عدد النتائج: 10091

Improvement in layer operations, data bank and least cost feed program

1998

KISR Report

Technical Report

الموضوعات:  Egg production. ,  Layer nutrition. ,  Poultry. ,  Databank.

المشروعات:  Poultry Enterprise Development Project

رمز المشروع:  AG 64

عرض الملف

Effect of different dietary protein level on the production performance of Arabic chicken in Kuwait

2008

KISR Report

Final Report

المساهمون:  Khalil, Faten.

الموضوعات:  Arabic chicken ,  Protein ,  Production performance ,  Fertility and hatchability

المشروعات:  Effect of Different Dietary Protein Level on the Production Performance of Arabic Chicken in Kuwait

رمز المشروع:  FA 045G

عرض الملف

Preparatory plan for phase ll of plant testing program for Kuwait waterfront project

1989

KISR Report

Amendment/Extension 'A'

المساهمون:  Taha, F. K.

الموضوعات:  Landscaping and ornamental plants. Greenery plan. Waterfront site.

المشروعات:  Preparatory Plan for Phase ll of Plant Testing Program for Kuwait Waterfront Project

رمز المشروع:  AG 65

عرض الملف

Bubiyan island environmental assessment and preparation of a master plan

2003

KISR Report

Proposal

المساهمون:  Albaho, M.

الموضوعات:  Soil survey. ,  Gypsic aquisalids. ,  Typic aquisalids. ,  Typic calcigypsid. ,  GIS mapping. ,  Warba island. ,  Horticultural/agricultural features.

المشروعات:  Boubyan Island Environmental Assessment & Preparation of a Master Plan - Soil Assessment

رمز المشروع:  FA 039C

عرض الملف

Microprocessor-based optimal controller for solar systems. Phase 11, Interface and testing

1983

KISR Report

Proposal

المساهمون:  Kotob, S.

الموضوعات:  Microprocessor. Optimal control. Solar cooling. HVAC control.

المشروعات:  Microprocessor-Based Optimal Controller for Solar Systems

رمز المشروع:  ASD 1

عرض الملف

Study of seasonal variation on rose flower production

2007

KISR Report

Technical Report

المساهمون:  Al Manaie, Habiba.

الموضوعات:  Rose ,  Flower ,  Climate ,  Roots ,  زهور القطف ,  الإدارة الزارعية ,  بيئة محكمة ,  أصناف الورد ,  Cut flowers. ,  Management practices. ,  Controlled environment. ,  Rose varieties

المشروعات:  Study of Seasonal Variation on Rose Flower Production

رمز المشروع:  FA 039G

عرض الملف

A review of soil survey work in Kuwait

1987

KISR Report

Technical Report

المساهمون:  Al-Nakshabandi, G. A.

الموضوعات:  Soil survey. Classification. Land use., Constraints. Future research.

المشروعات:  A Review of Soil Survey Work in Kuwait

رمز المشروع:  AG GEN

عرض الملف

Halophyte salicornia (SOS-7) evaluation and management. Phase l

1990

KISR Report

Technical Report

المساهمون:  Abdal, M.

الموضوعات:  Saline-water irrigation. Salt-tolerant. Forage. Kuwait agriculture.

المشروعات:  Halophyte Salicornia (SOS-7) Evaluation & Management

رمز المشروع:  AG 60

عرض الملف

Evaluation of new ornamental plants for use in Kuwait's landscape and demonstration gardens establishment.

2006

KISR Report

Final Report

المساهمون:  Suleiman, M.K.

الموضوعات:  Ornamental plants. ,  Climatic conditions. ,  Landscape project. ,  Salinity and drought.

المشروعات:  Evaluation of New Ornamental Plants for Use in Kuwait's Landscape and Demonstration Gardens Establishment

رمز المشروع:  FA 024C

عرض الملف

Computer-based integrated quality control system for industrial plants in Kuwait. Phase lll

1988

KISR Report

Final Report

المساهمون:  Masud, A. S.

الموضوعات:  Quality assurance. Statistical quality control. Industrial implementation. Quality control status.

المشروعات:  Computer-Based Integrated Quality System – Implementation Phase

رمز المشروع:  ASD 11

عرض الملف

Implementation of integrated quality control software at the Refrigeration Industries and Cold Storage Company (RICSCO)

1988

KISR Report

Technical Report

المساهمون:  Abu-Hijleh, E.

الموضوعات:  Control charts. Process sampling. Press shop. Coil shop. Quality at assembly.

المشروعات:  Computer-Based Integrated Quality System – Implementation Phase

رمز المشروع:  ASD 11

عرض الملف

Computer-based integrated quality control system for plants in Kuwait :

1987

KISR Report

Progress Report No. 2

المساهمون:  Masud, A. S.

الموضوعات:  Quality control awareness. Quality control status. IQS software.

المشروعات:  Computer-Based Integrated Quality System – Implementation Phase

رمز المشروع:  ASD 11

عرض الملف