KDR

report(s) found: 10100

Surface seawater pretreatment by micro/ultrafiltration

1990

KISR Report

Proposal

Contributor(s):  Qamhiyah, Z.

Subject(s):  Seawater. Reverse osmosis. Pretreatment. Microfiltration. Ultrafiltration.

Project(s):  Surface Seawater Pretreatment by Micro/Ultrafiltration

Project code:  WD 003

View document

Water desalination by reverse osmosis

1989

KISR Report

Proposal

Contributor(s):  Abdel-Jawad, M.

Subject(s):  Water Desalination. Reverse osmosis.

Project(s):  Water Desalination by Reverse Osmosis

Project code:  WD 004

View document

Seawater desalination by reverse osmosis. Phase III

1990

KISR Report

Proposal

Contributor(s):  Abdel-Jawad, M.

Subject(s):  Reverse osmosis. Seawater. Single-stage. Hybrid RO/MSF. Risk. Cost. Energy recovery system.

Project(s):  Seawater Desalination by Reverse Osmosis - Phase III

Project code:  WD 005

View document

Seawater desalination by reverse osmosis:

1997

KISR Report

Proposal

Contributor(s):  Abdel-Jawad,Mahmoud.

Subject(s):  Reverse osmosis. ,  Seawater. ,  Energy recovery system.

Project(s):  Seawater Desalination by Reverse Osmosis - Phase III

Project code:  WD 005

View document

Seawater desalination by reverse osmosis, Phase III

1995

KISR Report

Proposal

Contributor(s):  Abdel-Jawad, M.

Subject(s):  Reverse osmosis. Seawater. Single-stage. Hybrid RO/MSF. Cost. Energy recovery system.

Project(s):  Seawater Desalination by Reverse Osmosis - Phase III

Project code:  WD 005c

View document

Pretreatment of seawater feed for desalination plants using nanofiltration technique

2002

KISR Report

Final Report

Contributor(s):  Al-Wazzan, Y.

Subject(s):  Softening. ,  Nanofiltration. ,  Water hardness. ,  Scale. ,  Technical and Economic feasibility. ,  Conceptual design.

Project(s):  Pretreatment of Seawater Feed for Desalination Plants Using Nanofilteration Technique

Project code:  WD 009C

View document

Study, design and construction supervision of a pilot groundwater drainage project, Phase III

1997

KISR Report

Amendment / Extension "G"

Contributor(s):  Kuwait Institute for Scientific Research.

Subject(s):  Groundwater. Drainage. Operation. Monitoring. Data. Mathematical modelling.

Project(s):  Study, Design and Construction Supervision of a Pilot Groundwater Drainage Project in Kuwait

Project code:  WH 001

View document

Multipurpose hydrogeological model for the State of Kuwait, Vol. IV, Appendix I-V

1997

KISR Report

Final Report

Contributor(s):  Szekely, F.

Subject(s):  Hydrogeology. ,  Groundwater flow. ,  Water, Underground. ,  Water, Undeground-Quality. ,  Solute transport. Cascading flow. Induced crossflow. Multi-screened wells. Dual completion wells.

Project(s):  Multipurpose Hydrogeological Model for the State of Kuwait

Project code:  WH 001C

View document

Pretreatment of seawater feed for desalination plants using nanofiltration technique

2002

KISR Report

Progress Report No.2

Contributor(s):  Al-Wazzan,Y.

Subject(s):  Softening. ,  NF. ,  Hardness. ,  Scale.

Project(s):  Pretreatment of Seawater Feed for Desalination Plants Using Nanofilteration Technique

Project code:  WD 009C

View document

Multipurpose hydrogeological model for the State of Kuwait, Vol. III, Appendix I, User's manual

1997

KISR Report

Final Report

Contributor(s):  Szekely, F.

Subject(s):  Hydrogeology. ,  Groundwater flow. ,  Water, Underground. ,  Water, Undeground-Quality. ,  Solute transport. Cascading flow. Induced crossflow. Multi-screened wells. Dual completion wells.

Project(s):  Multipurpose Hydrogeological Model for the State of Kuwait

Project code:  WH 001c

View document

Study, design and construction supervision of a groundwater piolt drainage project in Kuwait

1994

KISR Report

Amendment / Extension "C"

Contributor(s):  Mossaad, M.

Subject(s):  Subsurface water rise. water table. Drainage. Geotechnical impact.

Project(s):  Study, Design and Construction Supervision of a Pilot Groundwater Drainage Project in Kuwait

Project code:  WH 001

View document

Study, design and construction supervision of pilot drainage project in Kuwait

1993

KISR Report

Proposal

Contributor(s):  Mossaad, M.

Subject(s):  Subsurface water rise. water table. Drainage. Geotechnical impact.

Project(s):  Study, Design and Construction Supervision of a Pilot Groundwater Drainage Project

Project code:  WH 001

View document