عدد النتائج: 10100

Optimization of water consumption in cooling towers

2000

KISR Report

Proposal

المساهمون:  Maheshwari, G. P.

الموضوعات:  Cooling tower. ,  Water conservation.

المشروعات:  Optimization of Water Consumption in Cooling Towers

رمز المشروع:  EE 008K

عرض الملف

Feasibility study of sanitary waste treatment system for the enlarged Shuaiba Industrial Area (ESIA)

1982

KISR Report

Monthly Progress Report No. 2

المساهمون:  El-Baroudi, H.

الموضوعات:  Wastewater collection systems. Sanitary wastes. Wastewater treatment. Separate treatment. Combined treatment. Wastewater management program.

المشروعات:  Feasibility Study of Sanitary Waste Treatment System for (ESIA)

رمز المشروع:  SPP 3

عرض الملف

Feasibility study of sanitary waste treatment system for the enlarged Shuaiba Industrial Area (ESIA)

1982

KISR Report

Monthly Progress Report No. 3

المساهمون:  El-Baroudi, H.

الموضوعات:  Wastewater collection systems. Sanitary wastes. Wastewater treatment. Separate treatment. Combined treatment. Wastewater management program.

المشروعات:  Feasibility Study of Sanitary Waste Treatment System for (ESIA)

رمز المشروع:  SPP 3

عرض الملف

National geodetic net for the State of Kuwait, Vol. IV, Part III, Distances measurements and reduction to the international spheroid

1979

KISR Report

Final Report

المساهمون:  Ozone, M. I.

الموضوعات:  National geodetic net. distances measurements. Field measurements.

المشروعات:  National Geodetic Net for the State of Kuwait

رمز المشروع:  EES 5

عرض الملف

Assessment of wind energy for Kuwait

1985

KISR Report

Final Report

المساهمون:  Ayyash, S.

الموضوعات:  Wind energy resources of Kuwait. Wind energy conversion systems.

المشروعات:  Assessment of Wind Energy for Kuwait

رمز المشروع:  SE 48

عرض الملف

Feasibility study on solar energy

1979

KISR Report

Final Report

المساهمون:  Malik, M. A.

الموضوعات:  Solar energy. Solar heating and cooling. Solar thermal. Integrated food/water/power complex.

المشروعات:  Feasibility Study on Solar Energy

رمز المشروع:  SE 18 KISR/

عرض الملف

The effects of copper, lead and mercury on blood constituents of liza macrolepis (Smith)

1978

KISR Report

Technical Report

المساهمون:  Helmy, M. M.

الموضوعات:  Copper. Lead. Mercury. Blood measurments. Liza mazrolepis.

المشروعات:  The Effects of Copper, Lead & Mercury on Blood Constituents of Liza Macrolepis (Smith)

رمز المشروع:  EES 00 KISR

عرض الملف

Statistical aspects of wind speed in Kuwait

1984

KISR Report

Interim Report No. 3

المساهمون:  Ayyash, S.

الموضوعات:  Wind speed. Autocorrelation of. Spatial correlation of. Lulls.

المشروعات:  Statistical Aspects of Wind Speed in Kuwait

رمز المشروع:  SE 48

عرض الملف

Well logs evaluation study for the fields of Burgan, Magwa, Ahmadi, Raudhatain, Sabriya, Bahra, Umm Gudair, Minagish, Medina, and Mutriba

1978

KISR Report

Technical Report

المساهمون:  Kuwait Institute for Scientific Research.

الموضوعات:  Well log evaluation. Oil fields. Well log analysis. Well log digitization.

المشروعات:  Well Logs Evaluation Study for the Fields of Burgan, Magwa, Ahmadi, Raudhatain, Sabriya, Bahra, Umm Gudair, Minagish, Medina, & Mutriba

رمز المشروع:  EES 00

عرض الملف

Production cycle analysis Mina Abdullah plant

1982

KISR Report

Interim Report No. 8

المساهمون:  Alimam, A. A.

الموضوعات:  Production cycle. Quality control. Diagnosis.

المشروعات:  Development and Improvement of Asbestos-Cement Pipe Performance in Kuwait

رمز المشروع:  SPP 1

عرض الملف

Demonstration solar houses

1979

KISR Report

Proposal

المساهمون:  Puri, V. M.

الموضوعات:  Solar houses. Solar cooling. Absorption cooling. Line concentrator. Collector. Solar system performance. Vacuum tubes.

المشروعات:  Demonstration Solar Houses

رمز المشروع:  SE 6

عرض الملف

Energy auditing of KISR's main building :

KISR Report

Technical Report

المساهمون:  Meerza, A.

الموضوعات:  Energy conservation opportunities.

المشروعات:  Development & Implementation of Energy Efficient Operation & Maintenance Strategies for Air-Conditioning Systems

رمز المشروع:  EE 009K

عرض الملف