KDR

report(s) found: 10000

Investigation of corroded power cable and testing of thickness / uniformity of galvanized sheet

1986

KISR Report

Technical Report

Contributor(s):  Islam, M.

Subject(s):  Localized corrosion. Corroded power cable. Galvanized steel.

Project(s):  Investigation of Corroded Power Cable and Testing of Thickness / Uniformity of Galvanized Sheet

Project code:  RFS 152

View document

Cooling storage assessment for Kuwait

1984

KISR Report

Proposal

Contributor(s):  Suri, R. K.

Subject(s):  Cooling Storage. Energy management. Peak load. Saving of utilities.

Project(s):  Cooling Storage Assessment for Kuwait

Project code:  SE 54

View document

Cool storage assessment study in Kuwait

1985

KISR Report

Final Report

Contributor(s):  Suri, R. K.

Subject(s):  Cool storage. Peak power shaving. Unit cooling cost.

Project(s):  Cool Storage Assessment Study in Kuwait

Project code:  SE 54

View document

Solar cooling of a school

1983

KISR Report

Final Report

Contributor(s):  Suri, R. K.

Subject(s):  Absorption cooling. Solar cooling. Litchium bromide absorption chiller.

Project(s):  Solar Cooling of a School

Project code:  SE 7 KISR

View document

Assessment of turbidity at Shuaiba offshore seawater intakes due to dredging the KNPC pipeline trench

1986

KISR Report

Special Technical Report

Contributor(s):  Lo, J. M.

Subject(s):  Bredging. Sediment transport. Bed load. Suspended load. Wave and current interaction.

Project(s):  Assessment of Turbidity at Shuaiba Offshore Seawater Intakes Due to Dredging the KNPC Pipeline Trench

Project code:  RFS 126

View document

Bathymetric survey of the Shuaiba Offshore Area

1977

KISR Report

Technical Report

Contributor(s):  Al-Kazily, M. F.

Subject(s):  Bathymetric survey. Shuaiba Area Authority.

Project(s):  Bathymetric Survey of the Shuaiba Offshore Area

Project code:  EES 00 KISR

View document

Pre-season shrimp recruitment surveys in Saudi Arabia

1987

KISR Report

Final Report

Contributor(s):  Morgan, G. R.

Subject(s):  Open season. Catch. Landings.

Project(s):  Pre-Season Shrimp Recruitment Surveys in Saudi Arabia

Project code:  RFS 130

View document

Investigation of the corrosion problems associated with the seawater line at Kuwait shipbuilding and repairyard company

1982

KISR Report

Draft Preproposal

Contributor(s):  Islam, M.

Subject(s):  Corrosion. Seawater line. Fouling.

Project(s):  Investigation of the Corrosion Problems Associated with the Seawater Line at Kuwait Shipbuilding and Repairyard Company

Project code:  RFS 23

View document

Salt and chlorine plant effluents and the effect of mercury on the nearby aqueous and sedimentary marine environments of Kuwait

1977

KISR Report

Technical Report

Contributor(s):  Szucs, F. K.

Subject(s):  Salt. Chlorine. Mercury. Sedimentary marine environment. Kuwait.

Project(s):  Salt & Chlorine Plant Effluents & the Effect of Mercury on the Nearby Aqueous & Sedimentary Marine Environments of Kuwait

Project code:  EES 00

View document

Investigation of the corrosion problems associated with the seawater line at Kuwait shipbuilding and repairyard company

1982

KISR Report

Technical Report

Contributor(s):  Abu-Safiah, A.

Subject(s):  Corrosion. Seawater line. Fouling.

Project(s):  Investigation of the Corrosion Problems Associated with the Seawater Line at Kuwait Shipbuilding and Repairyard Company

Project code:  RFS 23

View document

Analysis of ASB/CEM plant manufacturing experiments

1983

KISR Report

Interim Report No. 33

Contributor(s):  Lalwani, S.

Subject(s):  Mix design. Cobra mill opening. Pipe formation.

Project(s):  Development and Improvement of Asbestos/Cement Pipe Performance in Kuwait

Project code:  SPP 1

View document

Performance of wall construction in Kuwait

1997

KISR Report

Final Report

Contributor(s):  Al-Mudhaf, H.

Subject(s):  Nonperformance. ,  Masonry units. ,  Mortars. ,  Concrete blocks.

Project(s):  Performance of Wall Construction in Kuwait

Project code:  BM 30

View document