Failure of coal-tar-epoxy-mastic-painted steel pilings for the new oil pier at Mina Al-Ahmadi (MAA) refinery

2002

KISR Report

Technical Report

Contributor(s):  Husain, A.

Subject(s):  Coal-tar-epoxy coating. ,  Tubular steel pilings. ,  Coating failure. ,  Paint peeling.

Project(s):  Failure of Coal-Tar-Epoxy-Mastic-Painted Steel Pilings for the New Oil Pier at Mina Al-Ahmadi (MAA) Refinery

Project code:  EU 006S