عدد النتائج: 689
المركز: Techno-Economics Division x

Manufacturing process parametrs at Arabian Light Metal Company

1989

KISR Report

Technical Report

المساهمون:  Al-Sukar, E.

الموضوعات:  Control parameters. Manufacturing stages. Production systems. Input and output.

المشروعات:  Performance Improvement of Aluminum Profiles, Doors & Windows in Kuwait

رمز المشروع:  ASD 12

عرض الملف

Adaptive controls of selected processes at KNPC :

1989

KISR Report

Amendment/Extension 'A'

المساهمون:  Kotob, S.

الموضوعات:  Adaptive control. Advanced control.

المشروعات:  Adaptive Controls of Selected Processes at KNPC

رمز المشروع:  ASD 18

عرض الملف

Investigation of the possible utilization of robotic system in central analytical laboratory

1988

KISR Report

Amendment/Extension 'A'

المساهمون:  Al-Ammar, J.

الموضوعات:  Robotic systems. Central analytical laboratory.

المشروعات:  Investigation of the Possible Utilization of Robotic System in KISR's Central Analytical Laboratory

رمز المشروع:  ASD 24

عرض الملف

Assessment of the quality control practices of the Arabian Light Metal Company. Task 1.2

1989

KISR Report

Technical Report No. 4

المساهمون:  Al-Sebaiee, A. M.

الموضوعات:  Aluminum anodization. Aluminum extrusion. Aluminum quality control. Aluminum quality assurance.

المشروعات:  Performance Improvement of Aluminum Profiles, Doors & Windows in Kuwait

رمز المشروع:  ASD 12

عرض الملف

Optimization of sewage collection network in Kuwait. Phase ll and lll

1987

KISR Report

Proposal

المساهمون:  Elimam, A. A.

الموضوعات:  Wastewater collection network. Mathematical programming. Optimization.

المشروعات:  Optimization of Sewer Networks Design in Kuwait: Phase II & III

رمز المشروع:  ASD 6

عرض الملف

Optimization of sewage collection network in Kuwait. Phase ll and lll

1986

KISR Report

Pre-Proposal

المساهمون:  Elimam, A. A.

الموضوعات:  Wastewater collection network. Mathematical programming. Optimization.

المشروعات:  Optimization of Sewer Networks Design in Kuwait: Phase II & III

رمز المشروع:  ASD 6

عرض الملف

Computer-based calibration for Kuwait metrological center of Kuwait air force :

1987

KISR Report

Manual

المساهمون:  Al-Osaimi, A.

الموضوعات:  Kuwait metrological center.

المشروعات:  Computer-Based Calibration for Kuwait Metrological Center of Kuwait Air Force

رمز المشروع:  ASD 10

عرض الملف

An assessment of local industries' needs and knowledge of the production planning and control techniques

1989

KISR Report

Final Report

المساهمون:  Al-Sebaiee, A. M.

الموضوعات:  Production control. Training workshop. Scheduling.

المشروعات:  An Assessment of Local Industries’ Needs & Knowledge of the Production Planning & Control Techniques

رمز المشروع:  ASD 30

عرض الملف

Evaluation of the KISR training program through the opinions of its trainees

1986

KISR Report

Technical Report

المساهمون:  Al-Thabia, R.

الموضوعات:  Program evaluation. Trainees. Training.

المشروعات:  Evaluation of the KISR Training Program Through the Opinions of its Trainees

رمز المشروع:  ASD GEN

عرض الملف

Static VAR compensators in transmission and distribution networks

1987

KISR Report

Technical Report

المساهمون:  Calovic, M.

الموضوعات:  Static VAR systems. Voltage and reactive power control. Harmonics.

المشروعات:  Static VAR Compensators in Transmission & Distribution Networks

رمز المشروع:  ASD GEN

عرض الملف

Costing of pipeline installations

1987

KISR Report

Technical Report

المساهمون:  Salem, A. A.

الموضوعات:  Sewer networks. Mathematical model. Productivity.

المشروعات:  Costing of Pipeline Installations

رمز المشروع:  ASD GEN

عرض الملف

Optimization of sewage collection network in Kuwait. Phase ll and lll

1988

KISR Report

Progress Report No. 1

المساهمون:  Elimam, A. A.

الموضوعات:  Sewer design. Sewer optimization. Heuristics. Standard. Pipe diameters.

المشروعات:  Optimization of Sewer Networks Design in Kuwait: Phase II & III

رمز المشروع:  ASD 6

عرض الملف