KDR

report(s) found: 10000

Establishment of national research unit for oceanography and marine resources management

2024

Government Initiative

Interim Report no. 9

Contributor(s):  Al Husaini, M.

Subject(s):  Building ,  Marine ,  Construction ,  Operation ,  Constructions. ,  Research building. ,  Marina expansion. ,  انشاءات. ,  مبنى أبحاث. ,  توسعة حوض للقوارب. ,  دراسة جدوى اقتصادية.

Project(s):  Establishment of national research unit for oceanography and marine resources management

Project code:  P-KISR-06-06

View document

Ecological monitoring for KOC Revegetation Project under KERP (UNCC Claim No. 5000454-2)

2024

KISR Report

Proposal

Contributor(s):  Al Mutairi, M.

Subject(s):  Terrestrial heat flow ,  Terrestrial heat flow ,  Baselines ,  Baselines ,  مطالبة لجنة الأمم المتحدة للتعويضات ,  مشاريع إعادة الغطاء النباتي ,  الأداء الإيكولوجي ,  الامتثال البيني ,  United nations compensation commission claim ,  Revegetation projects ,  Ecological performance environmental compliance ,  KOC

Project(s):  Ecological monitoring for KOC Revegetation Project under KERP (UNCC Claim No. 5000454-2

Project code:  SP 005EC

View document

Assessment and mapping of fugitive gases contamination in groundwater aquifers near Kuwait oil fields

2024

KISR Report

Final Report

Contributor(s):  Chidambaram, S.

Subject(s):  Oil ,  Oil ,  Gas ,  Gas ,  دراسة حقل نفطي ,  غازات هاربة ,  نظائر مستقرة ,  غازات نبيلة ,  Investigation ,  Oil fields ,  fugitives gas ,  Stable Isotopes ,  Noble gases

Project(s):  Assessment and mapping of fugitive gases contamination in groundwater aquifers near Kuwait oil fields

Project code:  WM 082C

View document

Feasibility study of Inovative low-energy integrated system for desalination and cooling

2024

KISR Report

Proposal

Contributor(s):  Abdulrahim, H.

Subject(s):  Humidity ,  Humidity ,  Air conditioning ,  Air conditioning ,  vapor absorption cycle ,  humidification-dehumidification desalination ,  Air Conditioning ,  دورة امتصاص البخار ,  التحلية باستخدام ترطيب الهواء وإزالة الرطوبة ,  تبريد الهواء

Project(s):  Feasibility study of Inovative low-energy integrated system for desalination and cooling

Project code:  WT 082C

View document

Non-intrusive load monitoring using deep learning and smart meter data

2024

KISR Report

Annual Progress Report No.1

Contributor(s):  AL Ajmi, T.

Subject(s):  Energy conservation ,  Energy conservation ,  Renewable energy ,  Renewable energy ,  Energy effeciency ,  Load monitoring ,  Machine learning ,  Appliance load profile ,  كفاءة الطاقة ,  مراقبة الحمل الكهربائي ,  التعلم الآلي ,  ملف تحميل الجهاز ,  نمط استهلاك الأجهزة المنزلية للطاقة الكهربائية

Project(s):  Non-intrusive load monitoring using deep learning and smart meter data

Project code:  EU 154C

View document

Assessment of Pumped storage Hydropower in Kuwait

2024

KISR Report

Proposal

Contributor(s):  Alshatti, R.

Subject(s):  Renewable energy ,  Renewable energy ,  Energy storage ,  Energy storage ,  Renewable energy ,  Energy storage ,  Hydroelectric energy ,  Computational fluid dynamics ,  Jal Al Zour ,  الطاقة المتجددة ,  تخزين الطاقة ,  الطاقة الكهرومائية ,  ديناميكا الموائع الحسابية ,  جال الزور

Project(s):  Assessment of Pumped storage Hydropower in Kuwait

Project code:  EA 122K

View document

Investigation of the Modular building construction industry in Kuwait

2020

KISR Report

Technical Report

Contributor(s):  Al Mutawaa, N.

Subject(s):  Modular construction ,  Modular construction ,  Exterior walls ,  Exterior walls ,  modular construction ,  off-site construction ,  prefabricated modeles ,  sustainable solution ,  أنظمة البناء المعيارية ,  البناء خارج الموقع ,  البناء المعماري

Project(s):  Investigation of the Modular building construction industry in Kuwait

Project code:  EU 078G

View document

Integrating IOT into greenhouse control system

2024

KISR Report

Technical Report

Contributor(s):  Alsayegh, M. A. F.

Subject(s):  Raspberry Pi ,  Raspberry Pi ,  Python ,  Paython ,  Raspberry Pi ,  Database ,  PostgreSQL ,  Python ,  Javascript ,  Artificial intelligent ,  راسبيري باي ,  قاعدة البيانات ,  بوستغري ,  أس-كيو_أل ,  بايثون ,  جافا سكربت ,  الذكاء الأصطناعي

Project(s):  Integrating IOT into greenhouse control system

Project code:  FB 085G

View document

Investigating the thermophysical properties and dispersion stability of gold-water nanofluids produced via a novel one-step approach

2024

KISR Report

Final Report

Contributor(s):  Al Sayegh, Naser

Subject(s):  Water ,  Gold ,  Equipment ,  Liquids ,  Reactive ball mill ,  Suspensions ,  Thermal conductivity ,  Viscosity ,  Physical stability ,  Colloidal ,  Tablet ,  طواحين الكور التفاعلية ,  معلقات ,  توصيل حراري ,  لزوجية ,  أتزان فيزيائي ,  قرص

Project(s):  Investigating the Thermophysical Properties and Dispersion Stability of Gold-Water Nanofluids Produced Via Novel One-Step Approach

Project code:  EA 102K

View document

Geopolymerization of Boubyan clay

2024

KISR Report

Technical Report

Contributor(s):  Al Zuwayed, S.

Subject(s):  Soil ,  Polymerization ,  Climate pollution ,  X ray ,  Boubyan-clay ,  Fly ash ,  Geopolymerization ,  scanning electron microscope ,  X-ray fluorescence ,  تربة جزيرة بوبيان ,  الرماد المتطاير ,  البلمرة ,  الأشعة السينية الثانوية ,  المجهر الإلكتروني الماسح

Project(s):  Geopolymerization Of Boubyan Clay

Project code:  EU 074G

View document

The Generation of an electronic big data genome wide association selection (GWAS) Atlas for domestic chicken breeds

2024

KISR Report

Annual Progress Report No. 1

Contributor(s):  Al Anzi, B.

Subject(s):  Chicken ,  Chicken ,  DNA ,  DNA ,  chicken ,  Breeds ,  Dna ,  Atlas ,  Big data

Project(s):  The Generation of an Electronic Big Data Genome Wide Association Selection (GWAS) Atlas for Domestic Chicken Breeds

Project code:  FA 201K

View document

A modal shift framework for mass transportation in Kuwait

2024

KISR Report

Final Report

Contributor(s):  Sreekanth, K.J.

Subject(s):  Energy ,  Economy ,  Public transport ,  Transportation ,  Transportation survey ,  Economic analysis ,  Travel demand analysis ,  Sensitivity analysis ,  النقل الجماعي ,  أستبيان ,  التحليل الاقتصادي ,  السكك الحديدية ,  الطلب علي السفر

Project(s):  A Modal Shift Framework for Mass Transportation in Kuwait

Project code:  EU 143K

View document