عدد النتائج: 10091

Assessment of the water rise problem at Al Qurain residential area

2011

KISR Report

Progress Report No. 3

المساهمون:  Hadi, Khaled.

الموضوعات:  Groundwater ,  Groundwater ,  Hydrogeology ,  Hydrogeology ,  Water well drilling ,  Water well drilling

المشروعات:  Assessment of the Water Rise Problem at Al Qurain Residential Area

رمز المشروع:  WM 028C

عرض الملف

Assessment of volatile organic compounds removal in wastewater treatment plants

2020

KISR Report

Annual Progress Report No. 2

المساهمون:  Al Matouq, A.

الموضوعات:  Water ,  Water ,  Seawage ,  Seawage ,  Kabd wastewater treatment plant ,  Benzene ,  Cancer ,  Emissions ,  health risk ,  محطة كبد لمعالجة مياه الصرف ,  السرطان ,  الانبعاثات ,  المخاطر الصحية

المشروعات:  Assessment of volatile organic compounds removal in wastewater treatment plants

رمز المشروع:  Wt 074K

عرض الملف

Pilot Scale Feasibility study of the recovery of water from unsaturated zone in Kuwait

2021

KISR Report

Proposal

المساهمون:  Mukhopadhyay, Amitabha

الموضوعات:  Water security ,  Water security ,  Climatic change ,  Climatic change ,  مياة غير تقليدية ,  الأمن المائي ,  الزراعة المستدامة ,  الزراعة الجافة ,  unconventional water ,  Water security ,  Sustainable agriculture ,  Arid agriculture

المشروعات:  Pilot Scale Feasibility study of the recovery of water from unsaturated zone in Kuwait

رمز المشروع:  WM 071C

عرض الملف

Direct Upgrading Process Study for Kuwait Crude Oils (Phase II): Scale-Up Assessmet

2008

KISR Report

Final Report

المساهمون:  Marafi, A.

الموضوعات:  Kuwait heavy crude ,  Hydroprocessing of heavy crude ,  Desulfurization ,  Chemical process ,  Asphaltenes

المشروعات:  Direct Upgrading Process Study for Kuwait Crude Oils

رمز المشروع:  PF 030C

عرض الملف

Water Quality Assessment of Kuwait Beaches near sewage outfalls

2021

KISR Report

Proposal

المساهمون:  Bushaibah, O.

الموضوعات:  Fresh water ,  Fresh water ,  Water quality ,  Water quality ,  Environmental pollution ,  Heavy metals ,  microbial ,  Nutrients ,  Pharmaceuticals ,  Public health ,  بيئي ,  معادن ميكروبية ,  المغذيات ,  الأدوية ,  الصحة العامة

المشروعات:  Water Quality Assessment of Kuwait Beaches near sewage outfalls

رمز المشروع:  WT 085K

عرض الملف

Economic potential for commercializing KISR stabilizer in Kuwait and The GCC Countries

1989

KISR Report

Technical Report

المساهمون:  Taha, M.

الموضوعات:  Soil stabilizer. Capital investment cost. Production cost. Cost-effective. Comparative advantage.

المشروعات:  Economic Potential for Commercializing KISR Stabilizer in Kuwait and the GCC Countries

رمز المشروع:  PRO 22

عرض الملف

Rubberized Asphalt pilot road

2021

KISR Report

Amendment "A"

المساهمون:  Zoorob, S.

الموضوعات:  Asphalt ,  Asphalt ,  Roads ,  Roads

المشروعات:  Rubberized Asphalt pilot road

رمز المشروع:  EU 108C

عرض الملف

Condensation reactions of urea with aldehydes (controlled-release nitrogen fertilizers)

1983

KISR Report

Technical Report

المساهمون:  Shuhaibar, K. F.

الموضوعات:  Hydrolysis rate. Controlled-release nitrogen compound. Condensation reactions.

المشروعات:  Condensation Reactions of Urea with Aldehydes (Controlled-Release Nitrogen Fertilizers)

رمز المشروع:  PRO GEN

عرض الملف

Evaluation of chemicals affecting asb/cem pipes using sem and x-ray diffraction. Task F5

1982

KISR Report

Interim Report No. 23.

المساهمون:  Al-Deeb, A. M.

الموضوعات:  Morphological study of asbestos/cement failed pipes.

المشروعات:  Evaluation of Chemicals Affecting asb/cem Pipes Using Sem and X-ray Diffraction (Task F5)

رمز المشروع:  SPP 1

عرض الملف

Assessment of the Performance of the electric vehicle under extreme climate conditions and development of a framework for Kuwait city to be "Ev-Ready"

2020

KISR Report

Annual Progress Report No.1

المساهمون:  Hamwi, H.

الموضوعات:  Electric vehicles ,  Electric vehicles ,  Urban transportation ,  Urban transportation ,  Electric vehicle

المشروعات:  Assessment of the Performance of the Electric Vehicle Under Extreme Climate Conditions and Development of a Framework for Kuwait City to be "Ev-Ready"

رمز المشروع:  EA 084C

عرض الملف

Asphaltene deposition and induced formation damage studies for Kuwaiti (W.K and sek) reservoirs

2006

KISR Report

Proposal

المساهمون:  Oskui, R.P.

الموضوعات:  PVT analysis. ,  Marrat field. ,  Asphaltene measurement. ,  Phase Behavior. ,  Reservoir fluids. ,  compositional analysis.

المشروعات:  Asphaltene deposition and Induced Formation Damage Studies For Kuwaiti (W.K and SEK) Reserviors

رمز المشروع:  PP 031C

عرض الملف

Feasibility study for the Economic and reliability enhancement of the electric power system through co-optimization of energy and water desalination resources

2021

KISR Report

Final Report

المساهمون:  Al Abdullah, Yousef

الموضوعات:  Energy ,  Water desalination ,  Electricity ,  Water Quality ,  عمليات أنظمة الطاقة ,  إقتصاديات أنظمة الطاقة ,  موثوقية أنظمة الطاقة ,  تحسينات ,  Energy forecasting ,  Energy economics ,  power system operations ,  Power system planning ,  Water Desalination

المشروعات:  Feasibility Study for the Economic & Reliability Enhancement of the Electric Power System through Co-Optimization of Energy & Water Desalination Resources

رمز المشروع:  EA 075C

عرض الملف