KDR

report(s) found: 3
Center: Environmental and Earth Sciences Division x

Project title: Optimization Test for the Recommended Modifications for the Shuaiba Intake-Outlet System x

Optimization test for the recommended modifications for the Shuaiba intake-outlet system. Vol. ll

1986

KISR Report

Final Report

Contributor(s):  Al-Madani, N.

Subject(s):  Shuaiba outlet-intake. Calibration curve. Temperature differentials. Calibration of flow meters.

Project(s):  Optimization Test for the Recommended Modifications for the Shuaiba Intake-Outlet System

Project code:  EES 79

View document

Optimization test for the recommended modifications for the Shuaiba intake-outlet system. Vol. l

1986

KISR Report

Final Report

Contributor(s):  Al-Madani, N.

Subject(s):  Shuaiba area. Thermal studies. Intake-outlet. Common channel.

Project(s):  Optimization Test for the Recommended Modifications for the Shuaiba Intake-Outlet System

Project code:  EES 79

View document

Optimization test for the recommended modifications for the Shuaiba intake-outlet system

1986

KISR Report

Proposal

Contributor(s):  Al-Madani, N.

Subject(s):  Design details. Backwater effects. Erosion and deposition. Temperature increases. Cost-benefit analysis.

Project(s):  Optimization Test for the Recommended Modifications for the Shuaiba Intake-Outlet System

Project code:  EES 79

View document