عدد النتائج: 10000

Optimization test for the recommended modifications for the Shuaiba intake-outlet system

1986

KISR Report

Proposal

المساهمون:  Al-Madani, N.

الموضوعات:  Design details. Backwater effects. Erosion and deposition. Temperature increases. Cost-benefit analysis.

المشروعات:  Optimization Test for the Recommended Modifications for the Shuaiba Intake-Outlet System

رمز المشروع:  EES 79

عرض الملف

Modelling circulation for coastal regions with large tidal flats

1987

KISR Report

Final Report

المساهمون:  Gopalakrishnan, T. C.

الموضوعات:  Numerical circulation model. Finite element method. Moving boundary domain.

المشروعات:  Modelling Circulation for Coastal Regions with Large Tidal Flats

رمز المشروع:  EES 92

عرض الملف

Environmental assessment of industrial and Warfare chemical hazards

1988

KISR Report

Final Report

المساهمون:  Al-Harmi, L.

الموضوعات:  Hazardous gases. Toxicity. Flammability. Accidental releases. Mathematical modelling. Meteorology. FEM3 and SLAB models.

المشروعات:  Environmental Assessment of Industrial & Warfare Chemical Hazards

رمز المشروع:  EES 96

عرض الملف

Petroleum compounds in the marine environment of Kuwait

1989

KISR Report

Proposal

المساهمون:  Literathy, P.

الموضوعات:  Oil pollution. Analytical methodology. Alkanes. Polycyclic aromatic hydrocarbons. Sulfur-containing petroleum compounds. Marine ecosystems. Marine sediments. Desalinated water. Commercial fishes.

المشروعات:  Petroleum Compound in the Marine Environmental of Kuwait

رمز المشروع:  EES 100

عرض الملف

Study of control measures of mobile barchan dunes at the new 6th and 35th brigade camps

1987

KISR Report

Proposal

المساهمون:  Abdullah, J.

الموضوعات:  Mobil sand encroachment. Barchan dunes.

المشروعات:  Study of Control Measures of Mobile Barchan Dunes at the new 6th and 35th Brigade Camps

رمز المشروع:  EES 98

عرض الملف

Air pollution dispersion and prediction model for Shuaiba Industrial Area, Phase ll

1987

KISR Report

Interim Report No. 1

المساهمون:  Al-Ajmi, D.

الموضوعات:  Performance of ISCLT model. Shuaiba Industrial Area.

المشروعات:  Air Pollution Dispersion & Prediction Model for Shuaiba Industrial Area

رمز المشروع:  EES 84

عرض الملف

Air pollution dispersion and prediction model for Shuaiba Industrial Area, Phase ll

1987

KISR Report

Interim Report No. 2

المساهمون:  Al-Ajmi, D.

الموضوعات:  Meteorological. Emission.

المشروعات:  Air Pollution Dispersion & Prediction Model for Shuaiba Industrial Area

رمز المشروع:  EES 84

عرض الملف

Air pollution dispersion and prediction model for Shuaiba Industrial Area, Phase ll

1986

KISR Report

Proposal

المساهمون:  Al-Ajmi, D.

الموضوعات:  Evaluation and compare. Air pollution. Emission source measurements.

المشروعات:  Air Pollution Dispersion & Prediction Model for Shuaiba Industrial Area

رمز المشروع:  EES 84

عرض الملف

Study of control measures of mobile barchan dunes in the Umm Al-Eish and west Jahra Areas

1988

KISR Report

Final Report

المساهمون:  Abdullah, J.

الموضوعات:  Mobile sand encroachment. Migrating barchan dunes. Mathematical modelling.

المشروعات:  Study of Control Measures of Mobile Barchan Dunes at the new 6th and 35th Brigade Camps

رمز المشروع:  EES 98

عرض الملف

Potential property damage by the release of H2S gas from sewage system

1987

KISR Report

Proposal

المساهمون:  Environmental and Earth Sciences Division.

الموضوعات:  Sewage system. Sulpher corrosion. Odor problem.

المشروعات:  Potential Property Damage by the Release of H2S Gas from Sewage System

رمز المشروع:  EES 99

عرض الملف

Research support project, R. V. abhath

1981

KISR Report

Final Report

المساهمون:  Anderlini, V. C.

الموضوعات:  R. V. abhath. Research support. Research vessels.

المشروعات:  Marine Sedimentology and Benthic Ecology of Kuwait Marine Environment

رمز المشروع:  EES 31E KISR

عرض الملف

Assessment of the socioeconomic implication of the proposed aluminum smelter project

1997

KISR Report

Technical Report

الموضوعات:  Aluminum smelter. ,  Aluminum downstream industries. ,  Trade balance.

المشروعات:  Assessment of the Socioeconomic Implication of the Proposed Aluminum Smelter Project

رمز المشروع:  TE 009S

عرض الملف