KDR

report(s) found: 638
Center: Engineering Division x

Ministry of defence regional office at Mushrif

1983

KISR Report

Interim Report No. 5

Contributor(s):  Ayyash, S.

Subject(s):  Solar environmental control system. Solar system monitoring and performance evaluation.

Project(s):  Ministry of Defence Regional Office at Mushrif

Project code:  SE 44

View document

Performance results of solar absorption cooling installation

1984

KISR Report

Technical Report

Contributor(s):  Ayyash, S.

Subject(s):  Solar absorption cooling. Solar cooling.

Project(s):  Performance Results of Solar Absorption Cooling Installation

Project code:  SE 44

View document

Radiation calibration laboratory

1983

KISR Report

Proposal

Contributor(s):  Sayigh, A.

Subject(s):  Calibration. Solar radiation.

Project(s):  Radiation Calibration Laboratory

Project code:  SE 45

View document

تقييم أداء أجراءات الحفاظ على الطاقة في مباني الهيئة العامة للاسكان

1982

KISR Report

Final Report

Subject(s):  استخدام الطاقة

Project(s):  قييم أداء أجراءات الحفاظ على الطاقة في مباني الهيئة العامة للاسكان

Project code:  ENG-GEN

View document

The introduction of personal computers to Kuwait secondary schools in Kuwait

1984

KISR Report

Proposal

Contributor(s):  Bishara, A.

Subject(s):  Personal computers. Input/output. Programming. Development of programs. Program language BASIC.

Project(s):  The Introduction of Personal Computers to Kuwait Secondary Schools in Kuwait

Project code:  SPP 5

View document

Contract for pilot production of line of cat-100

1982

KISR Report

Final Report

Contributor(s):  Alyassini, N.

Subject(s):  Complete Arabic telex. Pilot production.

Project(s):  Contract for Pilot Production of Line of Cat-100

Project code:  TE 5 KISR

View document

Power plants energy auditing

1993

KISR Report

Final Report

Contributor(s):  Al-Ramadhan, M. A.

Subject(s):  Performance evaluation. Heat rate. On-line monitoring system. Water production. Auxiliary energy consumption.

Project(s):  Power Plants Energy Auditing

Project code:  URBAN 3

View document

Weathering and oil pollution of Building facades

1992

KISR Report

Final Report

Contributor(s):  Al-Mudhaf, H.

Subject(s):  Building. Cladding. Building materials. Deterioration. Cleaning.

Project(s):  Weathering and Oil Pollution of Building Facades

Project code:  URBAN 2

View document

Power plants energy auditing

1991

KISR Report

Proposal

Contributor(s):  Al-Ramadhan, M. A.

Subject(s):  Energy auditing. Thermal performance.

Project(s):  Power Plants Energy Auditing

Project code:  URBAN 3

View document

Feasibility study of the electrical network interconnection of Mashreq Arab Countries

1987

KISR Report

Proposal

Contributor(s):  Engineering Division.

Subject(s):  Power systems interconnection. Arab Countries. Gulf Cooperation Council Countries. Power System planning. Power system analysis.

Project(s):  Feasibility Study of the Electrical Network Interconnection of Mashreq Arab Countries

Project code:  RFP 61

View document

Electric power interconnection study /

1983

KISR Report

Draft Proposal

Contributor(s):  Debs, A. S.

Subject(s):  Power system. Jordan. Interconnections power system.

Project(s):  Electric Power Interconnection Study

Project code:  RFP 61

View document

Integrated system digital network (ISDN) study for Kuwait

1989

KISR Report

Final Report

Contributor(s):  Akhtar, H.

Subject(s):  Telecommunication. Computer neetworks.

Project(s):  ISDN Study for Kuwait

Project code:  EL 20

View document