Aquaculture in Kuwait phase 1 :

2022

KISR Report

Annual Progress Report no. 1

Contributor(s):  Al Yaqout, Amani.

Subject(s):  Fish ,  Aquaculture ,  species ,  Culture ,  Sheem fish. ,  Commercial aquaculture. ,  Endangered species. ,  Larvae. ,  Fingerlings. ,  أسماك الشيم. ,  الأستزراع التجاري. ,  الأنواع المهددة بلأنقراض. ,  اليرقات. ,  اصبعيات.

Project(s):  Establishment of the Sheem fish eleutheronema tetradactylum Aquaculture in Kuwait phase 1 : Collection of eggs from wild brooders and larvae/juveniles rearing

Project code:  FM 122C

View document