عدد النتائج: 689
المركز: Techno-Economics Division x

Installation and Performance of a 2.6 KW Stand-alone Photovoltaic System

1987

KISR Report

Technical Report

المساهمون:  Al-Busairi, H.

الموضوعات:  Photovoltaic. Stand-alone photovoltaic system. Lighting by photovoltaics.

المشروعات:  Installation and Performance of a 2.6 KW Stand-alone Photovoltaic System

رمز المشروع:  SE GEN KISR

عرض الملف

Assessment of technological capabilities in oil refining, petrochemical and fertilizer industries in Kuwait, including engineering design expertise

1985

KISR Report

Technical Report

المساهمون:  Al-Sultan, Y.

الموضوعات:  Technology transfer. Kuwait industry engineering capability. Oil refinery. Kuwait Petrochemical industry assessment. Kuwait fertilizer industry assessment. Kuwait.

المشروعات:  Assessment of Technological Capabilities in Oil Refining, Petrochemical and Fertilizer Industries in Kuwait, Including Engineering Design Expertise

رمز المشروع:  RFS 112

عرض الملف

Sulphate attack on ASB-CEM pipes in Kuwait

1983

KISR Report

Interim Report No. 36

المساهمون:  Matti, M.

الموضوعات:  Sulphate. Abestos/cement pipes.

المشروعات:  Sulphate Attack on ASB-CEM Pipes in Kuwait

رمز المشروع:  SPP 1

عرض الملف

Development and Improvement of Asbestos/cement Pipe Performance in Kuwait

1981

KISR Report

Proposal

المساهمون:  Dessouky, M. I.

الموضوعات:  Asbestos/cement. Pipes. Diagnosis. Life cycle. Mechanical. Physical and chemical testing.

المشروعات:  Development and Improvement of Asbestos/cement Pipe Performance in Kuwait

رمز المشروع:  SPP 1

عرض الملف

Kuwait manufactured products' penetration in the EU markets

2008

KISR Report

Final Report

المساهمون:  Al-Ramadhan, M.A.

الموضوعات:  Manufacture products Kuwait

المشروعات:  Kuwaiti Manufactured Products' Penetration in the EU market

رمز المشروع:  TE 039C

عرض الملف

Kuwaiti manufactured products' penetration in the EU markets

2008

KISR Report

Final Report

المساهمون:  Al-Ramadhan, M.A.

الموضوعات:  Kuwait manufactured products.

المشروعات:  Kuwaiti Manufactured Products' Penetration in the EU market

رمز المشروع:  TE 039C

عرض الملف

Kuwaiti manufactured products' penetration in the EU markets

2008

KISR Report

Final Report

المساهمون:  Al-Ramadhan, M. A.

الموضوعات:  Kuwait Manufactured Products.

المشروعات:  Kuwaiti manufactured products' penetration in the EU market

رمز المشروع:  TE 039C

عرض الملف

Microprocessor-based Optimal Controller for Solar Systems

1982

KISR Report

Final Report

المساهمون:  Kotob, S.

الموضوعات:  Lithium-bromide chiller. Solar cooling. Optimal control. Programmable controller. Microprocessor controller.

المشروعات:  Microprocessor-based Optimal Controller for Solar Systems

رمز المشروع:  TE 51 KISR

عرض الملف

Development and improvement of asbestos-cement pipe performance in Kuwait

1984

KISR Report

Final Report

المساهمون:  Elmaghraby, S. E.

الموضوعات:  Manufacturing plant studies. Fiel studies. quality control. Asbestos-cement pipes.

المشروعات:  Development and Improvement of Asbestos-Cement Pipe Performance in Kuwait

رمز المشروع:  SPP 1 KISR

عرض الملف

Feasibility study of the complete Arabic telex assembly plant

1979

KISR Report

Final Report

المساهمون:  Dessouky, M. I.

الموضوعات:  Arabic telex. Telex machines. Telex communication. Telex market.

المشروعات:  Feasibility study of the complete Arabic telex assembly plant

رمز المشروع:  TE 44 KISR

عرض الملف

Energy information system for the organization of Arab Petroleum Exporting Countries. Vol. l

1983

KISR Report

Final Report

المساهمون:  Ibrahim, L. R.

الموضوعات:  Energy data base. Economic database. Energy information system. SAS-based systems.

المشروعات:  Energy Information System for the Organization of Arab Petroleum Exporting Countries.

رمز المشروع:  ASD 3

عرض الملف

Energy analysis of electricity generation and water

1984

KISR Report

Technical Report

المساهمون:  Ayyash, S.

الموضوعات:  Power/water plants. Primary energy consumption. Temperature-induced consumption.

المشروعات:  Energy Analysis of Electricity Generation and Water Production in Kuwait

رمز المشروع:  SE GEN

عرض الملف