KDR

report(s) found: 1
Center: Energy and Building Research Center x

Project title: A joint Realization Study for an Application Programme with the 100 KW Solar Power Plant Integrated into a Food/water/Power System x

A joint realization study for an application programme with the 100 KW solar power plant integrated into a food/water/power system

1979

KISR Report

Proposal

Contributor(s):  Moustafa, S.

Subject(s):  Solar power plant. Food/water/power system.

Project(s):  A joint Realization Study for an Application Programme with the 100 KW Solar Power Plant Integrated into a Food/water/Power System

Project code:  SE 31 KISR/

View document