KDR

report(s) found: 689
Center: Techno-Economics Division x

Interactive power system analysis (IPTP)

1984

KISR Report

Manual

Contributor(s):  Al-Hafi, N.

Subject(s):  Interactive computerized transmission planning package (IPTP).

Project(s):  Interactive Computer Package for Transmission Line Design & Planning

Project code:  Eng 13

View document

Interactive power system analysis (IPSA)

1982

KISR Report

Manual

Contributor(s):  Akroka, J.

Subject(s):  Interactive computerized transmission planning package (IPTP).

Project(s):  Interactive Computer Package for Power System Analysis

Project code:  ENG 1

View document

Market assessment of photovoltaics

1984

KISR Report

Interim Report No. 6

Contributor(s):  Mesak, H. I.

Subject(s):  Marketing. Photovoltaics. Modelling.

Project(s):  Photovoltaic Assessment Study

Project code:  ENG 22

View document

Engineering and economic analysis of industrial robot installation

1988

KISR Report

Technical Report

Contributor(s):  Al-Ammar, J.

Subject(s):  Robotic systems. Technical analysis.

Project(s):  Engineering & Economic Analysis of Industrial Robot Installation

Project code:  ASD GEN

View document

An analytical study of student characteristics and college performance at Kuwait University

1989

KISR Report

Technical Report

Contributor(s):  Al-Thabia, R. A.

Subject(s):  Sex. Nationality. Secondary school. Field.

Project(s):  Student Placement Model at Kuwait University

Project code:  ASD GEN

View document

KISR inventory management

1985

KISR Report

Final Report

Contributor(s):  Hosni, Y.

Subject(s):  Inventory system. Inventory management.

Project(s):  KISR Inventory Management

Project code:  ASD GEN

View document

Incentives and productivity enhancement measures in the NIC cement product plants

1984

KISR Report

Proposal

Contributor(s):  Taha, H. A.

Subject(s):  Productivity. Incentives. Motion and time studies. Production measurements.

Project(s):  Incentives & Productivity Enhancement Measure in the NIC Cement Products Plants

Project code:  ASD 4

View document

Incentives and productivity enhancement measures in the NIC cement product plants

1984

KISR Report

Proposal

Contributor(s):  Taha, H. A.

Subject(s):  Productivity. Incentives. Motion and time studies. Production measurements.

Project(s):  Incentives & Productivity Enhancement Measure in the NIC Cement Products Plants

Project code:  ASD 4

View document

A Knowledge-based system for quality control, Phase 1, Design and development of a prototype

1988

KISR Report

Proposal

Contributor(s):  Masud, A. S. M.

Subject(s):  Knowledge-based system. Integrated quality control system.

Project(s):  A Knowledge-Based System for Quality Control

Project code:  ASD 20

View document

A statistical approach to evaluate KISR proposals

1988

KISR Report

Proposal

Contributor(s):  Al-Thabia, R.

Subject(s):  Decision making. Statistical model.

Project(s):  A Statistical Approach to Evaluate KISR Proposals

Project code:  ASD 19

View document

Ready mix concrete plant operations, diagnosis and productivity enhancement measures

1987

KISR Report

Technical Report

Contributor(s):  Elimam, A. A.

Subject(s):  Ready mix concrete. Shipments. Incentives. Standards.

Project(s):  Incentives & Productivity Enhancement Measure in the NIC Cement Products Plants

Project code:  ASD 4

View document

Maintenance in the cement product plants of NIC

1987

KISR Report

Technical Report

Contributor(s):  Abu-Hijleh, E.

Subject(s):  Preventive maintenance.

Project(s):  Incentives & Productivity Enhancement Measure in the NIC Cement Products Plants

Project code:  ASD 4

View document