KDR

report(s) found: 10100

In situ thermal decomposition for the preparation ofnanosized metallic sulfide catalysts

2014

KISR Report

Final Report (Revised)

Contributor(s):  Perez, A.

Subject(s):  Catalysts. ,  Catalysts ,  Catalysts ,  Nanometer ,  Nanometer ,  Nanometer. ,  Organometallic complex. ,  Emulsion. ,  Emulsifier. ,  Nanoparticles. ,  Nanometer. ,  الأنحلال الحرارى. ,  مركبات المعدنية العضوية. ,  المستحلبات. ,  الجسيمات النانومترية. ,  نانوميتر.

Project(s):  In Situ Thermal Decomposition for the Preparation of Nanosized Metallic Sulfide Catalysts

Project code:  PF 046C

View document

Development of an improved catalyst for ultra deep desulfurization of diesel fuel,

2013

KISR Report

Progress Report No. 3

Contributor(s):  Al Dalama, Khaleda.

Subject(s):  Catalysts ,  Citric acid ,  Minerals ,  Sulfur ,  Nickel ,  Diesel fuels ,  Hydrotreating ,  Heat ,  Hydrotreating catalyst development. ,  Effect of complexing agents. ,  Support effects. ,  Trimetallic catalyst. ,  تطوير المواد الحفازة المستخدمة في عملية المعالجة الهيدروجينية ,  عامل التجميع ,  تأثيرات الدعائم ,  مواد حفازة ثلاثية المعادن

Project(s):  Development of an Improved Catalyst for Ultra Deep Desulfurization of Diesel Fuel

Project code:  PF 048K.

View document

Absorber temperature profile and collector field efficiency for the Sulaibiya solar power plant under extreme dust accumulation condition

1983

KISR Report

Technical Report

Contributor(s):  Moustafa, S.

Subject(s):  Temperature profile for solar absorbers. Dust effect on solar collector field. Sulaibiya Solar Power Plant.

Project(s):  Absorber Temperature Profile and Collector Field Efficiency for the Sulaibiya Solar Power Plant under Extreme Dust Accumulation Condition

Project code:  SE 41 KISR

View document

Spouted bed pilot plant design report

1983

KISR Report

Technical Report

Contributor(s):  El-Mowafy, A. M.

Subject(s):  Spouted bed. Coating of urea. Pilot plant. Molten sulphur or polymer.

Project(s):  Spouted Bed Pilot Plant Design Report

Project code:  PRO 10 KISR

View document

Effects on the operational economics of Kuwait's fishery fleet for various alternative port sites for Planning a multipurpose fishing harbor. Task 6

1989

KISR Report

Technical Report

Contributor(s):  Morgan, G. R.

Subject(s):  Computer modelling.

Project(s):  Multipurpose Harbor Study

Project code:  RFS 226

View document

Coating of urea for slow release of nitrogen

1984

KISR Report

Progress Report no. 2

Contributor(s):  Salman, O.

Subject(s):  Urea. Spouted-bed. Fluidized-bed. Encapsulating.

Project(s):  Coating of Urea for Slow Release of Nitrogen

Project code:  PRO 10

View document

Coating of urea for slow release of nitrogen

1983

KISR Report

Progress Report No. 1.

Contributor(s):  El-Mowafy, A. M.

Subject(s):  Urea. Polymers. Slow release fertilizer. Coating encapsulation. Spouted bed. Fluidized bed.

Project(s):  Coating of Urea for Slow Release of Nitrogen

Project code:  PRO 10

View document

Glass-reinforced polyester for greenhouses

1985

KISR Report

Final Report

Contributor(s):  Rasoul, F. A.

Subject(s):  Unsaturated polyester resin. Weathering characteristics. Greenhouses. Glazed materials. Transparency. Yellowness index. Protected agriculture.

Project(s):  Glass-Reinforced Polyester for Greenhouses

Project code:  PRO 18 KISR

View document

Rejuvenation of spent hydroprocessing catlsts:

1997

KISR Report

Progress Report no. 4

Contributor(s):  Marafi, M.

Subject(s):  Catalysts. ,  Spent catalyst. Activation. Jigging separation technique. Hydrodemetallation catalyst.

Project(s):  Rejuvenation of Spent Hydroprocessing Catlsts Studies on the Separation and the Utilization of the Spent Catalyst

Project code:  PT 001c

View document

Coating of urea for slow release of nitrogen

1983

KISR Report

Proposal

Contributor(s):  El-Mowafy, A. M.

Subject(s):  Coated urea. Slow-release. Nitrogen fertilizers. Encapsulation.

Project(s):  Coating of Urea for Slow Release of Nitrogen

Project code:  PRO 10 KISR

View document

Materials evaluation and selection for wet H2S service

2000

KISR Report

Progress Report nos. 2-4

Subject(s):  Carbon steel. ,  70/30 Cu-Ni. ,  Hydrogen sulfide cracking. ,  Corrosion rate. ,  Electrochemical measurement.

Project(s):  Materials Evaluation and Selection for Wet H2s Service

Project code:  PR 002C

View document

Materials evaluation and selection for wet H2S service

2001

KISR Report

Final Report

Subject(s):  Carbon steel. ,  Pressure vessel. ,  Hydrogen sulfide cracking. ,  Repair welding. ,  70/30 Cu-Ni. ,  Electrochemical measurement.

Project(s):  Materials Evaluation and Selection for Wet H2s Service

Project code:  PR 002C

View document