عدد النتائج: 10100

Bubiyan island environmental assessment and preparation of a master plan

2004

KISR Report

Proposal

المساهمون:  Roy, W.

الموضوعات:  Information technology. ,  Integrated information system. ,  environmental data. ,  Data control.

المشروعات:  Bubiyan Island Environmental Assessment & Preparation of a Master Plan

رمز المشروع:  EA 017C

عرض الملف

Advancement of energy conservation standards and practical measures for their implementation in Kuwait

1994

KISR Report

Amendment/Extension 'B'

المساهمون:  Al-Ramadhan, M. A.

الموضوعات:  Cooling energy requirements. Energy conservation measures. Air Conditioning systems. Peak power savings.

المشروعات:  Advancement of Energy Conservation Standards & Practical Measures for their Implementation in Kuwait

رمز المشروع:  DOE 1

عرض الملف

Naturally occurring radioactive materials produced by the oil industry in Kuwait

2009

KISR Report

Final Report

المساهمون:  Jakes, J.

الموضوعات:  Radiation--health aspect--Congress ,  Radioactivity--Congress ,  Noem, extenal exposure, radionuclide concentrations. ,  المواد المشعة بشكل طبيعي ; الجرعات الخارجية ; التلوث الإشعاعي

المشروعات:  Naturally Occuring Radioactive Materials Produced by the Oil Industry in Kuwait

رمز المشروع:  EA 026C

عرض الملف

Estimation of energy utilization index for government building type in Kuwait.

2014

KISR Report

Technical Report

المساهمون:  Al Taqi, Hanay.

الموضوعات:  Energy ,  Energy Consumption ,  Energy efficiency ,  Appliances ,  Buildings ,  Energy efficiency. ,  Government building. ,  كفاءة الطاقة ,  المباني الحكومية

المشروعات:  Estimation of Energy Utilization Index for Government Building Type in Kuwait.

رمز المشروع:  EU 045G

عرض الملف

التحقق من السلامة والاعتمادية الإنشائية لعقار سكنى ( قرطبة 3 - شارع 2 - قسيمة 565)

2015

KISR Report

Final Report

المساهمون:  سقه، ظافر.

الموضوعات:  المنشآت الخرسانية ,  المنشآت الخرسانية ,  تصميم المنشآت الخرسانية. ,  تحليل إنشائى. ,  تقييم المبانى الخرسانية القائمة. ,  مواد البناء. ,  فحص المواد بالطرق الهدامة وغير الهدامة. ,  فحص ميدانى. ,  Concrete design. ,  Structural analysis. ,  evaluation of concrete buildings. ,  Construction materials. ,  Destructive and nondestruuctive materials testing. ,  Site Investigation.

المشروعات:  (التحقق من السلامة و الاعتمادية الانشائية لعقار سكني (قرطبه - قطعة 3 - شارع 2 - قسيمة 565

رمز المشروع:  E 056S

عرض الملف

An air pollution index for the Shuaiba Industrial Area

1993

KISR Report

Final Report

المساهمون:  Khordagui, H.

الموضوعات:  Pollution index. Air quality.

المشروعات:  An Air Pollution Index for the Shuaiba Industrial Area

رمز المشروع:  EES 171

عرض الملف

Demand side management of major power consumers through remote control Phase II: implementation and demonstration of the pilot system

2010

KISR Report

Final Report

المساهمون:  Al-Mulla, A.

الموضوعات:  Energy Consuption ,  Electric power--conservation ,  Peak electrical demand and daily energy consumption ,  الحمل الكهربائي اثناء اوقات الذرة; الاستهلاك اليومي للكهرباء

المشروعات:  Demand Side Management of Major Power Consumers through Optimum Remote Control

رمز المشروع:  EU 050C

عرض الملف

Demand side management (DSM) of major power consumers through optimum remote control Phase I: evaluation of DSM measures and design of the pilot system

2010

KISR Report

Final Report

المساهمون:  Al-Mulla, A.

الموضوعات:  Peak load demand and daily energy consumption

المشروعات:  Demand Side Management of Major Power Consumers through Optimum Remote Control

رمز المشروع:  EU 050C

عرض الملف

Demand side management of major power consumers through optimum remote control

2008

KISR Report

Progress Report No. 1

المساهمون:  Al Mulla, Ahmad.

الموضوعات:  Electricity ,  Feasibility study ,  Air conditioning ,  Carbon dioxide ,  Peak load. ,  Electrical power. ,  Energy. ,  CO2 emissions. ,  الحمل الكهربائي اثناء الذروة ,  الطاقة الكهربائية ,  أستهلاك الطاقة ,  أنبعاث غاز ثاني أكسيد الكربون

المشروعات:  Demand Side Management of Major Power Consumers through Optimum Remote Control

رمز المشروع:  EU 050C

عرض الملف

Utilization of a fly ash based compound for the containment of Oil contaminated soils.

2014

KISR Report

Technical Report

المساهمون:  Abdulsalam, Mohammad.

الموضوعات:  Soil ,  Soil contamination ,  Sand ,  Fly ash ,  Chloride ,  Samples ,  Sys compound. ,  Contamination. ,  Industrial waste. ,  Oil contaminated sand. ,  Fly ash. ,  تلوث ,  تلوث صناعي ,  الرمال الملوثة بالنفط ,  رماد متطاير

المشروعات:  Utilization of a Fly Ash Based Compound for the Containment of Oil Contaminated Soils

رمز المشروع:  EU 049G

عرض الملف

Evaluation of the effectiveness of implemented treatment measures in the pilot area in Al-Dhahar,

2008

KISR Report

Progress Report No. 1

المساهمون:  El-Hawary, M.

الموضوعات:  Underground architecture. ,  Microgravity applications. ,  Cavity, sinkhole, risk, effectiveness ,  معالجة;فجوات; هبوط;مخاطر;فعاليه

المشروعات:  Evaluation of the Effectiveness of the Implemented Treatment Measures in the Pilot Area of Al-Dhahar - Phase III

رمز المشروع:  EU 049C

عرض الملف

Evaluation of the effectiveness of implemented treatment measures in the pilot area in Al-Dhahar

2008

KISR Report

Progress Report No. 2

المساهمون:  Kamal, Hasan.

الموضوعات:  Underground architecture ,  Underground architecture ,  Microgravatity application ,  Microgravatity application

المشروعات:  Evaluation of the Effectiveness of the Implemented Treatment Measures in the Pilot Area of Al-Dhahar - Phase III

رمز المشروع:  EU 049C

عرض الملف