KDR

report(s) found: 10000

Hybridization apprisal of forward OSMOSIS and Membrane utilization processes for seawater desalination

2022

KISR Report

Annual Progress Report No.3

Contributor(s):  Ahmed, M.

Subject(s):  Water ,  Water ,  Water quality ,  WAter quality ,  Draw solutions ,  Water purification ,  Separation processes ,  المحاليل الساحبة ,  تقنية المياه ,  عمليات الفصل ,  غشاء تقطير فجوة الهواء

Project(s):  Hybridization apprisal of forward OSMOSIS and Membrane utilization processes for seawater desalination

Project code:  WT 051C

View document

Investigation into the characterstics of household light Greywater in Kuwait

2022

KISR Report

Proposal

Contributor(s):  Abusam, A.

Subject(s):  Water quality management ,  Water quality management ,  Water quality ,  WAter quality ,  Wastewater ,  Domestic ,  non-toilet wastewater ,  treatment technologies ,  reuses ,  مياة صرف صحي ,  مياة صرف صحي من غير المرحاض ,  تقنيات المعالجة ,  إعادة استخدام

Project(s):  Investigation into the characterstics of household light Greywater in Kuwait

Project code:  WT 042C

View document

Ground motion modeling and structural monitoring of tall buildings

2021

KISR Report

Proposal

Contributor(s):  Al Qazweeni, J.

Subject(s):  Structural monitoring ,  Structural monitoring ,  Sensors ,  Sensors ,  Infrastructure ,  Structural health monitoring ,  Accelerometers ,  البنية التحية ,  مراقبة السلامة الإنشائية ,  المبابي العالية

Project(s):  Ground motion modeling and structural monitoring of tall buildings

Project code:  EU 124C

View document

Pilot study evaluation of photovoltaic cells and systems for application in Kuwait Petroleum Corporation carport,

2021

KISR Report

Proposal

Contributor(s):  Al Otaibi, Ahmad

Subject(s):  solar power ,  solar power ,  Electricity ,  Electricity ,  Carport ,  Optimal design ,  Energy ,  Grid-connected ,  Photovolatic ,  رائد في تصميمات الطاقة والبيئة ,  نظام كهروضوئي ,  موصولة بالشبكة ,  مواقف سيارات كهروضوئي

Project(s):  Pilot study evaluation of photovoltaic cells and systems for application in Kuwait Petroleum Corporation carport

Project code:  EA 062C

View document

Assessment of volatile organic compounds removal in wastewater treatment plants

2022

KISR Report

Final Report

Contributor(s):  Al Matouq, A.

Subject(s):  Water ,  Water ,  Seawage ,  Seawage ,  Kabd wastewater treatment plant ,  Benzene ,  Cancer ,  مياه الصرف ,  محطة كبد لمعالجة مياة ,  بنزين ,  سرطان

Project(s):  Assessment of volatile organic compounds removal in wastewater treatment plants

Project code:  WT 074K

View document

Precision plant production : Under the umberella of GI project "pilot study for utilization of modern technologies in sustainable local food production in support of Kuwait's food security" (P-KISR-17)

2021

KISR Report

Proposal

Contributor(s):  Bhat, N. R.

Subject(s):  Plant ,  Plant ,  Production ,  Production ,  الزراعة المستدامة ,  الطاقة المتجددة ,  بيئة زراعة خاضعة للتحكم ,  أنظمة الزراعة ,  الأمن الغذائي ,  Sustainable farming ,  Renewable energy ,  controlled environment agriculture ,  Farming systems ,  Food Security

Project(s):  Precision plant production : Under the umberella of GI project "pilot study for utilization of modern technologies in sustainable local food production in support of Kuwait's food security" (P-KISR-17)

Project code:  P-KISR-17-01

View document

Showcasing eco friendly agricultural production system for sustainable crop production and education

2021

KISR Report

Final Report

Contributor(s):  Al Mulla, L.

Subject(s):  Farming ,  Farming ,  Crops ,  Crops ,  الزراعة في البيئة المحكمة ,  البيوت المحمية ,  الكومبوست ,  Protected environment agriculture ,  greenhouse ,  aerobic composting

Project(s):  Showcasing eco friendly agricultural production system for sustainable crop production and education

Project code:  FA 169C

View document

Extension of Kuwait Energy outlook model to address economic perspective

2022

KISR Report

Proposal

Contributor(s):  Al Abdullah, Yousef

Subject(s):  Energy ,  Economic aspects ,  Form ,  Project ,  demand ,  Energy efficiency ,  Economics ,  Consumer ,  Power generation ,  Renewable energy ,  الطلب ,  كفاءة الطاقة ,  الأقتصاد ,  المستهلك ,  توليد الطاقة ,  الطاقة المتجددة

Project(s):  Extension of Kuwait Energy Outlook Leap Model to Address Economic Perspective

Project code:  EU 134K

View document

Real time structural monitoring and infrastructure asset management for bridges in Kuwait

2022

KISR Report

Annual Progress Report No. 2

Contributor(s):  Parol, J.

Subject(s):  Engineering ,  Engineering ,  Bridges ,  Bridges ,  Structural health monitoring ,  Finite element analysis ,  bridges ,  structural vibration ,  Natural freguency ,  Finite element analysis ,  Weigh in motion model ,  مراقبة الصحة الهيكلية ,  الجسور الأهتزاز الهيكلي تردد طبيعي ,  تحليل العناصر المحدودة

Project(s):  Real Time Structural Monitoring and Infrastructure Asset Management for Bridges in Kuwait

Project code:  EU 111C

View document

Slection of an effective Sewage sludge composting technology for Kuwait

2021

Proposal

Contributor(s):  Al Muzaini, Saleh

Subject(s):  Water ,  Sewage ,  The Soil ,  Technology ,  سماد طبيعي ,  محطة الصرف الصحي ,  الصرف الصحي ,  ملوثات ,  Compost ,  Sewage treatment plant ,  Sewage ,  Pollutant

Project code:  EM 072C

View document

Out-scaling Al Wafra industrial Wastewater treatment plant

2022

KISR Report

Annual Progress Report No. 2

Contributor(s):  Ahmed, M. E.

Subject(s):  Water ,  Wastewater ,  Pollutants ,  Pollutants ,  تقييم محطات معالجة مياه الصرف الصحي الصناعي ,  عمليات الأكسدة المتقدمة ,  تقنيات الموجات فوق الصوتية ,  التعديل التحديثي لمحطات معالجة مياه الصرف الصحي ,  نمذجة محطات معالجة مياه الصرف الصحي ,  Assessment of industrial wastewater treatment plant ,  Advanced oxidation processes ,  Ultrasound technology ,  retrofitting wastewater treatment plants ,  Wastewater treatment plants modeling

Project(s):  Out-Scaling Al Wafra Industrial Wastewater Treatment Plant

Project code:  WT 055C

View document

Special indicators and questionnaires for Kuwait's strategy to enhance integrity and combat corruption

2021

KISR Report

Proposal ( Amendment- A)

Contributor(s):  Alenezi, M.

Subject(s):  Economy ,  corruption ,  Economy ,  corruption ,  الفساد ,  النزاهة ,  الحوكمة ,  الأستراتيجية

Project(s):  Special Indicators and Questionnaires for Kuwait's Strategy to Enhance Integrity and Combat Corruption

Project code:  TE 066C

View document