Organization and management of solid waste reuse, treatment and disposal in the Enlarged Shuaiba Industrial Area

1984

KISR Report

Interim Report X.

Contributor(s):  ElNawawy, A. S.

Subject(s):  Organization and management. Monitoring. Waste treatment facilities. Contractor. EPC/SAA.

Project(s):  Organization and Management of Solid Waste Reuse, Treatment and Disposal in the Enlarged Shuaiba Industrial Area.

Project code:  SPP 4

View document

Analysis of samples of current field failures. Task F4

1982

KISR Report

Interim Report No. 21.

Contributor(s):  Al-Deeb, A. M.

Subject(s):  Asbestos/cement pipes. Pipe failure. Field investigation.

Project(s):  Analysis of Samples of Current Field Failures. Task F4

Project code:  SPP 1

View document

Leaching corrosion of asbestos-cement pipes

1983

KISR Report

Interim Report No. 34.

Contributor(s):  Al-Deeb, A. M.

Subject(s):  Leaching corrosion. Free lime. Asbestos/cement.

Project(s):  Leaching Corrosion of Asbestos-Cement Pipes

Project code:  SPP 1

View document

Reliability, availability and risk assessment for reverse osmosis

1999

KISR Report

Final Report

Contributor(s):  Chaudhuri, D.

Subject(s):  Failure. ,  Hollow-fiber trains. ,  Spiral-wound trains.

Project(s):  Reliability, Availability and Risk Assessment for Reverse Osmosis

Project code:  TD 001K

View document

Development and Improvement of Asbestos-Cement Pipe Performance in Kuwait

1983

KISR Report

Interim Report No. 29.

Contributor(s):  Lalwani, S.

Subject(s):  Asbestos fibers.

Project(s):  Development and Improvement of Asbestos-Cement Pipe Performance in Kuwait

Project code:  SPP 1

View document

Density and wetness expansion of ASB/CEM pipes

1983

KISR Report

Interim Report No. 38.

Contributor(s):  Matti, M.

Subject(s):  Coefficient of expansion. Density; Asbestos/cement pipes.

Project(s):  Density and Wetness Expansion of ASB/CEM Pipes

Project code:  SPP 1

View document

Composite mix design in the production of asbestos/cement pipes

1983

KISR Report

Interim Report No. 30.

Contributor(s):  Elimam, A. A.

Subject(s):  Mix optimization-linear programming. Separable programming.

Project(s):  Composite Mix Design in the Production of Asbestos/Cement Pipes

Project code:  SPP 1

View document

Development and Improvement of Asbestos-Cement Pipe Performance in Kuwait

1983

KISR Report

Interim Report No. 35.

Contributor(s):  Al-Deeb, A. M.

Subject(s):  Design curve. Asbestos/cement water pressure pipes.

Project(s):  Development and Improvement of Asbestos-Cement Pipe Performance in Kuwait

Project code:  SPP 1

View document

Production planning and control system

1983

KISR Report

Interim Report No. 32.

Contributor(s):  Elmaghraby, S. E.

Subject(s):  Production planning. Asbestos/cement pipe production.

Project(s):  Development and Improvement of Asbestos-Cement Pipe Performance in Kuwait

Project code:  SPP 1

View document

Development of an energy economics decision support system

1990

KISR Report

Proposal

Contributor(s):  Al-Shatti, A. M.

Subject(s):  Energy economy. Modeling. Decision support system.

Project(s):  Development of an Energy Economics Decision Support System

Project code:  RFP 262

View document

Effect of water table on ASB-CEM pipe performance

1983

KISR Report

Interim Report No. 37.

Contributor(s):  Matti, M.

Subject(s):  Abestos/cement. Subsurface water table. Sulphates.

Project(s):  Effect of Water Table on ASB-CEM Pipe Performance

Project code:  SPP 1

View document

A prefeasibility study on the use of reclaimed tire rubber for road construction in Kuwait

1982

KISR Report

Technical Report

Contributor(s):  Girgis, M.

Subject(s):  Reclaimed rubber. Rubberized roads. Cost of rubberized roads.

Project(s):  A Prefeasibility Study on the use of Reclaimed tire Rubber for Road Construction in Kuwait

Project code:  PET 11 KISR