عدد النتائج: 10091

Improve Arabian chickens performancein Kuwait by nutrition and feeding management: Phase I-growing period.

2006

KISR Report

Final Report

المساهمون:  Al-Khalaifa, H.

الموضوعات:  Improve Arabian chicken in Kuwait.

المشروعات:  Improve Arabian Chickens Performance in Kuwait by Nutrition & Feeding Management- -Phase I: Growing Period

رمز المشروع:  FA 066C

عرض الملف

Numerrical modeling and field data collection for Phases A3, A4, and A5 of Khiran pearl city.

2005

KISR Report

Proposal

المساهمون:  Rakha, Karim

الموضوعات:  Artificia lagoonsl. ,  Tidal currents. ,  Tidal flushing. ,  RMA package. ,  Advection dispersion.

المشروعات:  Numerical Modelling & Field Data Collection for Phases A3, A4, & A5 of Khairan Pearl City

رمز المشروع:  EC 035C

عرض الملف

A programme package for shrimp data storage and summarization

1981

KISR Report

Interim Report

المساهمون:  Morgan, G. R.

الموضوعات:  Programme. Shrimp.

المشروعات:  Fisheries Management Project

رمز المشروع:  MB 6

عرض الملف

evaluation of water plants greenery development in kuwait PHASE I: Introduction and evaluation

2009

KISR Report

Proposal

المساهمون:  Al-Menaie, H.S.

الموضوعات:  Water resources development ,  Water--Government policy ,  حديقة مائية; تجميل المناظر الطبيعية; نباتات مائية; زنبق مائي; كاتتيل ,  landscaping, water garden, water plants, water lily, cattail (typha latifolia)

المشروعات:  Evaluation of Water Plants Greenery Development in Kuwait - PHASE I: Introduction & Evaluation

رمز المشروع:  FA 067C

عرض الملف

Numerrical modeling and field data collection for Phases A3, A4, and A5 of Khiran pearl city.

2005

KISR Report

Amendment/Extension 'A'

المساهمون:  Rakha, Karim

الموضوعات:  Artificial lagoons. ,  Tidal currents. ,  Tidal flushing. ,  RMA package.

المشروعات:  Numerical Modelling & Field Data Collection for Phases A3, A4, & A5 of Khairan Pearl City

رمز المشروع:  EC 035C

عرض الملف

Shrimp culture project. Phase 1

1981

KISR Report

Final Report

المساهمون:  Farmer, A. S. D.

الموضوعات:  Shrimp. culture. Penaeus semisulcatus. Metapenaeus affinis. Penaeus japonicus. Extensive. Intensive. Maturation. Polyculture. Biology. Hatchery. Marking. Releasing. Restocking. Nutrition. Pathology.

المشروعات:  Shrimp Culture Project – Phase I

رمز المشروع:  MB 2

عرض الملف

Assessment of growth media, root size compartment and fertilizer source in cips

2008

KISR Report

Final Report

المساهمون:  Albaho, M.

الموضوعات:  Confined root system. ,  Root size. ,  Soilless culture. ,  Fertilizer type.

المشروعات:  Testing of Closed Production Systems for Controlled Environment Agriculture Sub Irrigation Closed Production System for Protected Cultivation – Phase II

رمز المشروع:  FA 061C

عرض الملف

Numerical modelling and field data collection for phases A3, A4, and A5 of Khiran pearl city

KISR Report

Amendment/Extension 'B'

المساهمون:  Rakha, Karim

الموضوعات:  Artificial lagoons. ,  Tidal currents. ,  Tidal flushing. ,  RMA package. ,  Advection dispersion.

المشروعات:  Numerical Modelling & Field Data Collection for Phases A3, A4, & A5 of Khairan Pearl City

رمز المشروع:  EC 035C

عرض الملف

Preliminary tidal pond culture trials using penaeus semisulcatus during 1978-1979

1981

KISR Report

Interim Report

المساهمون:  Watanabe, T.

الموضوعات:  Penaeus semisulcatus. Tidal. Pond. Culture.

المشروعات:  Shrimp Culture Project – Phase I

رمز المشروع:  MB 2

عرض الملف

Rationale of shrimp tagging in Kuwait

1978

KISR Report

Technical Report

المساهمون:  Farmer, A. S. D.

الموضوعات:  Shrimp tagging. Fishery. Shrimp fisheries.

المشروعات:  Shrimp Culture Project – Phase I

رمز المشروع:  MB 2

عرض الملف

Numerical modelling and field data collection for Phases A3, A4, and A5 of Khairan Pearl city

2007

KISR Report

Amendment/Extension 'C'

المساهمون:  Rakha, Karim.

الموضوعات:  Lakes ,  Lakes restoration ,  Righteousness ,  Artificial lagoons. ,  Tidal currents. ,  Tidal flushing ,  RMA package. ,  Advection dispersion. ,  البحيرات الأسطناعية ,  التيارات المتولدة من المد ,  تجدد المياه ,  انتشار الملوثات

المشروعات:  Numerical Modelling & Field Data Collection for Phases A3, A4, & A5 of Khairan Pearl City

رمز المشروع:  EC 035C

عرض الملف

Nutritional and biochemical studies project

1981

KISR Report

Final Report

المساهمون:  El-Dakour, S.

الموضوعات:  Fish and shrimp nutrition.

المشروعات:  Nutritional & Biochemical Studies Project

رمز المشروع:  MB 6

عرض الملف