عدد النتائج: 689
المركز: Techno-Economics Division x

Organization and management of solid waste reuse, treatment and disposal in the Enlarged Shuaiba Industrial Area

1984

KISR Report

Interim Report X.

المساهمون:  ElNawawy, A. S.

الموضوعات:  Organization and management. Monitoring. Waste treatment facilities. Contractor. EPC/SAA.

المشروعات:  Organization and Management of Solid Waste Reuse, Treatment and Disposal in the Enlarged Shuaiba Industrial Area.

رمز المشروع:  SPP 4

عرض الملف

Analysis of samples of current field failures. Task F4

1982

KISR Report

Interim Report No. 21.

المساهمون:  Al-Deeb, A. M.

الموضوعات:  Asbestos/cement pipes. Pipe failure. Field investigation.

المشروعات:  Analysis of Samples of Current Field Failures. Task F4

رمز المشروع:  SPP 1

عرض الملف

Leaching corrosion of asbestos-cement pipes

1983

KISR Report

Interim Report No. 34.

المساهمون:  Al-Deeb, A. M.

الموضوعات:  Leaching corrosion. Free lime. Asbestos/cement.

المشروعات:  Leaching Corrosion of Asbestos-Cement Pipes

رمز المشروع:  SPP 1

عرض الملف

Reliability, availability and risk assessment for reverse osmosis

1999

KISR Report

Final Report

المساهمون:  Chaudhuri, D.

الموضوعات:  Failure. ,  Hollow-fiber trains. ,  Spiral-wound trains.

المشروعات:  Reliability, Availability and Risk Assessment for Reverse Osmosis

رمز المشروع:  TD 001K

عرض الملف

Development and Improvement of Asbestos-Cement Pipe Performance in Kuwait

1983

KISR Report

Interim Report No. 29.

المساهمون:  Lalwani, S.

الموضوعات:  Asbestos fibers.

المشروعات:  Development and Improvement of Asbestos-Cement Pipe Performance in Kuwait

رمز المشروع:  SPP 1

عرض الملف

Density and wetness expansion of ASB/CEM pipes

1983

KISR Report

Interim Report No. 38.

المساهمون:  Matti, M.

الموضوعات:  Coefficient of expansion. Density; Asbestos/cement pipes.

المشروعات:  Density and Wetness Expansion of ASB/CEM Pipes

رمز المشروع:  SPP 1

عرض الملف

Composite mix design in the production of asbestos/cement pipes

1983

KISR Report

Interim Report No. 30.

المساهمون:  Elimam, A. A.

الموضوعات:  Mix optimization-linear programming. Separable programming.

المشروعات:  Composite Mix Design in the Production of Asbestos/Cement Pipes

رمز المشروع:  SPP 1

عرض الملف

Development and Improvement of Asbestos-Cement Pipe Performance in Kuwait

1983

KISR Report

Interim Report No. 35.

المساهمون:  Al-Deeb, A. M.

الموضوعات:  Design curve. Asbestos/cement water pressure pipes.

المشروعات:  Development and Improvement of Asbestos-Cement Pipe Performance in Kuwait

رمز المشروع:  SPP 1

عرض الملف

Production planning and control system

1983

KISR Report

Interim Report No. 32.

المساهمون:  Elmaghraby, S. E.

الموضوعات:  Production planning. Asbestos/cement pipe production.

المشروعات:  Development and Improvement of Asbestos-Cement Pipe Performance in Kuwait

رمز المشروع:  SPP 1

عرض الملف

Development of an energy economics decision support system

1990

KISR Report

Proposal

المساهمون:  Al-Shatti, A. M.

الموضوعات:  Energy economy. Modeling. Decision support system.

المشروعات:  Development of an Energy Economics Decision Support System

رمز المشروع:  RFP 262

عرض الملف

Effect of water table on ASB-CEM pipe performance

1983

KISR Report

Interim Report No. 37.

المساهمون:  Matti, M.

الموضوعات:  Abestos/cement. Subsurface water table. Sulphates.

المشروعات:  Effect of Water Table on ASB-CEM Pipe Performance

رمز المشروع:  SPP 1

عرض الملف

A prefeasibility study on the use of reclaimed tire rubber for road construction in Kuwait

1982

KISR Report

Technical Report

المساهمون:  Girgis, M.

الموضوعات:  Reclaimed rubber. Rubberized roads. Cost of rubberized roads.

المشروعات:  A Prefeasibility Study on the use of Reclaimed tire Rubber for Road Construction in Kuwait

رمز المشروع:  PET 11 KISR

عرض الملف