KDR

report(s) found: 959
Center: Environment and Urban Development Division x

تطوير إستراتيجية لاستغلال مصادر الطاقة المتجددة لدولة الكويت

2012

KISR Report

Executive Summary

Contributor(s):  الصايغ، أسامه.

Subject(s):  الطاقة المتجددة ,  الطاقة المتجددة ,  مصادر الطاقة المتجددة.

Project(s):  Development of a Strategy for the Exploitation of Renewable Energy Resources for the State of Kuwait

Project code:  EA 038C

View document

Implementation of energy and power saving scheme in the avenues mall

2008

KISR Report

Proposal

Contributor(s):  Al Hadban, Yahya.

Subject(s):  Environmental auditing ,  Environmental auditing ,  Buildings ,  Buildings ,  Energy audit ,  Commercial mall ,  تدقيق الطاقة ,  مجمع تجاري

Project(s):  Implementation of Energy & Power Saving Scheme in the Avenues Mall

Project code:  EU 051C

View document

Evaluation and assessment of concrete produced by utilizing treated wastewater

2008

KISR Report

Proposal

Contributor(s):  Al Enezi, Naser.

Subject(s):  Sewage ,  Desalination ,  Fresh water ,  Concrete ,  Batches. ,  Desalinated water. ,  Tertiary and plants. ,  خرسانة ,  مياه صرف صحي معالجة

Project(s):  Evaluation & Assessment of Concrete Produced by Utilizing Treated Wastewater

Project code:  EU 054K

View document

Demand side management of major power consumers through optimum remote-control

2008

KISR Report

Amendment/Extension 'B'

Contributor(s):  Ali Al Mula Ali, Ahmad.

Subject(s):  Radioactive ,  Radioactive ,  Sulphates ,  Sulphates ,  Groundwater ,  Groundwater ,  Acidity ,  Acidity

Project(s):  Demand Side Management of Major Power Consumers through Optimum Remote Control

Project code:  EU 050C

View document

Evaluation of the effectiveness of the implemented treatment measures in the pilot area of Al Dhahar Phase III

2007

KISR Report

Proposal

Contributor(s):  Kamal, Hasan.

Subject(s):  Treatment ,  Rocks ,  The project ,  Cement ,  Sinkhole ,  Treatment ,  Cavities ,  Grout ,  Pilot ,  Injection ,  Implement ,  Tender ,  Evaluation ,  Subsidence ,  Risk ,  حفر ,  علاج ,  فجوات ,  ملاط ,  تجريبي ,  حقن ,  تطبيق ,  طرح ,  تقييم ,  هبوط ,  خطر

Project(s):  Evaluation of the Effectiveness of the Implemented Treatment Measures in the Pilot Area of Al-Dhahar - Phase III

Project code:  EU 049C

View document

Assessment of the electromagnetic field around the electrical secondary transformers in residential areas and schools

2012

KISR Report

Proposal

Contributor(s):  Al Bassam, Eitidal.

Subject(s):  Health ,  Health ,  Protection ,  Protection ,  Health effect. ,  Guidelines. ,  Residential houses. ,  المخاطر الصحية ,  مبادئ توجيهية ,  المنازل السكمية

Project(s):  Assessment of the Electromagnetic Field around the Electrical Secondary Transformers in Residential Areas & Schools

Project code:  EU 058C

View document

Multispecies bioassay for the safety evaluation of oil spill dispersants .

2005

KISR Report

Proposal

Contributor(s):  Beg, M.U.

Subject(s):  Oil Well Dispersants ,  Safety Evaluation ,  Bioassays

Project(s):  Multispecies Bioassay for the Safety Evaluation of Oil Spill Dispersants in ROPME Sea Area

Project code:  EM 007C

View document

Development of effective and water-efficient condenser pre-cooling system,

2010

KISR Report

Final Report

Contributor(s):  Al Hadban, Yahya.

Subject(s):  Air cooled engines ,  Water ,  Air- conditioning system with air-cooled condenser, condenser pre-cooling system ,  أنظمة تكييف الهواء المبردة هوائيا; التبريد المسبق للمكثف

Project(s):  Development of Effective & Water-Efficient Condenser Precooling System (2004-10-01)

Project code:  EU 024C

View document

Evaluation of the structural integrity and safety of Kuwait's grand mosque,

2013

KISR Report

Final Report

Contributor(s):  Al Qazweeni, Jamal.

Subject(s):  Building materials ,  Concrete ,  Of construction ,  Bridges ,  Concrete. ,  Structural system. ,  Structural safety. ,  Geotechnical analysis. ,  Structural investigation. ,  Materials evaluation. ,  Roof girders. ,  Structural repair/strengthening. ,  Building codes. ,  خرسانة ,  النظام الإنشائي ,  السلامة الإنشائية ,  التحليل الجيوتيقني ,  الدراسات الإنشائية ,  تقييم المواد ,  جسور السقف ,  التدعيم الإنشائي ,  كودات البناء

Project(s):  Evaluation of the Structural Integrity & Safety of Kuwait's Grand Mosque

Project code:  EU 074C

View document

Development of effective and water-efficient condenser precooling system. (2004-10-01).

2006

KISR Report

Proposal

Contributor(s):  Maheshwari, G.P.

Subject(s):  Air-cooled air-conditioning system. ,  Humidification efficiency.

Project(s):  Development of Effective & Water-Efficient Condenser Precooling System (2004-10-01)

Project code:  EU 024K

View document

Design of a sustainable, low- energy, traditional Kuwait house Phase I.

2013

KISR Report

Progress Report

Contributor(s):  Alghimlas, Fareed.

Subject(s):  Engineering ,  Engineering design ,  Buildings ,  Electricity ,  Electricity- consumption ,  Awareness ,  Passive design. ,  Residential sector. ,  Achievements. ,  تصميم السلبي ,  القطاع السكني ,  انجازات

Project(s):  Design of Sustainable, Low-Energy, Traditional Kuwait House – Phase I

Project code:  EU 073C

View document

Design of a sustainable, low-energy, traditional Kuwaiti house phase I

2012

KISR Report

Amendment/Extension 'A'

Contributor(s):  Al Ghimlas, Fareed.

Subject(s):  Buildings ,  Buildings ,  Energy ,  Energy

Project(s):  Design of Sustainable, Low-Energy, Traditional Kuwait House – Phase I

Project code:  EU 073C

View document