عدد النتائج: 10000

Feasibility study of sanitary waste treatment system for the enlarged Shuaiba Industrial Area (2)

1982

KISR Report

Interim Report

المساهمون:  El-Baroudi, H.

الموضوعات:  Interim measures. Sanitary wastewater disposal.

المشروعات:  Interim Alternatives for Sanitary Waste Disposal

رمز المشروع:  SPP 3

عرض الملف

Geological and geophysical exploration for gravel and sand in Northern Kuwait

1978

KISR Report

Proposal

المساهمون:  Youash, Y. Y.

الموضوعات:  Geography. Geology. Kuwait. Aggregate. topography. Geomography. Jal Az-Zor. Wadi Al-Batin. Drainage.

المشروعات:  Geological and Geophysical Exploration for Gravel and Sand in Northern Kuwait

رمز المشروع:  EES 8d

عرض الملف

Hydraulic studies and environmental impact assessment for Subiya power station. Vol. Xl of Xl

1988

KISR Report

Final Report

المساهمون:  Abou-Seida, M. M.

الموضوعات:  Baseline data. Oceanographic. Meteorological and geographical. Subiya area. Subiya station.

المشروعات:  Hydraulic Studies and Environmental Impact Assessment for Subiya Power Station

رمز المشروع:  EES 88

عرض الملف

Deterioration of the concrete in the Jetty slab at Getty oil company

1984

KISR Report

Technical Report

المساهمون:  Al-Adeeb, A.

الموضوعات:  Concrete deterioration. Jetty concrete slab. Concrete testing.

المشروعات:  Deterioration of the Concrete in the Jetty Slab at Getty Oil Company

رمز المشروع:  RFS 92

عرض الملف

Landscape design and study on suitable plant list for Burgan oasis: "Spirit of the desert"

2006

KISR Report

Progress Report No. 1

المساهمون:  Suleiman, M.K.

الموضوعات:  Biodiversity conservation. ,  Native plant restoration. ,  Sustainable greenery development. ,  Desert development.

المشروعات:  Landscape Design and Study on Suitable Plant List for Burgan Oasis - Spirit of the Desert

رمز المشروع:  FA 054C

عرض الملف

Hydraulic studies and environmental impact assessment for Subiya power station. Vol. V of xi

1988

KISR Report

Final Report

المساهمون:  Abou-Seida, M. M.

الموضوعات:  Hydraulic model. Intake channel. Guide vanes. Skimmer walls.

المشروعات:  Hydraulic Studies and Environmental Impact Assessment for Subiya Power Station

رمز المشروع:  EES 88

عرض الملف

Study of measures to control mobile sand in Kuwait

1987

KISR Report

Interim Report No. 2

المساهمون:  Omar, Sameerah Ahmad.

الموضوعات:  Sand sheets. Sand dune migration. Sand dune migration model. Control of mobile sand. Vegetation survey.

المشروعات:  Study of Measure to Control Mobile Sand in Kuwait

رمز المشروع:  EES 78

عرض الملف

Estimation of wind over sea from land measurements in Kuwait

1989

KISR Report

Final Report

المساهمون:  Al-Madani, N.

الموضوعات:  Over-water winds. Statistical analysis. Kuwait International Airport. Ras Al-Khafji. Sea island.

المشروعات:  Estimation of Winds Over the Sea from Land Measurements in Kuwait

رمز المشروع:  EES 140

عرض الملف

Computer modelling techniques as a planning tool in petrochemical industry

1975

KISR Report

Technical Report

المساهمون:  Dajani, M. Z.

الموضوعات:  Petrochemical industry. Computer modelling. Linear programming models.

المشروعات:  Computer Modeling Techniques as a planning Tool in Petrochemical Industry

رمز المشروع:  PET 00

عرض الملف

As-Sabriyah and Ar-Rawdatayn oil-affected area soil survey :

2001

KISR Report

Technical Report No. 3

المساهمون:  Grealish, G.

الموضوعات:  Oil contamination. ,  Field survey. ,  Laser-induced fluorescence. ,  Map.

المشروعات:  Assessing Damage Magnitude and Recovery of the Terrestrial Eco-System - Follow-Up of Natural and Induced Desert Recovery

رمز المشروع:  FA 015C

عرض الملف

Improvement of the NIC cement factory's products

1983

KISR Report

Final Report

المساهمون:  Al-Adeeb, A.

الموضوعات:  Improvement of concrete products. Quality control. Ready-mix. Tiles. Kerbstones. Blocks. Concrete pipes and steam curing.

المشروعات:  Improvement of NIC's Cement Factoy Products

رمز المشروع:  BM 20

عرض الملف

Environmental assessment of the intertidal zone of Kuwait

1984

KISR Report

Quarterly Progress Report No. 1

المساهمون:  Al-Bakri, D.

الموضوعات:  Environmental assessment. Intertidal zone. Macrofauna. Sediments. Ecosystem.

المشروعات:  Environmental Assessment of the Intertidal Zone in Kuwait

رمز المشروع:  EES 35

عرض الملف