عدد النتائج: 1133
المركز: Food Resources Division x

Engineering design criteria for solid waste management inthe Enlarged Shuaiba Industrial Area. Task IV A

1984

KISR Report

Interim Report IX

المساهمون:  Puskas, K.

الموضوعات:  Engineering aspects. Central treatment plant. Solid and semisolid wastes. Landfill. Incineration. Landfarming. Composing.

المشروعات:  Solid Waste Management Program for the Enlarged Shuiba Industrial Area

رمز المشروع:  SPP 4

عرض الملف

Review of suitable treatment and reuse technologies for hazardous and non-hazardous wastes and regulatory requirements for nonhazardous waste handling, recommendations. Tasks II A&C

1984

KISR Report

Interim Report III

المساهمون:  Puskas, K.

الموضوعات:  Industrial solid waste. Hazardous. Non-hazardous solid waste. treatment technology. disposal. Reuse technology. Regulation of non-hazardous wastes. ESIA survey.

المشروعات:  Solid Waste Management Program for the Enlarged Shuiba Industrial Area

رمز المشروع:  SPP 4

عرض الملف

Study of measures to control mobile sand in Kuwait

1987

KISR Report

Interim Report No. 2

المساهمون:  Omar, Sameerah Ahmad.

الموضوعات:  Sand sheets. Sand dune migration. Sand dune migration model. Control of mobile sand. Vegetation survey.

المشروعات:  Study of Measure to Control Mobile Sand in Kuwait

رمز المشروع:  EES 78

عرض الملف

As-Sabriyah and Ar-Rawdatayn oil-affected area soil survey :

2001

KISR Report

Technical Report No. 3

المساهمون:  Grealish, G.

الموضوعات:  Oil contamination. ,  Field survey. ,  Laser-induced fluorescence. ,  Map.

المشروعات:  Assessing Damage Magnitude and Recovery of the Terrestrial Eco-System - Follow-Up of Natural and Induced Desert Recovery

رمز المشروع:  FA 015C

عرض الملف

Assessing damage magnitude and recovery of the recovery of the terrestrial ecosystem/follow-up of natural and iduced desert recovery

2001

KISR Report

Technical Report No. 1

المساهمون:  Grealish, G.

الموضوعات:  Soil. ,  Oil contamination. ,  Field survey. ,  Laser induced flurescence. ,  Map.

المشروعات:  Assessing Damage Magnitude and Recovery of the Terrestrial Eco-System - Follow-Up of Natural and Induced Desert Recovery

رمز المشروع:  FA 015C

عرض الملف