KDR

report(s) found: 10100

Computer based integerated quality system (IQS) for industrial plants in Kuwait

1986

KISR Report

Amendment/Extension 'A'

Contributor(s):  Hosni, Y.

Subject(s):  Product quality. Computer-based integerated quality system (IQS).

Project(s):  Computer-Based Integrated Quality System (IQS)

Project code:  ASD 5

View document

Contribution to greenery plan; ornamental plant introduction, establishment and maintenance. Phase 1

1994

KISR Report

Proposal

Contributor(s):  Basham, C. B.

Subject(s):  Ornamental plants. Ornamental horticulture. Greenery program. Landscaping. Plant introduction. Plant propagation. Irrigation systems. Plant water requirement. Plant cultural practices.

Project(s):  Contribution to Greenery Plan: Ornamental Plant Introduction, Establishment & Maintenance, Phase I

Project code:  AG 70

View document

Computer based integerated quality system for industrial plants in Kuwait

1985

KISR Report

Interim Report No. 1

Contributor(s):  Hosni, Y. A.

Subject(s):  Quality control. Computer based. Industrial.

Project(s):  Computer-Based Integrated Quality System (IQS)

Project code:  ASD 5

View document

Computer based integerated quality system for industrial plants in Kuwait :

1985

KISR Report

Proposal

Contributor(s):  Hosni, Y. A.

Subject(s):  Quality control. Improving quality. Microcomputer.

Project(s):  Computer-Based Integrated Quality System (IQS)

Project code:  ASD 5

View document

Computer based integerated quality system for industrial plants in Kuwait :

1985

KISR Report

Pre-Proposal

Contributor(s):  Hosni, Y.

Subject(s):  Product quality. Computer-based integerated quality system (IQS).

Project(s):  Computer-Based Integrated Quality System (IQS)

Project code:  ASD 5

View document

Master plan for development of Kuwait's agricultural sector (1995-2015)

1995

KISR Report

Final Report

Contributor(s):  Food resources Division.

Subject(s):  Agricultural development master plan. Crop production. Animal production. Range resource assessment. Food demands. Farms. Projections. Priority commodities. Interventions. Cost-benefit. Marketing.

Project(s):  Development Study for the Agricultural Sector (Plant & Animal Production in Kuwait)

Project code:  AG 67

View document

Updating the Kuwaiti fire protection code

2005

KISR Report

Interim Report

Contributor(s):  Sadek, Amro.

Subject(s):  Fire prevention ,  Fire prevention ,  Standards. ,  Fire. ,  Translation. ,  Data-base. ,  مواصفات. ,  حريق. ,  ترجمة. ,  قاعدة بيانات.

Project(s):  Updating the Kuwaiti Fire Production Code

Project code:  EU 025C

View document

Failure analysis of steel tubing in the superheater boiler of an electrical power station

2000

KISR Report

Technical Report

Contributor(s):  Habib, K.

Subject(s):  Heat impingement. ,  Stress rupture. ,  Magnetite scale. ,  Spheroidized carbide particles. ,  Pearlite structure.

Project(s):  Failure Analysis of Steel Tubing in the Superheater Boiler of an Electrical Power Station

Project code:  ES 013G

View document

Demonstration Test PIT for GPR Applications

2008

KISR Report

Technical Report

Contributor(s):  Sadek, A. W.

Subject(s):  Pipe ,  Geotechnical Survey

Project(s):  Demonstration Test PIT for GPR Applications

Project code:  EU 020G

View document

Towards a better understanding of our domestic livestock :

1987

KISR Report

Technical Report

Contributor(s):  Ibnoaf, M.

Subject(s):  Camels. Herd structure. Functions. Importance of Camel production.

Project(s):  Towards a Better Understanding of Our Domestic Livestock: Camels of Kuwait

Project code:  AG GEN

View document

Seasonal variation of trace metal concentrations in the seawater and suspended particulate matter of Kuwait bay

2009

KISR Report

Technical Report

Contributor(s):  Al-Shemmari, H.

Subject(s):  Marine environment ,  Sedimentological research ,  Atomic absorption spectrometry (AAS), ANOVA, Type of season ,  جهاز الامتصاص الذري الطيفي ; تحليل التباين (ANOVA) ;نوع الموسم

Project(s):  Seasonal Variation of Trace Metal Concentrations in the Seawater & Suspended Particulate Matter of Kuwait Bay

Project code:  EM 004G

View document

Mathematical modelling and optimization in sewer design :

1987

KISR Report

Technical Report

Contributor(s):  Charalambous, C. C.

Subject(s):  Single sewers. Mathematical model. Optimization.

Project(s):  Optimization of Sewer Networks Design in Kuwait: Phase II & III

Project code:  ASD 6

View document