عدد النتائج: 638
المركز: Engineering Division x

Radiation calibration laboratory

1984

KISR Report

Interim Report No. 1

المساهمون:  Sayigh, A.

الموضوعات:  Thermopile detectors. Pyrheliometers. Pyranometers. Angstrom. Abbot, Michelson, Eppley. Moll-gorczynski, Photon detectors.

المشروعات:  Radiation Calibration Laboratory

رمز المشروع:  SE 45

عرض الملف

An approach to cool storage assessment study

1984

KISR Report

Interim Report No. 1

المساهمون:  Suri, R. K.

الموضوعات:  Cool storage. Peak power shaving. Cool storage volume.

المشروعات:  An Approach to Cool Storage Assessment Study

رمز المشروع:  SE 54

عرض الملف

Solar cooling of school semi annual report 3&4

1982

KISR Report

Interim Report

المساهمون:  Suri, R. K.

الموضوعات:  Absorption cooling. Solar cooling. Litchium bromide absorption chiller.

المشروعات:  Solar Cooling of School Semi Annual Report 3&4

رمز المشروع:  SE 7 KISR

عرض الملف

Photovoltaic solar power backup system for traffic light

1983

KISR Report

Proposal

المساهمون:  Kamal, A.

الموضوعات:  Photovoltaic panels. Photovoltaic solar power system. Inverters. Storage batteries. Transfer switch.

المشروعات:  Photovoltaic Solar Power Backup System for Traffic Lights

رمز المشروع:  SE 51

عرض الملف

Degradation of flat surface by dust solar applications

1984

KISR Report

Final Report

المساهمون:  Sayigh, A.

الموضوعات:  Degradation from dust. Dust. Accumulation. Relectivity. Transmissivity. Cleaning technique. Dust measurement equipment.

المشروعات:  Degradation of Flat Surface by Dust Solar Applications

رمز المشروع:  SE 43

عرض الملف

Design of solar absorption cooling system for the engineering department for military projects regional office at Mushrif

1982

KISR Report

Interim Report No. 1

المساهمون:  Ayyash, S.

الموضوعات:  MOD Regional Office at Mushrif. Solar absorption cooling system. Energy Conservation measures.

المشروعات:  Design of Solar Absorption Cooling System for the Engineering Department for Military Projects Regional Office at Mushrif

رمز المشروع:  SE 44

عرض الملف

Design of solar absorption cooling system for the engineering department for military projects regional office at Mushrif

1982

KISR Report

Interim Report No. 2

المساهمون:  Ayyash, S.

الموضوعات:  Solar power system. Photovoltaic modules. Investers. Electrical load. Simulation results.

المشروعات:  Design of Solar Absorption Cooling System for the Engineering Department for Military Projects Regional Office at Mushrif

رمز المشروع:  SE 44

عرض الملف

Performance of wall construction in Kuwait

1997

KISR Report

Final Report

المساهمون:  Al-Mudhaf, H.

الموضوعات:  Nonperformance. ,  Masonry units. ,  Mortars. ,  Concrete blocks.

المشروعات:  Performance of Wall Construction in Kuwait

رمز المشروع:  BM 30

عرض الملف

Worldwide status of wind energy technology

1990

KISR Report

Technical Report

المساهمون:  Al-Tukhaim, K.

الموضوعات:  Wind energy conversion systems. Coefficient factor. Wind turbine systems.

المشروعات:  Assessment of Energy Technologies

رمز المشروع:  DOE 10

عرض الملف

Building in Kuwait climate

1979

KISR Report

Final Report

المساهمون:  Allison, T. R.

الموضوعات:  Buildings. Climate. Heat.

المشروعات:  Building in the Kuwait Climate

رمز المشروع:  KISR PPI/

عرض الملف

Condition assessment of the guest palace at Bayan palace

1999

KISR Report

Technical Report

المساهمون:  Sadek, A. W.

الموضوعات:  Concrete skeleton. ,  Concrete quality. ,  building elements. ,  Bayan palace (Kuwait).

المشروعات:  Condition Assessment of the Guest Palace at Bayan Palace

رمز المشروع:  EB 015S

عرض الملف

Condition assessment of the guest palace at Bayan palace

KISR Report

Technical Report

المساهمون:  Sadek, A. W.

الموضوعات:  Concrete skeleton. ,  Concrete quality. ,  building elements. ,  Bayan palace (Kuwait).

المشروعات:  Condition Assessment of the Guest Palace at Bayan Palace

رمز المشروع:  EB 015S

عرض الملف