عدد النتائج: 638
المركز: Engineering Division x

Operational readiness and maintenance of the Sulaibiya solar complex

1986

KISR Report

Final Report

المساهمون:  Al-Kandari, A.

الموضوعات:  Solar power plant. Collector field. Thermal storage system.

المشروعات:  Operation Readiness & Maintenance of the Sulaibiya Solar Complex

رمز المشروع:  ENG 27

عرض الملف

ISDN study for Kuwait

1987

KISR Report

Proposal

المساهمون:  Akhtar, H.

الموضوعات:  Telephone. Computer communications.

المشروعات:  ISDN Study for Kuwait

رمز المشروع:  EL 20

عرض الملف

Establishing a braille publishing facility at Kuwait association for the blind

1996

KISR Report

Amendment/Extension 'A'

المساهمون:  Al-Matar, O.

الموضوعات:  Blind ,  Blind ,  Publishing facility. Equipment selection. Software development. System installation. Staff training.

المشروعات:  Establishing a Braille Publishing Facility at Kuwait Association for the Blind

رمز المشروع:  ES 005c

عرض الملف

Advanced process control at Mina Al-Ahmadi refinery :

1995

KISR Report

Final Report

المساهمون:  ABB Simcon-Houston Inc.

الموضوعات:  Advanced control. Process control. Refinery. Refinery modernization. Benefit calculation. Multivariable control.

المشروعات:  Advanced Process Control at Mina Al-Ahmadi Refinery - Master Plan Development & Control Implementation

رمز المشروع:  ES 002c

عرض الملف

Operation readiness and maintenance of the Sulaibiya solar complex

1986

KISR Report

Amendment/Extension 'A'

المساهمون:  Al-Kandari, A.

الموضوعات:  Solar thermal power plants. Solar desalination. MSF desalination. RO desalination. Solar ponds. Solar greenhouses. Integrated solar complexes.

المشروعات:  Operation Readiness & Maintenance of the Sulaibiya Solar Complex

رمز المشروع:  ENG 27

عرض الملف

Operation readiness and maintenance of the Sulaibiya solar complex

1985

KISR Report

Proposal

المساهمون:  Moustafa, S.

الموضوعات:  Solar thermal power plants. Solar desalination. MSF desalination. RO desalination. Solar ponds. Solar greenhouses. Integrated solar complexes.

المشروعات:  Operation Readiness & Maintenance of the Sulaibiya Solar Complex

رمز المشروع:  ENG 27

عرض الملف

Identification of pathways of pollutant movement towards groundwater in northern Kuwait

1999

KISR Report

Proposal

المساهمون:  Viswanathan, M. N.

الموضوعات:  Fresh grandwater lenses. ,  Leaching. ,  Sorption. ,  Rainfall. ,  Infiltration. ,  Fiber optic technology.

المشروعات:  Identification of Pathways of Pollutant Movement towards Groundwater in Northern Kuwait

رمز المشروع:  ES 010K

عرض الملف

A hybrid method for the hydraulic calculations in water piping networks

1985

KISR Report

Technical Report

المساهمون:  Karaki, S.

الموضوعات:  Water networks. Numerical methods. Steady state. Sparsity.

المشروعات:  Water Interactive Graphics Analysis Program

عرض الملف

The water interactive graphics analysis program

1984

KISR Report

Final Report

المساهمون:  Karaki, S.

الموضوعات:  Interactive computing. Computer graphics. Water networks.

المشروعات:  Water Interactive Graphics Analysis Program

رمز المشروع:  ENG 20

عرض الملف

Water interactive graphics analysis program

1982

KISR Report

Proposal

المساهمون:  Karaki, S.

الموضوعات:  Water networks. Modelling. Interactive computing. Graphics.

المشروعات:  Water Interactive Graphics Analysis Program

رمز المشروع:  ENG 20

عرض الملف

Photovoltaic assessment study

1983

KISR Report

Proposal

المساهمون:  Debs, A. S.

الموضوعات:  Photovoltaic assessment.

المشروعات:  Photovoltaic Assessment Study

رمز المشروع:  ENG 22

عرض الملف

Application of computer methods for the study of Kuwait water network

1985

KISR Report

Final Report

المساهمون:  Karaki, S.

الموضوعات:  Kuwait water network. Interactive computing graphics. Network planning.

المشروعات:  Application of Computer Methods for the Study of Kuwait Water Network

رمز المشروع:  ENG 21

عرض الملف