KDR

report(s) found: 10100

District cooling system design guidelines for Al Khairan new residential city

2013

KISR Report

Technical Report

Contributor(s):  Hajiah, Ali.

Subject(s):  Energy conservation ,  Energy conservation ,  Energy Efficiency Best Practice Programme ,  Energy Efficiency Best Practice Programme ,  Energy efficiency ,  Peak power reduction ,  Chilled water system ,  Thermal energy storage ,  كفاءة الطاقة ,  خفض الحمل الكهربائي ,  نظام التبرد المائي ,  الخزانات الحرارية

Project(s):  District Cooling System Design Guidelines for Al-Khairan New Residential City

Project code:  EU 044S

View document

High performance concrete for Kuwait phase I

2008

KISR Report

Amendment/Extension 'A'

Contributor(s):  Al Otaibi, Saud.

Subject(s):  Concrete ,  Concrete ,  Concrete construction ,  Concrete construction

Project(s):  High Performance Concrete for Kuwait

Project code:  EU 045K

View document

Performance assessment of renewable energy applications in the state of Kuwait,

2010

KISR Report

Proposal

Contributor(s):  Alhajraf, S.

Subject(s):  Energy conversation ,  Renewable energy resources ,  Renewable energy, Wind farm, climate change ,  الطاقة المتجددة; مزارع الرياح; التغير المناخي

Project(s):  Performance Assessment of Renewable Energy Applications in the State of Kuwait

Project code:  EU 057C

View document

تطوير إستراتيجية لاستغلال مصادر الطاقة المتجددة لدولة الكويت

2012

KISR Report

Executive Summary

Contributor(s):  الصايغ، أسامه.

Subject(s):  الطاقة المتجددة ,  الطاقة المتجددة ,  مصادر الطاقة المتجددة.

Project(s):  Development of a Strategy for the Exploitation of Renewable Energy Resources for the State of Kuwait

Project code:  EA 038C

View document

Development of laser fluorosensor techniques for remote detection, identification and quantification of oil spills in Marine environment

1985

KISR Report

Proposal

Contributor(s):  Quinn, M. F.

Subject(s):  Characterization of oils. Luminescence of oils. Excitation and absorption spectra of oil.

Project(s):  Development of Laser Fluorosensor Techniques for Remote Detection, Identification & Quantification of Oil Spills in Marine Environment

Project code:  EL 8

View document

Planar solar collector based on light pipe trapping of molecular fluorescence for photovoltaic applications

1979

KISR Report

Proposal

Contributor(s):  Quinn, M. F.

Subject(s):  Solar collector. Photovoltaics.

Project(s):  Planar Solar Collector Based on Light Pipe Trapping of Molecular Fluorescence for Photovoltaic Applications

Project code:  EL 4

View document

Distributed instrumentation and data acquisition network for the Engineering Division

1981

KISR Report

Proposal

Contributor(s):  Mohammad, O.

Subject(s):  Centralized data base. Data acquisition. Signal conditioning. Microprocessor. Temperature sensors. Flow sensors. Data scans. Humidity sensors. Radiation sensors.

Project(s):  Distributed Instrumentation & Data Acquisition Network for the Engineering Division

Project code:  EL 6

View document

Implementation of energy and power saving scheme in the avenues mall

2008

KISR Report

Proposal

Contributor(s):  Al Hadban, Yahya.

Subject(s):  Environmental auditing ,  Environmental auditing ,  Buildings ,  Buildings ,  Energy audit ,  Commercial mall ,  تدقيق الطاقة ,  مجمع تجاري

Project(s):  Implementation of Energy & Power Saving Scheme in the Avenues Mall

Project code:  EU 051C

View document

Evaluation and assessment of concrete produced by utilizing treated wastewater

2008

KISR Report

Proposal

Contributor(s):  Al Enezi, Naser.

Subject(s):  Sewage ,  Desalination ,  Fresh water ,  Concrete ,  Batches. ,  Desalinated water. ,  Tertiary and plants. ,  خرسانة ,  مياه صرف صحي معالجة

Project(s):  Evaluation & Assessment of Concrete Produced by Utilizing Treated Wastewater

Project code:  EU 054K

View document

Demand side management of major power consumers through optimum remote-control

2008

KISR Report

Amendment/Extension 'B'

Contributor(s):  Ali Al Mula Ali, Ahmad.

Subject(s):  Radioactive ,  Radioactive ,  Sulphates ,  Sulphates ,  Groundwater ,  Groundwater ,  Acidity ,  Acidity

Project(s):  Demand Side Management of Major Power Consumers through Optimum Remote Control

Project code:  EU 050C

View document

Evaluation of the effectiveness of the implemented treatment measures in the pilot area of Al Dhahar Phase III

2007

KISR Report

Proposal

Contributor(s):  Kamal, Hasan.

Subject(s):  Treatment ,  Rocks ,  The project ,  Cement ,  Sinkhole ,  Treatment ,  Cavities ,  Grout ,  Pilot ,  Injection ,  Implement ,  Tender ,  Evaluation ,  Subsidence ,  Risk ,  حفر ,  علاج ,  فجوات ,  ملاط ,  تجريبي ,  حقن ,  تطبيق ,  طرح ,  تقييم ,  هبوط ,  خطر

Project(s):  Evaluation of the Effectiveness of the Implemented Treatment Measures in the Pilot Area of Al-Dhahar - Phase III

Project code:  EU 049C

View document

Assessment of the Electromagnetic Field Around the Electrical Secondary Transformers in Schools and Residential Area.

2013

KISR Report

Amendment/Extension 'A'

Contributor(s):  Al Bassam, Eatdal.

Subject(s):  Electricity ,  Electromagnetic fields ,  Scools ,  Residential buildings ,  Health ,  Protection ,  Health effect. ,  Guidelines. ,  Residential houses. ,  المخاطرالصحية ,  مبادئ توجيهية ,  المنازل السكنية

Project(s):  Assessment of the Electromagnetic Field around the Electrical Secondary Transformers in Residential Areas & Schools

Project code:  EU 058C

View document