عدد النتائج: 10000

Failure analysis and site inspection of the air-conditioning / central heating system of the Messilah Beach Hotel

1982

KISR Report

Technical Report

المساهمون:  Islam, M.

الموضوعات:  Failure analysis. Air-Conditioning / Central heating system.

المشروعات:  Failure Analysis and Site Inspection of the Air-Conditioning/ Central Heating System of the Messilah Beach Hotel

رمز المشروع:  RFS 32

عرض الملف

Assessment of coastal process and morphology of Failaka Island for future development. Volume l

1994

KISR Report

Final Report

المساهمون:  Al-Sarawi, M. A.

الموضوعات:  Coastal zone. Aerial photographs. Field measurements. Beach profiles. Currents. Waves. Sediments. Numerical modelling. Morphology.

المشروعات:  Assessment of Coastal Processes & Morphology of Failaka Island for Future Development

رمز المشروع:  EES 117

عرض الملف

Underground corrosion of a coated pipeline

1984

KISR Report

Final Report

المساهمون:  Carew, John.

الموضوعات:  Soil corrosion. Cathodic protection. Underground pipeine. Defective coating.

المشروعات:  Underground Corrosion of a Coated Pipeline

رمز المشروع:  RFS 83

عرض الملف

Hydrotreating of kerosene

2008

KISR Report

Technical Report

المساهمون:  Al Dalama, Khalidah.

الموضوعات:  Kerosene ,  Sulfur ,  Chemical products ,  Catalysts ,  Hydrotreating catalyst. ,  Kerosene. ,  Effect of operation conditions on kerosene. ,  مواد حفازة للمعالجة الهيدروجينية ,  كيروسين ,  تأثير ظروف التشغيل علي الكيروسين

المشروعات:  Hydrotreating of Kerosene

رمز المشروع:  PF 017S

عرض الملف

Makaton choice board APP.

2015

KISR Report

Final Report

المساهمون:  Al Qallaf, Ali.

الموضوعات:  Software ,  sign language ,  Communication Disorders ,  Autism ,  Project ,  Symbols. ,  Sign language. ,  Ipad application. ,  Autism. ,  Communication disorders. ,  رموز ,  لغة الأشارة ,  برنامج اي باد ,  ذوي التوحد ,  اضطرابات التواصل

المشروعات:  Makaton Choice Board APP

رمز المشروع:  SD 001C.

عرض الملف

Updating of the military topographic maps

2018

KISR Report

Technical Report

المساهمون:  El Gamily, Hamdy.

الموضوعات:  Geographic ,  Network ,  Photogrammetry. ,  Generalization. ,  Geographic information system. ,  Geodetic network.

المشروعات:  Updating of the Military Topographic Maps

رمز المشروع:  SD 001S

عرض الملف

Compositional analysis of asphaltenes separated from residues.

2004

KISR Report

Technical Report

المساهمون:  Ali, F.A.

الموضوعات:  Asphaltenes. ,  Residues. ,  NMR and XRD.

المشروعات:  Compositional Analysis of Residue from Kuwait Crude Oils

رمز المشروع:  PF 018C

عرض الملف

Survey and mapping of surface features in Kuwait using new satellite data

1987

KISR Report

Proposal

المساهمون:  Asem, A.

الموضوعات:  Remote sensing. Satellite. Geological mapping. Geomorphology.

المشروعات:  Survey & Mapping of Surface Features in Kuwait using New Satellite Data

رمز المشروع:  EES 87

عرض الملف

The arabic number race.

2014

KISR Report

Technical Report

المساهمون:  Al Qallaf, Ali.

الموضوعات:  Children ,  Learning ,  Numbers ,  Calculators ,  Childrens books ,  Learning disability. ,  Dyscalculia. ,  Arabic support. ,  Mathematical game. ,  Children. ,  صعوبات التعلم ,  خلل الحساب ,  دعم العربية ,  لعبة حسابية ,  اطفال

المشروعات:  The Arabic Number Race

رمز المشروع:  SD 001G

عرض الملف

Proyecto para introduccion de tecnicas de marcado para camarones-terminal statement

1983

KISR Report

Final Report

المساهمون:  Mathews, C. P.

الموضوعات:  Shrimp stock assessment. Effort. Recruitment. Closed seasons.

المشروعات:  Proyecto Para Introduccion de Tecnicas de Marcado Para Camarones-Terminal Statement

رمز المشروع:  RFS 43

عرض الملف

Behavior and fate of oil in the marine environment :

1988

KISR Report

Proposal

المساهمون:  Literathy, P.

الموضوعات:  Oil pollution. Marine environment. Physical processes. Biodegradation. Bio-transformation. Chemical oxidation. Photo-oxidation.

المشروعات:  Behavior & Fate of Oil in the Marine Environment: Physical, Biological & Chemical Processes (State-of-the-Art)

رمز المشروع:  EES 122

عرض الملف

Design and installation of 1 kwp photovoltaic system for radiotelephone system

1989

KISR Report

Final Report

المساهمون:  Al-Busairi, H.

الموضوعات:  Remote sites powered by PV. PV-powered communications. Radiotelephone.

المشروعات:  Design and Installation of 1 kW Photovoltaic System for Radiotelephone System

رمز المشروع:  RFS 224

عرض الملف