KDR

report(s) found: 10000

The economic impact of changing the structure of electricity pricing in Kuwait

1987

KISR Report

Final Report

Contributor(s):  Al-Qudsi, S. S.

Subject(s):  Electricity. Rate. Pattial. General equilibrium. Equity. Conservation. Subsidy.

Project(s):  Pricing of Electricity in Kuwait

Project code:  ED 8

View document

استكشاف وتقييم مصادر جديدة للرمال بصحراء الكويت

2004

KISR Report

Technical Report

Contributor(s):  العنزي , عبدالله

Subject(s):  استكشاف وتقييم ,  رمال بصحراء الكويت

Project(s):  استكشاف وتقييم مصادر جديدة للرمال بصحراء الكويت

Project code:  EC 027C

View document

KISR research program for the Ministry of Planning on Kuwait economic plan 1985/86-1989/90

1984

KISR Report

Interim Report No. 1

Contributor(s):  Sirageldin, I.

Subject(s):  Macro econometric. Human resources development. Industrial development. Housing policies. Indicators.

Project(s):  Kuwait Economic Plan 1985/86 - 1990/91

Project code:  ED 6

View document

Assessment of the sand and gravel resources of Kuwait. Part I. Main report

1988

KISR Report

Progress Report No. 5

Contributor(s):  Al-Bakri, D.

Subject(s):  Field investigation. Laboratory tests. Test pits. Trenches. Boreholes. Resource evaluation. Resource characterization. Industrial sand. Work plan. Agreement.

Project(s):  Assessment of the Sand and Gravel Resources of Kuwait

Project code:  EES- 67

View document

Kuwait economic plan 1985/86-1989/90. Vol. l

1986

KISR Report

Final Report

Contributor(s):  Sirageldin, I.

Subject(s):  Macro-economics. Models. Policy experiments. Alternative scenarios simulation.

Project(s):  Kuwait Economic Plan 1985/86 - 1990/91

Project code:  ED 6

View document

Effect of seasonal variation on trace metal concentrations in the sediment of Kuwait Bay

2000

KISR Report

Technical Report

Contributor(s):  Al-Shemmari, H.

Subject(s):  Sediment. ,  Kuwait Bay. ,  Tracemetals. ,  Season.

Project(s):  Effect of Seasonal Variation on Trace Metal Concentrations in the Sediment of Kuwait Bay

Project code:  VS 006G

View document

Assessment of risks associated with polycyclic aromatic hydrocarbons resulting from Kuwait's oil lakes

1997

KISR Report

Final Report

Contributor(s):  Al-Yakoob, S.

Subject(s):  Exposure. Oil lakes.

Project(s):  Assessment of Risks Associated with Polycyclic Aromatic Hydrocarbons Resulting from Kuwait's Oil Lakes

Project code:  VS 009K

View document

Cost benefit evaluation of environmental production projects in the Shuaiba Industrial Area

1984

KISR Report

Final Report

Contributor(s):  Marzouk, M. S.

Subject(s):  Cost/benefit analysis. Environmental economics. Damage-cost functions. Evaluation of environmental projects. Health damage. Material damage. Pollution abatement.

Project(s):  Cost-Benefit Evaluation of Environmental Protection Orojects in the Shuaiba Area

Project code:  ED 4

View document

Study of the environmental pollution from landfill sites receiving wastes generated during the Iraqi occupation

1994

KISR Report

Final Report

Contributor(s):  Al-Muzaini, S.

Subject(s):  Leachate. Solid wastes. Pollution. Landfill sites.

Project(s):  Study of the Environmental Pollution from Landfill Sites Receiving Wastes Generated During the Iraqi Occupation

Project code:  VR 008c

View document

Kuwaiti manufactured products' penetration in the EU markets

2008

KISR Report

Final Report

Contributor(s):  Al-Ramadhan, M.A.

Subject(s):  Kuwait manufactured products'

Project(s):  Kuwaiti manufactured products' penetration in the EU markets

Project code:  TE 039C

View document

Cost benefit evaluation of environmental production projects in the Shuaiba Area

1983

KISR Report

Progress Report No. 1

Contributor(s):  Marzouk, M. S.

Subject(s):  Information base. Cost benefit. Environmental protection.

Project(s):  Cost-Benefit Evaluation of Environmental Protection Orojects in the Shuaiba Area

Project code:  ED 4

View document

KISR atmospheric boundary layer wind tunnel setup and calibration.

KISR Report

Final Report

Contributor(s):  Al-Hajraf, S.

Subject(s):  Wind tunnels. ,  Aerodynamics.

Project(s):  KISR Atmospheric Boundary Layer Wind Tunnel Setup and Calibration

Project code:  EC 003K

View document