عدد النتائج: 10100

Physical model study and hydrographic monitoring system for the Shuaiba Offshore Area. Phase III

1981

KISR Report

Proposal

المساهمون:  Harms, V.

الموضوعات:  Hydraulic model. Model basin. Recirculation problem and circulation system. Shuaiba Area Authority.

المشروعات:  Supplementary Oceanographic Survey of the Shuiba Offsahore Area

رمز المشروع:  EES 19

عرض الملف

Economic feasibility study of establishing a new car driving training system in Kuwait

1986

KISR Report

Proposal

المساهمون:  Abdel-Halim, M. M.

الموضوعات:  Driving licence. Updating. Cost. Profitability.

المشروعات:  Economic Feasibility Study of Establishing a New Car Driving Training System in Kuwait

رمز المشروع:  ED 12

عرض الملف

On population / labor profiles and their implications :

1989

KISR Report

Technical Report

المساهمون:  Al-Qudsi, S. S.

الموضوعات:  Manpower. Development strategy. Population / labor profiles. Females.

المشروعات:  Kuwait Economic Study

رمز المشروع:  ED 15

عرض الملف

Industrial incentives in the GCC

1989

KISR Report

Amendment/Extension 'A'

المساهمون:  Girgis, M.

الموضوعات:  Industrial. Incentives. Subsidies. GCC. GCC regional trade.

المشروعات:  Industrial Incentives in the GCC

رمز المشروع:  ED 13

عرض الملف

Economics data banks (EDB)

1987

KISR Report

Amendment/Extension 'A'

المساهمون:  Salih, S. A.

الموضوعات:  Data base. Time series and cross-section data. Updating the series. Basic indicators. Charts and summary statistics.

المشروعات:  Economics Data Banks (EDB)

رمز المشروع:  ED 14

عرض الملف

Development and implementation of energy efficient operation and maintenance strategies for air-conditioning systems

2001

KISR Report

Interim Report

المساهمون:  Maheshwari, G. P.

الموضوعات:  Air-conditioning systems. ,  Energy.

المشروعات:  Development & Implementation of Energy Efficient Operation & Maintenance Strategies for Air-Conditioning Systems

رمز المشروع:  EE 009K

عرض الملف

Electrical capacity of air-conditioning equipment for modern office buildings

1999

KISR Report

Technical Report

المساهمون:  Juma, H.

الموضوعات:  Building thermal performance. ,  Cooling capacity.

المشروعات:  Electrical Capacity of Air-Conditioning Equipment for Modern Office Buildings

رمز المشروع:  EE 012G

عرض الملف

Hydrographic monitoring system for Shuaiba Area Authority for the period May 1980 to June 1980

1980

KISR Report

Progress Report No. 11

المساهمون:  Kadib, A. L.

الموضوعات:  Hydraulic monitoring system. Temperature profiles. Mapping of temperature.

المشروعات:  Bathymetric Survey of the Shuiba Area Authority

رمز المشروع:  EES 4

عرض الملف

Physical model study and hydrographic monitoring system for the Shuaiba Offshore Area. Phase III

1983

KISR Report

Proposal

المساهمون:  Hilaly, N.

الموضوعات:  Hydraulic model. Model basin. Recirculation problem and circulation system.

المشروعات:  Supplementary Oceanographic Survey of the Shuiba Offsahore Area

رمز المشروع:  EES 19

عرض الملف

Hydrographic monitoring systems for Shuaiba Area Authority

1980

KISR Report

Technical Report No. 12

المساهمون:  Kadib, L.

الموضوعات:  Hydrographic monitoring system. Shuaiba Area Authority.

المشروعات:  Bathymetric Survey of the Shuiba Area Authority

رمز المشروع:  EES 4

عرض الملف

Cost benefit assessment of energy conservation code

2002

KISR Report

Technical Report

المساهمون:  Meerza, A.

الموضوعات:  Cost benefit analysis.

المشروعات:  Cost Benefit Assessment of Energy Conservation Code

رمز المشروع:  EE 018G

عرض الملف

Geological mapping, exploration, and evaluation of natural resources of Kuwait

1978

KISR Report

Pre-Proposal

المساهمون:  Youash, Y. Y.

الموضوعات:  Geological mapping. Natural raw materials. Ground water. Soil. Agricultural utilization.

المشروعات:  Geological Mapping, Exploration, & Evaluation of Natural Resources of Kuwait

رمز المشروع:  EES 15

عرض الملف