KDR

report(s) found: 10000

Computer use for voice-training of deaf children. Phase 11.

1985

KISR Report

Pre-Proposal

Contributor(s):  Al-Matar, O.

Subject(s):  Deaf children. Voice training.

Project(s):  Computer Use for Voice Training of Deaf Children – Phase II

Project code:  EL 19

View document

Quality control and conformity testing of Al Adasani plastic pipes and fittings

2016

KISR Report

Progress Report No. 1

Contributor(s):  Al Arbeid, Amer.

Subject(s):  Quality control ,  Building materials ,  Laboratories ,  Energy Research ,  Construction and building material. ,  International standards. ,  Research activity. ,  Plastic pipes and tests specifications. ,  البناء ومواد البناء ,  اختبارات المعايير الدولية والمواصفات ,  الأنابيب البلاستيكية ,  تجهيزات ,  مراقبة الجودة وضمان أختبار المطابقة

Project(s):  Quality Control & Conformity Testing of Al-Adasani Plastic Pipes & Fittings

Project code:  EU 058S

View document

Review and updating of area traffic control system. Phase 1

1987

KISR Report

Proposal

Contributor(s):  Engineering Division.

Subject(s):  Arabic traffic control. Traffic control philosophis. Microprocessor-controlled traffic light. Traffic flow detectors. Communication.

Project(s):  Review & Updating of Area Traffic Control System - Phase I

Project code:  EL 17

View document

Surface enhancement of recycled concrete aggregates by the removal of attached mortar approach

2017

KISR Report

Technical Report

Contributor(s):  Al Fadala, Sherefa.

Subject(s):  Concrete ,  Physical properties ,  Absorption ,  Cement ,  Adsorption. ,  Classification. ,  Constituents. ,  Friable materials. ,  الامتصاص ,  المواد القابلة للتفتت ,  مكونات ,  تصنيف

Project(s):  Surface Enhancement of Recycled Concrete Aggregates by the Removal of Attached Mortar Approach

Project code:  EU 059G

View document

Bilingual Braille word-processing system

1987

KISR Report

Proposal

Contributor(s):  Qasem, H.

Subject(s):  Braille word-processor. Program development. Staff training. System installation.

Project(s):  Bilingual Braille Word-Processing System

Project code:  EL 16

View document

Bilingual Braille word-processing system

1987

KISR Report

Pre-Proposal

Contributor(s):  Al- Otaibi, Ahmad.

Subject(s):  Bilingual Braille word-processing system. Electronic Braille keyboards. Microelectronic technology. Handicapped. Auditory. Tactile. Visual media.

Project(s):  Bilingual Braille Word-Processing System

Project code:  EL 16

View document

Computer use for voice-training of deaf children. Phase 11.

1990

KISR Report

Final Report

Contributor(s):  Al-Matar, O.

Subject(s):  Arabization. Training program.

Project(s):  Computer Use for Voice Training of Deaf Children – Phase II

Project code:  EL 19

View document

ISDN study for Kuwait

1987

KISR Report

Proposal

Contributor(s):  Akhtar, H.

Subject(s):  ISDN. Telephone. Computer communications.

Project(s):  ISDN Study for Kuwait

Project code:  EL 20

View document

Computer use for voice training of deaf children

1985

KISR Report

Pre-Proposal

Contributor(s):  Qasem, H.

Subject(s):  Computer technology. Training deaf children. Arabization.

Project(s):  Computer Use for Voice Training of Deaf Children

Project code:  EL 15

View document

Computer use for voice training of deaf children

1985

KISR Report

Proposal

Contributor(s):  Qasem, H.

Subject(s):  Computer technology. Training deaf children. Arabization.

Project(s):  Computer Use for Voice Training of Deaf Children

Project code:  EL 15

View document

Evaluation of the structural integrity and safety of Kuwait's grand mosque,

2013

KISR Report

Final Report

Contributor(s):  Al Qazweeni, Jamal.

Subject(s):  Building materials ,  Building materials ,  Concrete constrution ,  Concrete constrution ,  Concrete. ,  Structural system. ,  Structural safety. ,  Geotechnical analysis. ,  Structural investigation. ,  Materials evaluation. ,  Roof girders. ,  Structural repair/strengthening. ,  Building codes.

Project(s):  Evaluation of the Structural Integrity & Safety of Kuwait's Grand Mosque

Project code:  EU 074C

View document

Bilingual Braille word-processing system

1988

KISR Report

Proposal

Contributor(s):  Qasem, H.

Subject(s):  Word processing. Staff programming. System installation. Program development.

Project(s):  Bilingual Braille Word-Processing System

Project code:  EL 16

View document