KDR

report(s) found: 3
Center: Environment and Urban Development Division x

Project title: Feasibility for a Submarine Pipeline Type Seawater Intake Structure at Sabiya Power Plant x

Feasibility for a submarine pipeline type seawater intake structure at sabiya power plant

2008

KISR Report

Final Report

Contributor(s):  Neelamani, Subramaniam.

Subject(s):  Bathymetry ,  Suspended sediments ,  Power plant

Project(s):  Feasibility for a Submarine Pipeline Type Seawater Intake Structure at Sabiya Power Plant

Project code:  EC 068C

View document

Feasibility for a submarine pipeline type seawater intake structure at sabiya power plant

2008

KISR Report

Final Report

Contributor(s):  Neelamani, Subramaniam.

Subject(s):  Bathymetry ,  Suspended sediments ,  Power plant

Project(s):  Feasibility for a Submarine Pipeline Type Seawater Intake Structure at Sabiya Power Plant

Project code:  EC 068C

View document

Feasibility for a submarine pipeline type seawater intake structure at Sabiya power plant

2008

KISR Report

Proposal

Contributor(s):  Neelamani, Subramaniam.

Subject(s):  Water ,  Water ,  Saline water conversion ,  Saline water conversion ,  current measurement. ,  power station. ,  siltation. ,  wave and current action. ,  محطات القوى الكهربائية ,  الصبية ,  المغمورة ,  قياس التيارات البحرية

Project(s):  Feasibility for a Submarine Pipeline Type Seawater Intake Structure at Sabiya Power Plant

Project code:  EC 068C

View document