KDR

report(s) found: 638
Center: Engineering Division x

Advanced process control at Mina Al-Ahmadi refinery :

1995

KISR Report

Final Report

Contributor(s):  Kotob, S.

Subject(s):  Advanced control. Process control. Refinery. Refinery modernization. Benefit calculation. Multivariable control.

Project(s):  Advanced Process Control at Mina Al-Ahmadi Refinery - Master Plan Development & Control Implementation

Project code:  ES 002c

View document

Establishing a Braille publishing facility at Kuwait association for the blind

1997

KISR Report

Final Report

Contributor(s):  Al-Matter, O.

Subject(s):  Blind ,  Blind ,  Kuwait Blind Society. Establishing Braille facility. System maintenance.

Project(s):  Establishing a Braille Publishing Facility at Kuwait Association for the Blind

Project code:  ES005c

View document

Development of laser fluorosensor techniques for remote detection, identification and quantification of oil spills in the marine environment, Phase III

1996

KISR Report

Proposal

Contributor(s):  Quinn, M. F.

Subject(s):  Remote sensing. Fluorosensing. Spectral and temporal fluorescence characteristics.

Project(s):  Development of Laser Fluorosensor Techniques for Remote Detection, Identification & Quantification of Oil Spills in the marine Environment - Phase III

Project code:  ES 004e

View document

Advanced process control at Mina Al-Ahmadi refinery :

1995

KISR Report

Final Report

Contributor(s):  Kotob, S.

Subject(s):  Advanced control. Process control. Refinery. Refinery modernization. Benefit calculation. Multivariable control.

Project(s):  Advanced Process Control at Mina Al-Ahmadi Refinery - Master Plan Development & Control Implementation

Project code:  ES 002c

View document

Advanced process control at Mina Al-Ahmadi refinery:

1998

KISR Report

Final Report

Subject(s):  Real time optimization. ,  Advanced process control. ,  Benefits analysis.

Project(s):  Advanced Process Control at Mina Al-Ahmadi Refinery - Master Plan Development & Control Implementation

Project code:  ES 002C

View document

Feasibility study for the interconnection of the Gulf States electrical power systems

1984

KISR Report

Proposal

Contributor(s):  Sartawi, M.

Subject(s):  Feasibility of interconnection. Electrical networks.

Project(s):  Feasibility Study for the Interconnection of the Gulf States Electrical Power Systems

Project code:  ENG 26

View document

Grounding resistance for residential areas in Kuwait

1984

KISR Report

Pre-Proposal

Contributor(s):  Al-Abdulhadi, M.

Subject(s):  Grounding resistance. Residential areas. Kuwait.

Project(s):  Grounding Resistance for Residential Areas in Kuwait

Project code:  ENG 25

View document

Development of solar string conversion system - Phase I

1983

KISR Report

Proposal

Contributor(s):  Moustafa, S.

Subject(s):  Solar stirling. Solar thermal conversion. Modular solar electric system. Large solar parabolic system.

Project(s):  Development of Solar String Conversion System - Phase I

Project code:  ENG 24

View document

Reactive power control

1981

KISR Report

Proposal

Contributor(s):  Engineering Division.

Subject(s):  Power control.

Project(s):  Reactive Power Control

Project code:  ENG 23

View document

Feasibility study for the interconnection of the Arabian Gulf States electrical power systems. Phase ll

1986

KISR Report

Interim Report No. 4

Contributor(s):  Sartawi, M.

Subject(s):  Electrical power systems. Electrical interconnection. Gulf Cooperation Council.

Project(s):  Feasibility Study for the Interconnection of the Gulf States Electrical Power Systems

Project code:  ENG 26

View document

Determination of transfer capability objectives for the GCC interconnection study

1985

KISR Report

Interim Report No. 1

Contributor(s):  Debs, A. S.

Subject(s):  Power systems interconnected Arabian Gulf transfer cabability.

Project(s):  Feasibility Study for the Interconnection of the Gulf States Electrical Power Systems

Project code:  ENG 26

View document

Feasibility study for the interconnection of the Arabian Gulf States electrical power systems

1986

KISR Report

Final Report

Contributor(s):  Sartawi, M.

Subject(s):  Electrical generation planning. Electrical transmission planning. Interconnection of electric power systems.

Project(s):  Feasibility Study for the Interconnection of the Gulf States Electrical Power Systems

Project code:  ENG 26

View document