عدد النتائج: 781
المركز: Environmental and Earth Sciences Division x

Monitoring of oceanographic characteristics and baseline studies on oil and non-oil pollutants in the territorial waters of Kuwait. Phase II

1986

KISR Report

Progress Report No. 6

المساهمون:  Literathy, P.

الموضوعات:  Seawater monitoring. Oceanography. Petroleum hydrocarbons. Tar ball survey. Heavy metals. Marine sediment. Biota. Chlorinated hydrocarbons.

المشروعات:  Monitoring of Oceanographic Characteristics & Baseline Studies on Oil & non-Oil Pollutants in the Territorial Waters of Kuwait - Phase II

رمز المشروع:  EES 60

عرض الملف

Air bubble barriers effect on jelly fish movement

1989

KISR Report

Final Report

المساهمون:  Lo, J. M.

الموضوعات:  Water intakes. Water kinematics. Air bubble barriers. Jelly fish.

المشروعات:  Air Bubble Barriers Effect on Jelly Fish Movement

رمز المشروع:  EES 126

عرض الملف

Nested circulation model for Kuwait Bay-application for Sulaibikhat Area

1989

KISR Report

Final Report

المساهمون:  Gopalakrishnan, T. C.

الموضوعات:  Nested modelling. Local areas. Sulaibikhat Bay.

المشروعات:  Nested Circulation Model for Kuwait Bay - Application for Sulaibikhat Area

رمز المشروع:  EES 128

عرض الملف

Wind transfer functions with application to oil pollution risk analysis

1989

KISR Report

Proposal

المساهمون:  Al-Madani, N.

الموضوعات:  Coastal winds. Kuwait International Airport. Oil risk map.

المشروعات:  Wind Transfer Functions with Application to Oil Pollution Risk Analysis

رمز المشروع:  EES 148

عرض الملف

Subsurface water rise in residential areas of Kuwait

1985

KISR Report

Progress Report

المساهمون:  Hamdan, L.

الموضوعات:  Drilling. Wells. Geophysics. Geotechnical testing. Hydrology. Aquifer modelling.

المشروعات:  Study of Subsurface Water Rise in the Residential Area of Kuwait

رمز المشروع:  EES 56

عرض الملف

Feasibility study of sanitary waste treatment system for the enlarged Shuaiba Industrial Area (ESIA). Volume IV, Appendices

1984

KISR Report

Final Report

المساهمون:  Environmental and Earth Sciences Division.

الموضوعات:  Wastewater management program. Sanitary wastewater. Solid and semisolid wastes.

المشروعات:  Feasibility Study of Sanitary Waste Treatment System for the Enlarged Shuaiba Industrial Area (ESIA)

رمز المشروع:  SPP 3

عرض الملف

Environmental impact assessment of sand and gravel quarrying activities in Kuwait

1988

KISR Report

Proposal

المساهمون:  Environmental and Earth Sciences Division.

الموضوعات:  Desert environment. Desertification. Field survey. Laboratory investigation. Sand transport.

المشروعات:  Environmental Impact Assessment of Sand and Gravel Quarrying Activities in Kuwait

رمز المشروع:  RFP 207

عرض الملف

Baseline studies of oil and non-oil pollutants in the marine environment of Kuwait. Phase lll

1987

KISR Report

Proposal

المساهمون:  Literathy, P.

الموضوعات:  Baseline survey. Oil pollution. Heavy metals. Chlorinated hydrocarbons. Oceanography. Sediment. Biota.

المشروعات:  Baseline Studies of Oil and Non-Oil Pollutants in the Marine Environment of Kuwait. Phase Lll

رمز المشروع:  RFP 205

عرض الملف

Feasibility study of sanitary waste treatment system for the enlarged Shuaiba Industrial Area

1983

KISR Report

Progress Report No. 7

المساهمون:  El-Baroudi, H.

الموضوعات:  Wastewater collection systems. Sanitary wastewater disposal.

المشروعات:  Feasibility Study of Sanitary Waste Treatment System for the Enlarged Shuaiba Industrial Area

رمز المشروع:  SPP 3

عرض الملف

Feasibility study of sanitary waste treatment system for the enlarged Shuaiba Industrial Area

1983

KISR Report

Progress Report No. 8

المساهمون:  El-Baroudi, H.

الموضوعات:  Wastewater collection systems. Sanitary wastewater disposal.

المشروعات:  Feasibility Study of Sanitary Waste Treatment System for the Enlarged Shuaiba Industrial Area

رمز المشروع:  SPP 3

عرض الملف

Fishing fleets, Fishing grounds and catches in Kuwait's territorial waters for Planning a multipurpose fishing harbor. Task 4

1989

KISR Report

Technical Report

المساهمون:  Abdullah, M. S.

الموضوعات:  Fish and shrimp catches. Fishing vessels. Field data.

المشروعات:  Fishing Fleets, Fishing Grounds and Catches in Kuwait's Territorial Waters for Planning a Multipurpose Fishing Harbor

رمز المشروع:  RFS 226

عرض الملف

Feasibility study of sanitary waste treatment system for the enlarged Shuaiba Industrial Area

1983

KISR Report

Progress Report No. 9

المساهمون:  El-Baroudi, H.

الموضوعات:  Wastewater collection systems. Sanitary waste treatment system.

المشروعات:  Feasibility Study of Sanitary Waste Treatment System for the Enlarged Shuaiba Industrial Area

رمز المشروع:  SPP 3

عرض الملف