KDR

report(s) found: 10000

Implementation and configuration of U04 on DCS

2002

KISR Report

Technical Report No. 1

Contributor(s):  Bourisli, R.

Subject(s):  Pilot plant. ,  Distributed control system.

Project(s):  KISR Petroleum Pilot Plant Distributed Control System - Phase II

Project code:  ES 018K

View document

Evaluation of ceramic floor tile upheaval at Kuwait University club

1996

KISR Report

Technical Report

Contributor(s):  Al-Qazweeni, J.

Subject(s):  External courtyard. Ceramic tile. Expansion joints. Testing. XRD. Detailing. Chemical contamination. Sulphate.

Project(s):  Evaluation of Ceramic Floor Tile Upheaval at Kuwait University Club

Project code:  EB 009s

View document

Profile and evaluation of testing services of the governmentcenter for testing and research

1997

KISR Report

Interim Report

Contributor(s):  Sadek, A. W.

Subject(s):  Quality assurance. Construction materials. Standard testing.

Project(s):  Standardization of Methodology for Testing Construction Materials Incorporating Local Conditions & Quality Measures

Project code:  EB 009C

View document

Braille daily newspapers for the Kuwait Association for Blind :

1999

KISR Report

Proposal

Contributor(s):  Al-Ghurair, Nura.

Subject(s):  Kuwait Association for the Blind. ,  KFAS network for the blind.

Project(s):  Braille Daily Newspapers for the Kuwait Association for Blind: "KFAS network for the blind"

Project code:  ES 008C

View document

Stone 600 construction detailing

1996

KISR Report

Technical Report

Contributor(s):  Al-Shaleh, M.

Subject(s):  Sand-lime brick ,  Stone, Artificial. ,  Sand-lime products. ,  Concrete blocks ,  Sand-lime block. Veneer construction. Installation method. Concrete block. Autoclaved aerated concrete (AAC) block. Facade.

Project(s):  Stone 600 Construction Detailing

Project code:  EB 008s

View document

Tilapia culture in Kuwait

1986

KISR Report

Final Report

Contributor(s):  Al-Ahmad, T.

Subject(s):  Tilapia. O. spilurus. O. aureus. Red tilapia. Mariculture. Fecundity. Feeding. Rate. Growth. Morality. Production. Cages. Raceways. Economic feasability.

Project(s):  Tilapia Culture in Kuwait

Project code:  MB 43

View document

Investigation of settlement and evaluation of subsoil conditions at Shuaibah Port

1997

KISR Report

Technical Report

Subject(s):  Asphalt pavement. Geotechnical. Subsurface soil. Marine shells and fossils.

Project(s):  Investigation of Settlement & Evaluation of Subsoil Conditions at Shuaibah Port

Project code:  EB 011S

View document

Computer-based applications for the training and education of deaf children

1999

KISR Report

Final Report

Contributor(s):  Qasem, H.

Subject(s):  Deaf sign dictionary. ,  Educational applications. ,  System installation. ,  Teacher training.

Project(s):  Computer-Based Applications for the Training & Education of Deaf Children

Project code:  ES 007C

View document

Sobaity (acanthopagrus cuvieri) hatchery manual

1984

KISR Report

Manual

Contributor(s):  Teng, S. K.

Subject(s):  Sobaity (acanthopagrus cuvieri). Fish hatchery techniques.

Project(s):  Fish Culture Project

Project code:  MB 25

View document

Computer-based applications for the training and education of deaf children

1999

KISR Report

Interim Report

Contributor(s):  Qasem, H.

Subject(s):  Software packages. ,  Program applications. ,  Education of deaf children.

Project(s):  Computer-Based Applications for the Training & Education of Deaf Children

Project code:  ES 007C

View document

Evaluation of potential for expanding the sport fishing industry through the use of artificial reefs

1982

KISR Report

Progress Report

Contributor(s):  Food Resources Division.

Subject(s):  Coral reefs. Artificial reefs. Fishing industry.

Project(s):  Evaluation of Potential for Expanding the Sport Fishing Industry through the Establishment of Artificial Reefs

Project code:  MB 35

View document

Use of imfrared imaging for detecting moisture in roof structures

1996

KISR Report

Amendment/Extension 'A'

Contributor(s):  Kamal, H.

Subject(s):  Roofs ,  Infrared imaging. ,  Roofing system. Moisture detection. Infrared imaging. Non-destructive testing.

Project(s):  Use of Infrared Imaging for Detecting Moisture in Roof Structures

Project code:  ES 006k

View document