KDR

report(s) found: 10000

Long term prediction of winds for Kuwait.

2007

KISR Report

Final Report

Contributor(s):  Neelamani, Subramaniam.

Subject(s):  Tall buildings and towers. ,  Wind forces. ,  Return periods. ,  Gumbel distribution.

Project(s):  Long Term Prediction of Winds for Kuwait

Project code:  EC 032C

View document

Electric power system analysis development

1981

KISR Report

Final Report

Contributor(s):  Sartawi, M.

Subject(s):  Batch computer package for power. System analysis BACPA.

Project(s):  Technological progress and industrial productivity growth in Kuwait

Project code:  TE 38

View document

Battery plant marketing and production system. Phase l

1981

KISR Report

Final Report

Contributor(s):  Elimam, A. A.

Subject(s):  Battery. Marketing. Production system.

Project(s):  Battey plant visits for the period August 6, 1981-September 21, 1981

Project code:  TE 49 KISR

View document

An assessment of provate investment behavior in Kuwait

KISR Report

Progress Report

Contributor(s):  Al Jabsheh, F.

Subject(s):  Economic ,  Analysis ,  Foreign direct investment (FDI). ,  Long-run Economic Growth. ,  Diversification. ,  Econometric analysis. ,  الأستثمار الأجنبي المباشر ,  النمو الأقتصادي الطويل الأجل ,  التنوع ,  تحليل اقتصادي قياسي

Project(s):  An Assessment of Provate Investment Behavior in Kuwait

Project code:  TE 048C

View document

Battery plant marketing and production systems, Phase l, Annex lll, Technology assessment lead-acid battery design

1981

KISR Report

Final Report

Contributor(s):  Kharaishi, N. M.

Subject(s):  Lead-acid battery. Batteries. Local battery.

Project(s):  Battey Plant Marketing and Production Systems

Project code:  TE 49 KISR

View document

Battery plant marketing and production systems, Phase l, Annex IV, Technology assessmentprocess and equipment

1981

KISR Report

Final Report

Contributor(s):  Abdel-Latif, M. I.

Subject(s):  Technology assessment. Lead-acid battry. Battery design. Batteries. Local battery.

Project(s):  Battey Plant Marketing and Production Systems

Project code:  TE 49 KISR

View document

Financial analysis and assessment for the privatisation of the wastewater reclamation complex at Sulaibiya

2000

KISR Report

Technical Report No. 6

Contributor(s):  Odedokun, M. O.

Subject(s):  Treatment. ,  Advanced. ,  Conventional. ,  Reverse osmosis. ,  Coast. ,  Feasibility.

Project(s):  Technical and Financial Assessment for the Privatization of the Wastewater Reclamation Complex at Sulaibiya

Project code:  TE 018S

View document

Wastewater reclamation, purification and reuse

1999

KISR Report

Technical Report

Contributor(s):  Chaudhuri, D.

Subject(s):  Wastewater treatment. ,  Disinfection technology. ,  Reverse osmosis.

Project(s):  Technical and Financial Assessment for the Privatization of the Wastewater Reclamation Complex at Sulaibiya

Project code:  TE 018S

View document

Benchmarking Kuwait's manufacturing sector :

2006

KISR Report

Technical Report No. 1

Contributor(s):  Al-Essa, G.

Subject(s):  Industrial Benchmarks. ,  Manufacturing sector. ,  Industrial competitiveness.

Project(s):  A Roadmap for Kuwait's industrial development

Project code:  Te 036C

View document

Availability of potential jobs, nature of mismatch and the extent of substitution possibilities of the non-nationals by nationals in the private sector of Kuwait

2000

KISR Report

Proposal

Contributor(s):  Chishti, S.

Subject(s):  Labor market reforms. ,  Private sector.

Project(s):  Availability of potential jobs, nature of mismatch and the extent of substitution possibilities of the non-nationals by nationals in the private sector of Kuwait

Project code:  TE 025C

View document

Questionnaires analysis system (annual KISR internal customer satisfaction survey and client satisfaction survey 2016)

2016

KISR Report

Technical Report

Contributor(s):  Al Fulaij, S.

Subject(s):  Questionnaires ,  Staff ,  Satisfaction ,  Customers ,  Survey. ,  Results. ,  Comparison. ,  الأستبيانات ,  النتائج ,  مقارنة

Project(s):  Questionnaires analysis system (annual KISR internal customer satisfaction survey and client satisfaction survey

Project code:  TE 024G

View document

Review of international experience in industrial planning : a roadmap for Kuwait's industrial development

2007

KISR Report

Technical Report

Contributor(s):  Ramadhan, Mohammad.

Subject(s):  Manufacturing ,  Production ,  Social development ,  Investments ,  Industrial strategy. ,  Dynamic learning process. ,  الأسترتيجية الصناعية ,  عملية التعلم الديناميكي

Project(s):  A Roadmap for Kuwait's industrial development

Project code:  TE 036C

View document