عدد النتائج: 10000

Numerical model study and field data collection for the Al-Khiran pearl city development-phase A2 /

2004

KISR Report

Final Report

المساهمون:  Al-Salem, Khaled.

الموضوعات:  Waterfront. ,  Environmental impact assessment. ,  Feasibility study and modification.

المشروعات:  Numerical Model Study & Field Data Collection for the Al-Khairan Pearl City Development

رمز المشروع:  EC 017C

عرض الملف

Large scale production of soil sulfur amendment and its implementation at the Kuwait national greenery plan. :b PHASE II/

2006

KISR Report

Final Report

المساهمون:  Al-Daher, Reyad.

الموضوعات:  Soil sulfur. ,  Kuwait.

المشروعات:  Large Scale Production of Soil Sulfur Amendment & It's Implementation at the Kuwait National Greenery Plan

رمز المشروع:  FB 040C

عرض الملف

Soil data base for Kuwait /

1988

KISR Report

Technical Report

المساهمون:  Saeedy, H. S.

الموضوعات:  Geotechnical data bank. Soil information. Soil mapping.

المشروعات:  Soil Data Base for Kuwait

رمز المشروع:  BM GEN

عرض الملف

Cold bed culture for Tomato production. /

2007

KISR Report

Progress Report No. 2

المساهمون:  Abdal, Mahdi.

الموضوعات:  Agriculture ,  Tomato ,  Soils ,  Weather ,  Cold beds. ,  Protected agriculture. ,  Covering materials. ,  Cooling pad. ,  Misting. ,  السطوح الباردة ,  الزراعة المحمية ,  مواد التغطية ,  شرائح التبريد ,  الضباب

المشروعات:  Cold Bed Culture for Tomato Production

رمز المشروع:  FA 050C

عرض الملف

Evaluation of the structural integrity and safety of Kuwait's grand mosque,/

2013

KISR Report

Final Report

المساهمون:  Al Qazweeni, Jamal.

الموضوعات:  Building materials ,  Building materials ,  Concrete construction ,  Concrete construction ,  Performance ,  Performance ,  Concrete. ,  Structural system. ,  Structural safety. ,  Geotechnical analysis. ,  Structural investigation. ,  Materials evaluation. ,  Roof girders. ,  Structural repair/strengthening. ,  Building codes. ,  خرسانه ,  النظام الإنشائي ,  السلامة الإنشائية ,  التحليل الجيوتيقني ,  الدراسات الإنشائية ,  تقييم المواد ,  جسور السقف ,  التدعيم الأنشائي ,  كودات البناء

المشروعات:  Evaluation of the Structural Integrity & Safety of Kuwait's Grand Mosque

رمز المشروع:  EU 074C

عرض الملف

Environmental impact assessment for development of shore (15) of Fahaheel sea club/

2011

KISR Report

Technical Report

المساهمون:  Al Nafisi, Reem.

الموضوعات:  Space environment ,  Space environment ,  Environment impact analysis ,  Environment impact analysis ,  EIA. ,  Options. ,  Mitigation measures. ,  تقييم المردوود البيئي. ,  الخيارات ,  الإجراءات الاحترازية

المشروعات:  Environmental Impact Assessment for Development of Shore (15) of Fahaheel Sea Club

رمز المشروع:  EM 018S

عرض الملف

Study of subsurface water rise in residential areas of Kuwait /

1988

KISR Report

Addendum to Final Report

المساهمون:  Hamdan, L.

الموضوعات:  Subsurface water rise. MEW's contribution. Water quality maps. Hydrographs. Replacement wells.

المشروعات:  Study of Subsurface Water Rise in the Residential Area of Kuwait

رمز المشروع:  EES 56

عرض الملف

Utilization of oil-contaminated soils as construction materials /

2001

KISR Report

Progress Report No. 2

المساهمون:  Al-Mutairi, N.

الموضوعات:  Crude oil. ,  Asphalt concrete. ,  Contaminated sand. ,  Roads. ,  Oil lakes.

المشروعات:  Utilization of Oil-Contaminated Soils as Construction Materials

رمز المشروع:  EB 002C

عرض الملف

Numerical model study and field data collection for the Al-Khiran pearl city development-phase A2 /

2004

KISR Report

Final Report

المساهمون:  Al-Salem, Khaled.

الموضوعات:  Shoals. ,  Water circulation. ,  Wave. ,  Breakwater.

المشروعات:  Numerical Model Study & Field Data Collection for the Al-Khairan Pearl City Development

رمز المشروع:  EC 017C

عرض الملف

An overview of groundwater development status in Kuwait /

1989

KISR Report

Final Report

المساهمون:  Siwek, Z.

الموضوعات:  Aquifers. Groundwater exploration. Groundwater development. Groundwater mining. Brakish water. Fresh water. Water levels. Water quality. Water management.

المشروعات:  An Overview of Groundwater Development in Kuwait

رمز المشروع:  EES 119

عرض الملف

Numerical model study and field data collection for the Al-Khiran pearlcity development :

2001

KISR Report

Final Report

الموضوعات:  Water level. ,  Tidal current. ,  Sediment transport. ,  Water circulation. ,  Water quality.

المشروعات:  Numerical Model Study & Field Data Collection for the Al-Khiran Pearlcity Development

رمز المشروع:  VH 001C

عرض الملف

Supplementary oceanographic survey of the Shuaiba Offshore Area /

1984

KISR Report

Final Report

المساهمون:  Hilaly, N.

الموضوعات:  Oceanography survey. Shuaiba Industrial Area. Bathymetric and parametric data. Lagrangian currents.

المشروعات:  Supplementary Oceanographic Survey of the Shuiba Offsahore Area

رمز المشروع:  EES 19

عرض الملف