KDR

report(s) found: 10091

Battery plant marketing and production systems, Phase l, Annex IV, Technology assessmentprocess and equipment

1981

KISR Report

Final Report

Contributor(s):  Abdel-Latif, M. I.

Subject(s):  Technology assessment. Lead-acid battry. Battery design. Batteries. Local battery.

Project(s):  Battey Plant Marketing and Production Systems

Project code:  TE 49 KISR

View document

Financial analysis and assessment for the privatisation of the wastewater reclamation complex at Sulaibiya

2000

KISR Report

Technical Report No. 6

Contributor(s):  Odedokun, M. O.

Subject(s):  Treatment. ,  Advanced. ,  Conventional. ,  Reverse osmosis. ,  Coast. ,  Feasibility.

Project(s):  Technical and Financial Assessment for the Privatization of the Wastewater Reclamation Complex at Sulaibiya

Project code:  TE 018S

View document

Wastewater reclamation, purification and reuse

1999

KISR Report

Technical Report

Contributor(s):  Chaudhuri, D.

Subject(s):  Wastewater treatment. ,  Disinfection technology. ,  Reverse osmosis.

Project(s):  Technical and Financial Assessment for the Privatization of the Wastewater Reclamation Complex at Sulaibiya

Project code:  TE 018S

View document

Benchmarking Kuwait's manufacturing sector :

2006

KISR Report

Technical Report No. 1

Contributor(s):  Al-Essa, G.

Subject(s):  Industrial Benchmarks. ,  Manufacturing sector. ,  Industrial competitiveness.

Project(s):  A Roadmap for Kuwait's industrial development

Project code:  Te 036C

View document

Availability of potential jobs, nature of mismatch and the extent of substitution possibilities of the non-nationals by nationals in the private sector of Kuwait

2000

KISR Report

Proposal

Contributor(s):  Chishti, S.

Subject(s):  Labor market reforms. ,  Private sector.

Project(s):  Availability of potential jobs, nature of mismatch and the extent of substitution possibilities of the non-nationals by nationals in the private sector of Kuwait

Project code:  TE 025C

View document

Questionnaires analysis system (annual KISR internal customer satisfaction survey and client satisfaction survey 2016)

2016

KISR Report

Technical Report

Contributor(s):  Al Fulaij, S.

Subject(s):  Questionnaires ,  Staff ,  Satisfaction ,  Customers ,  Survey. ,  Results. ,  Comparison. ,  الأستبيانات ,  النتائج ,  مقارنة

Project(s):  Questionnaires analysis system (annual KISR internal customer satisfaction survey and client satisfaction survey

Project code:  TE 024G

View document

Review of international experience in industrial planning : a roadmap for Kuwait's industrial development

2007

KISR Report

Technical Report

Contributor(s):  Ramadhan, Mohammad.

Subject(s):  Manufacturing ,  Production ,  Social development ,  Investments ,  Industrial strategy. ,  Dynamic learning process. ,  الأسترتيجية الصناعية ,  عملية التعلم الديناميكي

Project(s):  A Roadmap for Kuwait's industrial development

Project code:  TE 036C

View document

An Assessment of cost structure and efficiency of public schools in Kuwait

2008

KISR Report

Proposal

Contributor(s):  Burney, Nadeem.

Subject(s):  Schools ,  Public schools ,  public education ,  Production ,  Public education. ,  Economic efficiency. ,  Economies of scale and scope. ,  Kuwait. ,  التعليم العام ,  الطلب علي المدرسين ,  مرونة الإحلال ,  اقتصاديات الحجم

Project(s):  An Assessment of cost structure and efficiency of public schools in Kuwait

Project code:  TE 029C

View document

Evaluation of radarsat synthetic aperture radar beam modes for characterizing desertification and coastal processes in Kuwait

2002

KISR Report

Final Report

Contributor(s):  Kwarteng, A.Y.

Subject(s):  Radarsat. ,  SAR. ,  Oil lakes. ,  Burgan oil field. ,  Image processing sand dunes.

Project(s):  Evaluation of radarsat synthetic aperture radar beam modes for characterizing desertification and coastal processes in Kuwait

Project code:  VD 007K

View document

Current and Expected Impact of WTO Agreement on the Kuwaiti Banking Sector.

2002

KISR Report

Final Report

Contributor(s):  Mahmood, Z.

Subject(s):  Competitive pricing. ,  Banking merger. ,  Financial deepening.

Project(s):  Current and Expected Impact of WTO Agreement on the Kuwaiti Banking Sector

Project code:  TE 026C

View document

Third shrimp and fin fisheries management workshop, fin fisheries session 4-5 December 1982 Vol.1

1984

KISR Report

Final Report

Contributor(s):  Mathews, C. P.

Subject(s):  Shrimp. Fin fish. Fisheries mangement. Stock assessment. Otolithes argenteus. Epinephelus tauvina. Lutjanus coccineus. Penaeus semisulcatus. M. affinis. Metapenaeus affinis. P. semisulcatus.

Project(s):  Third Shrimp & Fin Fisheries Management Workshop

Project code:  MB 41

View document

Bot tender to build, operate and transfer a wastewater treatment and reclamation plant at Sulaibiya :

1999

KISR Report

Technical Report No. 2

Contributor(s):  Mohammad, O. E.

Subject(s):  Advanced treatment. ,  Purified water. ,  Utilization. ,  Legal and financial conditions. ,  Evaluation system.

Project(s):  Technical and Financial Assessment for the Privatization of the Wastewater Reclamation Complex at Sulaibiya

Project code:  TE 018S

View document