عدد النتائج: 638
المركز: Engineering Division x

Performance of wall construction in Kuwait

1990

KISR Report

Amendment/Extension 'A'

المساهمون:  Al-Adeeb, A.

الموضوعات:  Wall construction. Stability. Stress analysis.

المشروعات:  Performance of Wall Construction in Kuwait

رمز المشروع:  BM 30

عرض الملف

Investigation of settlement in refinery units at Mina Al-Ahmadi

1988

KISR Report

Final Report (Revised)

المساهمون:  Saeedy, H. S.

الموضوعات:  Concrete slab. Remedial measures. Geotechnical investigation. Grouting.

المشروعات:  Investigation of Settlement in Refinery Units at Mina Al-Ahmadi

رمز المشروع:  BM 28

عرض الملف

Evaluation and rehabilitation of runway 15R-33L at Kuwait International Airport. Vol. 2

1987

KISR Report

Final Report

المساهمون:  Saeedy, H. S.

الموضوعات:  Geotechnical. Subbase. Subgrade. Caliche soil. Silty calcerous sand. Gatch. California bearing ratio. Standard penetration. Dynamic cone penetration. Permeability.

المشروعات:  Evaluation Program for Kuwait Airport Runway

رمز المشروع:  BM 26

عرض الملف

Investigation of settlement in refinery units at Mina Al-Ahmadi

1988

KISR Report

Proposal

المساهمون:  Saeedy, H. S.

الموضوعات:  Settlement of concrete slab. Remedial measures for settlement. Geotechnical investigation. Survey of settlement.

المشروعات:  Investigation of Settlement in Refinery Units at Mina Al-Ahmadi

رمز المشروع:  BM 28

عرض الملف

Investigation of settlement in refinery units at Mina Al-Ahmadi

1988

KISR Report

Proposal

المساهمون:  Saeedy, H. S.

الموضوعات:  Settlement of concrete slab. Remedial measures for settlement. Geotechnical investigation. Survey of settlement.

المشروعات:  Investigation of Settlement in Refinery Units at Mina Al-Ahmadi

رمز المشروع:  BM 28

عرض الملف

Evaluation of the quality and alkali reactivity of aggregate concrete works in Kuwait

1987

KISR Report

Pre-Proposal

المساهمون:  Daoud, O.

الموضوعات:  Concrete works. Concrete.

المشروعات:  Evaluation of the Quality & Alkali Reactivity of Aggregate Concrete Works in Kuwait

رمز المشروع:  BM 27

عرض الملف

Investigation of settlement in refinery units at Mina Al-Ahmadi

1988

KISR Report

Final Report

المساهمون:  Saeedy, H. S.

الموضوعات:  Settlement of concrete slab. Remedial measures for settlement. Geotechnical investigation. Survey of settlement.

المشروعات:  Investigation of Settlement in Refinery Units at Mina Al-Ahmadi

رمز المشروع:  BM 28

عرض الملف

Practical verification of energy conservation system for Kuwaiti buildings

1982

KISR Report

Pre-Proposal

المساهمون:  Engineering Division.

الموضوعات:  Energy conservation. Kuwaiti buildings.

المشروعات:  Practical Verification of Energy Conservation Systems for Kuwaiti Buildings

رمز المشروع:  BM 17

عرض الملف

Practical verification of energy conservation systems for Kuwaiti buildings

1987

KISR Report

Amendment/Extension 'A'

المساهمون:  Kellow, M.

الموضوعات:  Energy conservation. Buildings. Kuwait. Thermal performance. Building assemblies.

المشروعات:  Practical Verification of Energy Conservation Systems for Kuwaiti Buildings

رمز المشروع:  BM 17

عرض الملف

Development of low-rise high intensity housing strategy prototype for interurban land and new neighborhoods in Kuwait :

1985

KISR Report

Proposal

المساهمون:  Tehrani, Y. S.

الموضوعات:  Interurban. Land profile. Housing prototype. Government housing. Low rise housing. Land use intensity. Land acquisition regulations.

المشروعات:  Government Housing Studies

رمز المشروع:  BM 22/2

عرض الملف

Housing services preferences of applicants for government housing

1989

KISR Report

Proposal

المساهمون:  Taylor, B.

الموضوعات:  Housing preferences. Questionnaire survey. Forecasting. Policy implication.

المشروعات:  Government Housing Studies

رمز المشروع:  BM 22/7

عرض الملف

Alternative land-use intensity for Kuwait government housing studies. Vol. ll

1985

KISR Report

Final Report

المساهمون:  Engineering Division.

الموضوعات:  Land-use. Urban sprawl. Government high-rise housing. Low-rise housing. Housing. Utility. Infrastructure. Development. FAR. Dwelling. Zonning. Plot.

المشروعات:  Government Housing Studies

رمز المشروع:  BM 22/1

عرض الملف