KISR Report
Proposal
المساهمون: Sartawi, M.
الموضوعات: Feasibility of interconnection. Electrical networks.
المشروعات: Feasibility Study for the Interconnection of the Gulf States Electrical Power Systems
رمز المشروع: ENG 26
Interim Report No. 4
الموضوعات: Electrical power systems. Electrical interconnection. Gulf Cooperation Council.
Interim Report No. 1
المساهمون: Debs, A. S.
الموضوعات: Power systems interconnected Arabian Gulf transfer cabability.
Final Report
الموضوعات: Electrical generation planning. Electrical transmission planning. Interconnection of electric power systems.
Interim Report No. 2
الموضوعات: Power systems interconnection. Network planning. Gulf Cooperation Council.
Amendment/Extension 'A'
Interim Report No. 3
الموضوعات: Power systems. Information management. Gulf Cooperation Council.