KDR

report(s) found: 1
Center: Environment and Urban Development Division x

Project title: Upgradation, regular upkeep and maintenance of hydraulics laboratory, wind tunnel facility and other infrastructure of the hydraulices laboratory./ x

Upgradation, regular upkeep and maintenance of hydraulics laboratory, wind tunnel facility and other infrastructure of the hydraulics laboratory.

2006

KISR Report

Technical Report

Contributor(s):  Neelamani, Subramaniam.

Subject(s):  Glass flume. ,  Wave basin. ,  Wave maker. ,  Lab and field instruments. ,  Calibration. ,  Physical model study.

Project(s):  Upgradation, regular upkeep and maintenance of hydraulics laboratory, wind tunnel facility and other infrastructure of the hydraulices laboratory./

Project code:  EC 015G

View document