Upgradation, regular upkeep and maintenance of hydraulics laboratory, wind tunnel facility and other infrastructure of the hydraulics laboratory.
2006
KISR Report
Technical Report
المساهمون:
Neelamani, Subramaniam.
الموضوعات:
Glass flume.
,
Wave basin.
,
Wave maker.
,
Lab and field instruments.
,
Calibration.
,
Physical model study.
المشروعات:
Upgradation, regular upkeep and maintenance of hydraulics laboratory, wind tunnel facility and other infrastructure of the hydraulices laboratory./
رمز المشروع:
EC 015G
عرض الملف