عدد النتائج: 3
المركز: Techno-Economics Division x

المشروع: Battey plant visits for the period August 6, 1981-September 21, 1981 x

Battery plant marketing and production system. Phase l

1981

KISR Report

Final Report

المساهمون:  Elimam, A. A.

الموضوعات:  Battery. Marketing. Production system.

المشروعات:  Battey plant visits for the period August 6, 1981-September 21, 1981

رمز المشروع:  TE 49 KISR

عرض الملف

Battey plant visits for the period August 6, 1981-September 21, 1981

1982

KISR Report

Technical Report

المساهمون:  Kharaishi, N. M.

الموضوعات:  Lead acid battery. Quality control. Oxidation plant. Casting. Paste. Mixing. Curing. Formation.

المشروعات:  Battey plant visits for the period August 6, 1981-September 21, 1981

رمز المشروع:  TE 49 KISR

عرض الملف

Battery plant marketing and production systems, Phase l, Annex ll, Quality control system

1981

KISR Report

Final Report

المساهمون:  Al-Ghunaim, R.

الموضوعات:  Control system. Control system. Quality assurance.

المشروعات:  Battey plant visits for the period August 6, 1981-September 21, 1981

رمز المشروع:  TE 49 KISR

عرض الملف