عدد النتائج: 10000

Waterproofing of building basements in Kuwait, Part I, Overview on barrier systems and local conditions

1993

KISR Report

Interim Report No. 1

المساهمون:  Al-Mutairi, N.

الموضوعات:  Basement construction. Groundwater. Joints. Leaking basements. Water leakage. Water table. Waterproofing materials.

المشروعات:  Guide to Waterproofing of Building Basements in Kuwait

رمز المشروع:  BM 25

عرض الملف

Utilization of oil-contaminated soils as construction materials

1998

KISR Report

Amendment/Extension 'A'

المساهمون:  Al-Mutairi, Naji.

الموضوعات:  Asphalt concrete. ,  Oil contaminated soils (OCS).

المشروعات:  Utilization of Oil-Contaminated Soils as Construction Materials

رمز المشروع:  EB 002C

عرض الملف

Evaluation of Kuwait's raw materials for production of Portland cement

2001

KISR Report

Final Report

الموضوعات:  Limestone. ,  Clay. ,  Sand. ,  Clinker.

المشروعات:  Evaluation of Kuwait's Raw Materials for Production of Portland Cement

رمز المشروع:  EB 006C

عرض الملف

Field data for leaking basements supplement to waterproofing of building basements in Kuwait, Part I, Overview on barrier systems and local conditions

1993

KISR Report

Interim Report No. 1

المساهمون:  Engineeing Division.

الموضوعات:  Basement construction. Groundwater. Joints. Leaking basements. Water leakage. Water table. Waterproofing materials.

المشروعات:  Guide to Waterproofing of Building Basements in Kuwait

رمز المشروع:  BM 25

عرض الملف

Effects of moisture in the presence of chloride and sulfate salts on the performance of selected waterproofing materials

1996

KISR Report

Technical Report

المساهمون:  Al-Bahar, Souad.

الموضوعات:  Building basements. ,  Groundwater. ,  Leaking. ,  Materials properties. ,  Membranes.

المشروعات:  Effects of Moisture in the Presence of Chloride & Sulfate Salts on the Performance of Selected Waterproofing Materials

رمز المشروع:  EB 001G

عرض الملف

Detection of pork in processed meat

1983

KISR Report

Pre-Proposal

المساهمون:  Al Hooti, Suaad Naser.

الموضوعات:  Pork. Processed meat.

المشروعات:  Detection of Pork in Processed Meat

رمز المشروع:  BT 8

عرض الملف

Evaluation and treatment of underground cavities at Al-Dhahar Area

1996

KISR Report

Amendment/Extension 'A'

المساهمون:  Al-Mutairi, N.

الموضوعات:  Holes. ,  Limestone cavities. Grout injection. Geophsical methods. Al-Dhahar Area. Cavity treatment. Surface failure.

المشروعات:  Evaluation & Treatment of Underground Cavities at Al-Dhahar Area

رمز المشروع:  EB 001k

عرض الملف

Detection of pork in processed meat. Phase ll

1985

KISR Report

Pre-Proposal

المساهمون:  Al Hooti, Suaad Naser.

الموضوعات:  High performance liquid chromatography. Gel-electrophoresis. Animal triglycerides.

المشروعات:  Detection of Pork in Processed Meat

رمز المشروع:  BT 8

عرض الملف

Evaluation and treatment of underground cavities at Al-Dhahar Area

1995

KISR Report

Proposal

المساهمون:  Eid, W.

الموضوعات:  Holes. ,  Limestone cavities. Grout injection. Geophysical methods. Al-Dhahar area. Cavity treatment. Surface failure.

المشروعات:  Evaluation & Treatment of Underground Cavities at Al-Dhahar Area

رمز المشروع:  EB001k

عرض الملف

Detection of pork in processed meat. Phase ll

1985

KISR Report

Amendment/Extension 'A'

المساهمون:  Al Hooti, Suaad Naser.

الموضوعات:  High performance liquid chromatography. Gel-electrophoresis. Animal triglycerides.

المشروعات:  Detection of Pork in Processed Meat

رمز المشروع:  BT 8

عرض الملف

The prefeasibility study for the establishment of a wastewater treatment facility in the Shuaiba Industrial Area

1982

KISR Report

Amendment/Extension 'A'

المساهمون:  Pal, H. S.

الموضوعات:  Wastewater treatment. Shuaiba Industrial Area. Water quality . Water reuse.

المشروعات:  Pre-Feasibility Study of Establishing a Facility for Waste Water Treatment within the Shuaiba Industrial Area

رمز المشروع:  BT 2

عرض الملف

Modelling optimization and control of fermentation processes

1987

KISR Report

Final Report

المساهمون:  Kotob, S.

الموضوعات:  Singel cell protein. Estimation. Computer control. Reactor dynamics.

المشروعات:  Modelling Optimization & Control of Fermentation Processes

رمز المشروع:  BT 14

عرض الملف