عدد النتائج: 3
المركز: Environment and Urban Development Division x

المشروع: Data Collection in Support of the Numerical Model Study for the Al-Kairan Pearl City Development x

Data collection in support of the numerical model study for the Al-Khiran pearl city development-PHASE A1.

2004

KISR Report

Final Report

المساهمون:  Al Holail, Faisl Mohammad.

الموضوعات:  Field data. ,  Water level. ,  Current. ,  Numerical model. ,  RMA model.

المشروعات:  Data Collection in Support of the Numerical Model Study for the Al-Kairan Pearl City Development

رمز المشروع:  EC 016C

عرض الملف

Data collection in support of the numerical model study for the Al-Khiran pearl city development :

2003

KISR Report

Proposal

المساهمون:  Al Holail, Faisl Mohammad.

الموضوعات:  Current speed. ,  Water level. ,  Site visit. ,  Khour-Al-Mufateh.

المشروعات:  Data Collection in Support of the Numerical Model Study for the Al-Kairan Pearl City Development

رمز المشروع:  EC 016C

عرض الملف

Data collection in support of the numerical model study for the Al-Khiran pearl city development :

2004

KISR Report

Progress Report No. 1

المساهمون:  Al Holail, Faisl Mohammad.

الموضوعات:  Current. ,  Tidal level. ,  Site visit. ,  Monitoring. ,  Field data.

المشروعات:  Data Collection in Support of the Numerical Model Study for the Al-Kairan Pearl City Development

رمز المشروع:  EC 016C

عرض الملف