KDR

report(s) found: 959
Center: Environment and Urban Development Division x

Environmental baseline survey for the clean fuel project at mina Abdullah, mina Al-Ahmadi and Shuaiba refineries

2007

KISR Report

Amendment/Extension 'B'

Contributor(s):  Ramadan, Ashraf.

Subject(s):  Pollution ,  Pollution ,  Water ,  Water ,  Air pollution. ,  Soil. ,  Water analysis ,  Noise ,  تلوث الهواء ,  تحليل الهواء والتربة والماء والضوضاء

Project(s):  Environmental Baseline Survey for the Clean Fuel Project at Mina Abdullah, Mina Al-Ahmadi & Shuaiba Refineries

Project code:  EC 051C

View document

Upgradation, regular upkeep and maintenance of hydraulics laboratory and other infrastructure of the hydraulics laboratory

2008

KISR Report

Technical Report

Contributor(s):  Neelamani, Subramaniam.

Subject(s):  Hydraulic engineering ,  Hydraulic engineering ,  Lab and field instruments. ,  أجهزة القياس الحقلية والمختبرية. ,  جهاز توليد الأمواج. ,  حوض الأمواج. ,  Wave Maker.

Project(s):  Upgradation, Regular Upkeep & Maintenance of Hydraulics Laboratory & other Infrastructure of the Hydraulics Laboratory

Project code:  EC 027G

View document

Shore protection of the proposed promotory for Phase A2 of Khiran pearl city.

2004

KISR Report

Final Report

Contributor(s):  Rakha, Karim

Subject(s):  Shoreline changes. ,  Shore protection. ,  Oneline model. ,  Khiran area. ,  Sediment transport.

Project(s):  Shore Protection of the Proposed Promotory for Phase A2 of Khiran Pearl City

Project code:  EC 028C

View document

Environmental baseline survey for Mina Abdullah refinery expansion.

2007

KISR Report

Progress Report No. 1

Contributor(s):  Ramadan, Ashraf

Subject(s):  Air quality ,  Noise ,  Soil sampling ,  Alkaline soils ,  Air pollution. ,  Soil. ,  Noise. ,  تلوث الهواء ,  تربة ,  الضوضاء

Project(s):  Environmental Baseline Survey for the Clean Fuel Project at Mina Abdullah, Mina Al-Ahmadi & Shuaiba Refineries

Project code:  EC 051C

View document

Numerical model study and field data collection for the Al-Khiran pearlcity development :

2009

KISR Report

Final Report

Contributor(s):  Rakha, Karim

Subject(s):  Artificial lagoons ,  Tidal currents ,  Tidal flushing ,  RMA package ,  Advection dispersion

Project(s):  Numerical Modelling & Field Data Collection for Phases A3, A4, & A5 of Khairan Pearl City

Project code:  EC 035C

View document

Numerical modelling and field data collection for phases A3, A4 and A5 of Khiran Pearl City

2007

KISR Report

Progress Report No. 2

Contributor(s):  Rakha, Karim.

Subject(s):  Lagoons ,  Lagoons ,  Articial lagoons. ,  Tidal currents. ,  Tidal flushing. ,  RMA package. ,  Advection dispersion. ,  بحيرات اصطناعية. ,  التيارات المتولدة من المد. ,  تجدد المياة. ,  انتشار الملوثات.

Project(s):  Numerical Modelling & Field Data Collection for Phases A3, A4, & A5 of Khairan Pearl City

Project code:  EC 035C

View document

Wind tunnel assessment of Kuwait airport - VVIP shade structure.

2006

KISR Report

Final Report

Contributor(s):  Ramadan, A.

Subject(s):  Wind loads. ,  Surface pressure. ,  Area-averaged pressure.

Project(s):  Wind Tunnel Assessment of Kuwait Airport - VVIP Shade Structure

Project code:  EC 052C

View document

Environmental baseline survey for the clean fuel project at Mina Abdullah, Mina Al-Ahmadi and Shuaiba refineries

KISR Report

Final Report

Contributor(s):  Al-Menaie, H.S.

Subject(s):  Air pollution ,  Soil ,  Noise

Project(s):  Environmental Baseline Survey for the Clean Fuel Project at Mina Abdullah, Mina Al-Ahmadi & Shuaiba Refineries

Project code:  EC 051C

View document

An environmental database for Meiofauna and Microfauna in Northern Arabian Gulf,

2009

KISR Report

Technical Report

Contributor(s):  Talebi, L. A.

Subject(s):  Meiofauna-- periodicals ,  Marine invertebrates--periodicals ,  GIS, biodiversity, environmental impact assessment, marine environment ,  نظام المعلومات الجغرافية; التنوع الإحيائي; تقييم المردوود البيئي; البيئة البحرية

Project(s):  An Environmental Database for Meiofauna and Microfauna in Northern Arabian Gulf

Project code:  EM 038G

View document

Bubiyan Island environmental assessment and preparation of master plan.

2006

KISR Report

Final Report

Contributor(s):  Roy, W.

Subject(s):  Information technology. ,  Integrated information system. ,  Environmental data. ,  Database. ,  Data validation. ,  Data importing. ,  Data security. ,  Data control. ,  Mapping.

Project(s):  Bubiyan Island Environmental Assessment & Preparation of a Master Plan

Project code:  EA 017

View document

Providing technical support, consultancy and research with Kuwait university's DLC.

2006

KISR Report

Technical Report

Contributor(s):  Al-Matrouk, H.

Subject(s):  Qualitative video-conferencing. ,  Learning management. ,  System. ,  Moodle.

Project(s):  Providing Technical Support, Consultancy & Research with Kuwait University's DLC

Project code:  EA 015G

View document

Electric load forecasting by the year 2025:

2007

KISR Report

Final Report (Revised)

Contributor(s):  Al Sayegh, Osama Abdallah.

Subject(s):  Artificial neural networks. ,  Long-term forecasting. ,  Simulation model. ,  Socio-economic factors.

Project(s):  Electric Load Forecasting by the Year 2025: A/C Units Factor Effect

Project code:  EA 015C

View document